DOB03/23/1992VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
ECB09/28/2010WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR ALT II JOB#401811134 1/20/04 PERMIT EXPIRED 3/2/05 NOTED AT EXTERIOR REAR ROOF ENCLOSURE OVER 2ND FLOOR BALCONY AT EXTERIONothing owed — awaiting certificate of correction
ECB04/17/1992WORK WITHOUT A PERMIT. WORK NOTED: ADDITION ADDED TO SOUTH SIDE OF BUILDING CREATING A 2ND FLOOR. ADDITION SIZE APPROV. 30'X 10'. REMEDY: FILE PLANS AND OBTAIN PERMITS FOR WORK DONE IF FEASIBLE.Nothing owed — awaiting certificate of correction
Three families · 0.26 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (3)Violation (3)
09/28/2010
Violation issued (ECB, open)
Construction
04/17/1992
Violation issued (ECB, open)
Construction
03/23/1992
Violation issued (DOB, open)
VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE