← Back
BuildNYC
QUEENS
1-55 54TH AVENUE
QUEENS · BIN 4618307
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Active Violations ▸
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 341 - Queens, P.S. 341QUnder Construction21p · 6 filings · 20 docs
BulkheadP.S. 341 - QueensUnder Construction5p · 1 filing · 20 docs
Floor 5P.S. 341 - Queens, P.S. 341QUnder Construction4p · 3 filings · 20 docs
Floor 4P.S. 341 - Queens, P.S. 341QUnder Construction6p · 3 filings · 20 docs
Floor 3P.S. 341 - Queens, P.S. 341QUnder Construction5p · 3 filings · 20 docs
Floor 2P.S. 341 - Queens, P.S. 341QUnder Construction4p · 3 filings · 20 docs
Floor 1P.S. 341 - Queens, P.S. 341QUnder Construction20p · 6 filings · 20 docs
Site & exteriorP.S. 341QUnder Construction28p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority5910/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Costa Arch & Engineering503/17/2026
MRA Engineering111/07/2025
Tarek M. Zeid, PE610/10/2025
Hartland Engineering309/08/2025
Dseny Engineering Services505/12/2025
Keri Engineering307/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates1203/21/2026
MRA Engineering P C203/21/2026
Dseny Engineering Services1003/21/2026
Purcell Everett Architects603/21/2026
Costa403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Navillus TileScaffold710/04/2026
CM&E ConGeneral Contractor607/08/2026
Navillus TileGeneral Contractor409/24/2026
RMD ElectricElectrical303/21/2026
Eagle 1 Mechanicalspecialty_contractor204/09/2026
CM&E ConScaffold204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4001203/17/2026
Costa Architects & Engineering1321108/25/2025
Building Lifecycle
All (110)Filed (23)Permit Issued (20)Signed Off (5)Violation (5)Inspection (6)Objection (21)Special Inspection (30)
09/23/2026
Permit issued — Mechanical Systems
Q00825166-S1-MS
09/21/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/15/2026
Permit issued — Construction Fence
Q01229427-I1-FN
09/15/2026
Permit issued — Sidewalk Shed
Q01270312-I1-SH
09/14/2026
Permit issued — Protection and Mechanical Methods
Q01288295-I1-PMM
09/03/2026
Signed off — Alteration
Q01282022-I1
08/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2026
Permit issued — Boiler Equipment
Q00825166-I1-BE
05/22/2026
Violation issued (ECB, closed)
Construction
05/22/2026
Violation issued (ECB, open)
Construction
05/22/2026
Violation issued (ECB, open)
Unknown
05/22/2026
Violation issued (ECB, open)
Construction
05/21/2026
Violation issued (ECB, closed)
Construction
05/14/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/14/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/07/2026
Permit issued — General Construction
Q01368336-I1-GC
05/07/2026
Permit issued — General Construction
Q01370941-I1-GC
04/27/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Resolved
03/31/2026
Signed off — Alteration
FILING HEREWITH PARTIAL DEMOLITION FOR SITE CLEARANCE AND AN EXISTING ONE (1) STORY SHED AS PER DRAWING.
Q00822160-I1
03/27/2026
Objection raised — Other
03/27/2026
Objection raised — Admin
03/24/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/17/2026
Filed — Alteration
Q01370941-I1
03/17/2026
Filed — Alteration
HEREWITH FILING FOR NEW SEISMIC BRACES INSTALLATION FOR ELECTRICAL.
Q01368336-I1
03/12/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/12/2026
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
03/06/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
03/06/2026
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
03/05/2026
Permit issued — General Construction
Q01283831-S1-GC
03/05/2026
Permit issued — General Construction
Q01283831-I1-GC
02/05/2026
Objection resolved — Addressed
01/30/2026
Objection resolved — Addressed
01/24/2026
Objection resolved — Addressed
12/12/2025
Signed off — Alteration
FN/PS341Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # 421104147,Q00822160 Phase -1 of New School Building that includes Foundations and detention Tank for Early work package. NO CHANGE IN USE, OCCUPAN
Q01082433-I1
11/07/2025
Filed — Alteration
EQUIPMENT USED TO LOAD/UNLOAD MATERIALS & INSTALL VERTICAL PROTECTION SYSTEM, MESH AND CANTILEVERS
Q01315141-I1
11/07/2025
Permit issued — Protection and Mechanical Methods
Q01315141-I1-PMM
11/06/2025
Special inspection requirement — Preliminary
NEIL GREENBLATT
11/03/2025
Objection raised — Other
10/24/2025
Filed — Alteration
Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy.
Q01283831-S1
10/24/2025
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
10/24/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
10/14/2025
Objection raised — Other
10/10/2025
Filed — Alteration
CONSTRUCTION FENCE IN CONJUNCTION WITH 5 STORY NEW SCHOOL BUILDING AND ALL RELATED APPLICATIONS.
Q01229427-P1
10/03/2025
Signed off — Alteration
SOE/PS341Q - FOR TEMPORARY SUPPORT OF EXCAVATION SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # 421104147, Q01082433, Q00822160 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01084564-I1
09/18/2025
Permit issued — Protection and Mechanical Methods
Q01288295-I1-PMM
09/18/2025
Objection raised — Other
09/17/2025
Filed — Alteration
Q01288295-I1
09/17/2025
Special inspection requirement — Final
NELSON LOPEZ
09/11/2025
Permit issued — Sidewalk Shed
Q01270312-I1-SH
09/11/2025
Permit issued — Structural
Q01282022-I1-ST
09/11/2025
Permit issued — Construction Fence
Q01229427-I1-FN
09/09/2025
Filed — Alteration
Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy.
