Dormitory
1 1/2 5 AVENUE
MANHATTAN · BIN 1078085
💬 Discuss this project
1932Year Built
5Stories
H8Building Class
R6Zoning
83,277 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized0 Open Violations
Dormitory · Owner of record: NEW YORK UNIVERSITY · 33,275 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction8p · 1 filing · 15 docs
Floor 1Under Construction8p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK UNIVERSITY8807/08/2026
BROSNA CONSTRUCTION GROUP103/22/2026
NYU REAL ESTATE1203/21/2026
NYU OFFICE OF CONSTRUCTION MGMT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LANGAN ENGINEERING107/28/2026
STAGEBERG ARCHITECTURE PLLC1003/11/2026
BELMONT FREEMAN ARCHITECTS406/29/2021
PAUL PERDEK, PROF. ENG. PLLC202/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BURNHAM NATIONWIDE INC1603/21/2026
CONVERSANO ASSOCIATES, INC.1203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJP INSTALLERS INCGeneral Contractor907/08/2026
HUDSON PLMBING & MCH, LLCPlumbing707/08/2026
BROSNA CONSTRUCTION CORPOGeneral Contractor607/08/2026
JAN VARJANElectrical403/21/2026
OMD ELECTRICAL CORPElectrical303/22/2026
MADZY, JOHNElectrical103/21/2026
JUMPER ELECTRIC CORPElectrical103/22/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC69421003/11/2026
Building Lifecycle
All (134)Filed (17)Permit Issued (16)Signed Off (9)Violation (30)Inspection (16)Objection (16)Special Inspection (30)
08/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Structural
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Structural
08/07/2026
Objection raised — Admin
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Scope
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Other
07/28/2026
Filed — Alteration
SUPPORT OF EXCAVATION FILING FOR REMOVAL OF EXISTING UNDERGROUND FUEL STORAGE TANK.
M01434141-I1
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/21/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Permit issued — Plumbing
M01332880-S1-PL
03/25/2026
Permit issued — General Construction
M01332880-I1-GC
03/11/2026
Filed — Alteration
Interior renovation of existing APT DP7 as per plans herewith. No change to use, occupancy or egress.
M01332880-S1
03/11/2026
Filed — Alteration
Interior renovation of existing APT DP7 as per plans herewith. No change to use, occupancy or egress.
M01332880-I1
01/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
01/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
08/29/2025
Signed off — Alteration
Plumbing modifications to an exiting apartment as per plans
M01137203-I1
08/29/2025
Signed off — Alteration
Plumbing modifications to an exiting apartment as per plans
M01137203-S1
07/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2025
Permit issued — Plumbing
M01137203-S1-PL
03/24/2025
Permit issued — General Construction
M01137203-I1-GC
02/13/2025
Filed — Alteration
Plumbing modifications to an exiting apartment as per plans
M01137203-S1
02/07/2025
Filed — Alteration
Plumbing modifications to an exiting apartment as per plans
M01137203-I1
11/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
11/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
11/13/2024
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
11/13/2024
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
11/04/2024
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
11/04/2024
Special inspection requirement — Lighting in dwelling units
AILANTO DANIEL MINAWI
11/04/2024
Special inspection requirement — Final
AILANTO DANIEL MINAWI
03/13/2024
Signed off — Alteration
filing herewith general construction to include interior renovation and minor demo to an existing apartment located on the 5th fl , apt # 57B
M00873685-S1
03/04/2024
Signed off — Alteration
general construction to include minor interior demolition and interior renovation to 2 existing apartments : one located on the 3rd fl, apt 32A and one on the 5th fl, apt# 53A
M00839379-I1
03/04/2024
Signed off — Alteration
filing herewith general construction to include interior renovation and minor demo to an existing apartment located on the 5th fl , apt # 57B
M00873685-I1
03/04/2024
Signed off — Alteration
Plumbing modifications to 2 existing apartments: 3rd fl apt 32A and 5th fl apt# 53A
M00839442-I1
10/31/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
10/02/2023
Filed — Alteration
filing herewith general construction to include interior renovation and minor demo to an existing apartment located on the 5th fl , apt # 57B
M00873685-P1
09/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
09/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2023
Permit issued — Plumbing
M00873685-S1-PL
08/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
08/10/2023
Filed — Alteration
Plumbing modifications to 2 existing apartments: 3rd fl apt 32A and 5th fl apt# 53A
M00839442-P1
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC04/09/2026
DOB NOWGeneral ConstructionPermit IssuedBROSNA CONSTRUCTION CORPO03/25/2026
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC03/27/2025
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO03/24/2025
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I08/11/2023
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO08/03/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC05/03/2023
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO04/25/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC05/14/2021
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC05/14/2021
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC04/16/2020
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC04/16/2020
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC02/10/2020
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/17/2020
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC02/05/2019
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/16/2019
BISOTISSUEDSKYLINE RESTORATION INC09/01/2021
BISOTISSUEDSKYLINE RESTORATION INC05/06/2021
BISOTISSUEDBROSNA CONSTRUCTION CORPO03/02/2021
BISOTISSUEDBROSNA CONSTRUCTION CORPO10/26/2020
BISOTISSUEDBROSNA CONSTRUCTION CORPO10/15/2020
BISOTISSUEDBROSNA CONSTRUCTION CORPO10/14/2020
BISOTISSUEDBROSNA CONSTRUCTION CORPO10/01/2020
BISOTISSUEDSKYLINE RESTORATION INC02/28/2020
BISOTISSUEDSKYLINE RESTORATION INC03/06/2019
BISEQISSUEDPJP INSTALLERS INC01/25/2019
BISPLISSUEDMEGA PLBG CORP11/19/2015
BISOTISSUEDVANGUARD CONSTRUCTION AND01/07/2015
BISMHISSUEDVANGUARD CONSTRUCTION AND01/07/2015
BISPLISSUEDMEGA PLBG CORP07/21/2014
BISOTISSUEDVANGUARD CONSTRUCTION AND05/14/2014
BISMHISSUEDVANGUARD CONSTRUCTION AND05/14/2014
BISMHISSUEDPOWER COOLING INC10/03/2013
BISPLISSUEDPARAMOUNT PLBG & HTG CORP01/30/2013
BISOTISSUEDJ LAWRENCE CONSTRCTN CORP10/22/2012
BISPLISSUEDEAST COAST MECHANICAL LLC10/18/2012
BISOTISSUEDJ LAWRENCE CONSTRCTN CORP10/05/2012
BISOTISSUEDPLAZA CONSTRUCTION CORP05/10/2012
BISOTISSUEDPLAZA CONSTRUCTION CORP05/10/2012
BISOTISSUEDPLAZA CONSTRUCTION CORP05/10/2012
+ 26 more permits on file
1 project · most recent 06/29/2021
Gas Water/Sanitary
FiledStatusContractorScope
06/29/2021Signed-offHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
8 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedCONDUCTOR ELECL SVCS INCGeneral Wiring
07/30/2025CompleteJUMPER ELECTRIC CORPGeneral Wiring
12/26/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
11/29/2023CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
03/07/2023Permit IssuedOMD ELECTRICAL CORP39 meters, 1 new_meters
11/16/2020CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
02/05/2020CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
01/11/2019CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 07/28/2026
FiledStatusContractorScope
07/28/2026——2 scope_items
1 project · most recent 03/11/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/11/2026Signed-offHUDSON PLMBING & MCH, LLCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
08/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/21/2026Tenant Protection Plan Compliance—special
07/21/2026Excavations - Sheeting, Shoring, and Bracing—special
07/21/2026Subsurface Conditions – Fill Placement & In-Place Density—special
01/06/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
01/05/2026Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
01/05/2026Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
12/11/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
12/11/2025FinalAILANTO DANIEL MINAWIprogress
12/11/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
11/13/2024Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
11/13/2024Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
11/13/2024Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
11/13/2024Lighting controlsAILANTO DANIEL MINAWIenergy_progress
11/04/2024Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
11/04/2024Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
11/04/2024Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
11/04/2024Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
11/04/2024FinalAILANTO DANIEL MINAWIprogress
10/17/2023Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
09/28/2023Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
08/11/2023Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
07/26/2023Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/14/2023Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
05/11/2023Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
05/11/2023Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
Latest 25 of 34.
▾Documents — 541 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch11
08/31/2026M00839379-I1Request digital key ↗
08/31/2026M00839442-I1Request digital key ↗
08/31/2026M00839442-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00354696-I1Request digital key ↗
08/15/2026M00358995-I1Request digital key ↗
08/15/2026M00358995-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00118914-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00118930-I1Request digital key ↗
▸Applications & Permits117
▸BISWORK PERMIT APPLICATION52
09/03/2021123516338Open ↗
05/06/2021123516338Open ↗
04/26/2021123516338Open ↗
Showing 3 of 52 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION47
08/31/2021123516338Open ↗
08/27/2021123516338Open ↗
08/18/2021123516338Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWLPC Approval/Permit14
08/30/2026M00873685-S1Open ↗
08/15/2026M00358995-I1Open ↗
08/13/2026M00358995-P1Open ↗
Showing 3 of 14 on file for this type
▸BISLL114/19 PERMIT RESTRICTION2
01/22/2021140954732Open ↗
09/18/2020123866593Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
11/06/2020140954732Open ↗
10/28/2020140954732Open ↗
▸Seals & Professional Certifications121
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
03/16/2020123866593Open ↗
03/16/2020123866593Open ↗
01/30/2020120724449Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
08/30/2026M00118930-I1Open ↗
08/29/2026M01137203-I1Open ↗
08/29/2026M01137203-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00118914-I1Open ↗
09/04/2026M00358995-I1Open ↗
08/31/2026M00839442-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026M01137203-S1Open ↗
09/01/2026M00839442-I1Open ↗
08/30/2026M00873685-P1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
09/19/2018123516338Open ↗
05/16/2014122006131Open ↗
07/24/2013121686979Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
07/24/2013121686979Open ↗
Showing 1 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/21/2019140827915Open ↗
09/19/2018123516338Open ↗
05/16/2014122006131Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/22/2020140954732Open ↗
01/21/2019140827915Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2020140954732Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/21/2019140827915Open ↗
▸Trade Schedules & Equipment41
▸BISSELF-CERT PLUMBING NOTICE16
12/28/2015122006131Open ↗
06/25/2015122006131Open ↗
03/25/2015122006131Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/14/2016121686979Open ↗
03/14/2016121686979Open ↗
03/14/2016121686979Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION3
06/05/2014120557780Open ↗
Showing 1 of 3 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/16/2014122006131Open ↗
▸Safety & Tenant Protection33
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISTenant Protection Plan and Notes6
09/22/2020140954732Open ↗
09/17/2020123919055Open ↗
03/16/2020123866593Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan4
08/15/2026M00358995-I1Open ↗
08/13/2026M00354696-I1Open ↗
08/13/2026M00358995-P1Open ↗
Showing 3 of 4 on file for this type
▸BISST-1: Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/31/2026M00839442-P1Open ↗
08/31/2026M00839442-I1Open ↗
08/30/2026M00873685-S1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/22/2020140954732Open ↗
08/31/2020123919055Open ↗
08/11/2020123866593Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0223MN191
11/30/2021123516338Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/24/2013121686979Open ↗
▸Energy Compliance22
▸BISAS-BUILT ENERGY ANALYSIS9
02/04/2022123866593Open ↗
01/24/2022123919055Open ↗
01/24/2022140954732Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/16/2020123866593Open ↗
09/19/2018123516338Open ↗
03/02/2016121686979Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/04/2022123866593Open ↗
01/24/2022140954732Open ↗
09/22/2020140954732Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/22/2020140954732Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY19
02/04/2022123866593Open ↗
01/24/2022123919055Open ↗
01/24/2022140954732Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs50
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
02/11/2022123866593Open ↗
01/25/2022140954732Open ↗
01/25/2022123919055Open ↗
Showing 3 of 17 on file for this type
▸BISLANDMARKS APPROVAL12
09/22/2020140954732Open ↗
09/14/2020123919055Open ↗
06/22/2020123866593Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
07/24/2013121686979Open ↗
Showing 1 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/31/2020123919055Open ↗
03/06/2019123516338Open ↗
Showing 2 of 6 on file for this type
▸BISLANDMARKS SIGNOFF4
02/04/2022123866593Open ↗
01/25/2022140954732Open ↗
01/25/2022123919055Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT33
02/04/2022123866593Open ↗
01/24/2022140954732Open ↗
08/31/2020123919055Open ↗
Showing 3 of 33 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/24/2022123919055Open ↗
11/30/2021123516338Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
10/28/2020140954732Open ↗
▸Filing & Intake Forms42
▸BISEFILING COVER SHEET21
08/26/2020123919055Open ↗
03/16/2020123866593Open ↗
03/16/2020123866593Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION9
08/31/2021123516338Open ↗
08/18/2021123516338Open ↗
11/06/2020140954732Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM8
09/01/2021123516338Open ↗
05/06/2021123516338Open ↗
05/05/2021123516338Open ↗
Showing 3 of 8 on file for this type
▸BISeFiling Job Application Cover Sheet4
09/22/2020140954732Open ↗
01/21/2019140827915Open ↗
Showing 2 of 4 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
01/25/2022140954732Open ↗
07/24/2013121686979Open ↗
Showing 2 of 4 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
12/15/2014120197795Open ↗
Showing 1 of 2 on file for this type
▸BISECCCNYS ANALYSIS1
06/15/2020123866593Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01332880-I1Open ↗