Q01283831-I1
09/09/2025
Permit issued — Support of Excavation
Q01084564-I1-SE
09/09/2025
Permit issued — Construction Fence
Q01082433-I1-FN
09/08/2025
Signed off — Alteration
SOD/PS341Q - FOR TEMPORARY SHORING OF DETENTION TANKS SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # 421104147,Q01082433 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01084583-I1
09/08/2025
Filed — Alteration
FILING HEREWITH PARTIAL DEMOLITION FOR SITE CLEARANCE AND AN EXISTING ONE (1) STORY SHED AS PER DRAWING.
Q00822160-P2
09/05/2025
Filed — Alteration
Q01282022-I1
09/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNavillus Tile09/23/2026
DOB NOWConstruction FencePermit IssuedNavillus Tile09/15/2026
DOB NOWSidewalk ShedPermit IssuedNavillus Tile09/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNavillus Tile09/14/2026
DOB NOWBoiler EquipmentPermit IssuedChampion Combustion06/09/2026
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile05/07/2026
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile05/07/2026
DOB NOWGeneral ConstructionPermit IssuedEagle 1 Mechanical03/05/2026
DOB NOWGeneral ConstructionPermit IssuedEagle 1 Mechanical03/05/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNavillus Tile11/07/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedNavillus Tile09/18/2025
DOB NOWSidewalk ShedPermit IssuedNavillus Tile09/11/2025
DOB NOWStructuralSigned-offNavillus Tile09/11/2025
DOB NOWConstruction FencePermit IssuedNavillus Tile09/11/2025
DOB NOWSupport of ExcavationSigned-offCM&E Con09/09/2025
DOB NOWConstruction FenceSigned-offCM&E Con09/09/2025
DOB NOWGeneral ConstructionSigned-offCM&E Con11/04/2024
DOB NOWSupport of ExcavationSigned-offCM&E Con09/20/2024
DOB NOWSupport of ExcavationSigned-offCM&E Con09/20/2024
DOB NOWConstruction FenceSigned-offCM&E Con09/12/2024
BISPLISSUEDEagle 1 Mechanical03/10/2026
BISSDISSUEDEagle 1 Mechanical12/04/2025
BISPLISSUEDL.L.G. Plumbing & Heating09/23/2025
BIS—ISSUEDNavillus Tile09/18/2025
BISPLISSUEDEagle 1 Mechanical09/18/2025
BISPLISSUEDEagle 1 Mechanical03/21/2025
BISPLISSUEDEagle 1 Mechanical03/18/2025
BISPLISSUEDEagle 1 Mechanical03/14/2025
BIS—ISSUEDCM&E Con12/05/2024
BIS—ISSUEDCM&E Con12/04/2024
1 project · most recent 07/23/2024
Generators
FiledStatusContractorScopeMake / Model / Capacity
07/23/2024Permit IssuedNavillus TileGenerators
Generators
Cummins C125D6D 125 kW · Generator ×2
5 projects · most recent 03/30/2026
General Wiring Lighting
FiledStatusContractorScope
03/30/2026Permit IssuedItz Electric—
11/06/2025Permit IssuedRMD ElectricGeneral Wiring, Lighting
11/06/2025Permit IssuedRMD Electric—
09/19/2025Permit IssuedRMD Electric—
04/03/2025Permit IssuedRMD Electric1 meters, 1 new_meters
2 projects · most recent 10/10/2025
Fence Sidewalk Shed
FiledStatusContractorScope
10/10/2025Permit IssuedNavillus TileFence
08/13/2025Permit IssuedNavillus TileSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/21/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/14/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/24/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
03/12/2026Post-installed AnchorsNELSON LOPEZspecial
03/12/2026Seismic Isolation SystemsNELSON LOPEZspecial
03/06/2026Post-installed AnchorsNELSON LOPEZspecial
03/06/2026Seismic Isolation SystemsNELSON LOPEZspecial
11/06/2025PreliminaryNEIL GREENBLATTprogress
10/24/2025Seismic Isolation SystemsNELSON LOPEZspecial
10/24/2025Post-installed AnchorsNELSON LOPEZspecial
09/17/2025FinalNELSON LOPEZprogress
09/04/2025Structural Stability – Alterations of existing buildings—special
09/04/2025Post-installed Anchors—special
08/22/2025Seismic Isolation SystemsPaul Antoniospecial
08/22/2025Post-installed AnchorsPaul Antoniospecial
08/18/2025FinalPaul Antonioprogress
05/16/2025Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
04/28/2025Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
12/19/2024Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
09/05/2024Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
07/31/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/31/2024Mechanical SystemsNELSON LOPEZspecial
07/31/2024Emergency and Standby Power Systems (Generator)NELSON LOPEZspecial
07/31/2024FinalNELSON LOPEZprogress
07/31/2024Post-installed AnchorsNELSON LOPEZspecial
07/31/2024Energy Code Compliance InspectionsNELSON LOPEZprogress
07/17/2024Energy Code Compliance InspectionsNELSON LOPEZprogress
07/17/2024FinalNELSON LOPEZprogress
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 341 - QueensEducationFloors 1–5, Roof
Project Q01368336 Alteration · Permit Entire · 03/17/2026
Project Q01370941 Alteration · Permit Entire · 03/17/2026
Project Q00825166 Alteration · Permit Entire · 02/14/2023
P.S. 341QEducationFloors 1–5, Roof
Project Q01283831 Alteration · Permit Entire · 09/09/2025
Project Q01082433 Alteration · LOC Issued · 08/12/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/25/2026Q00825166-P2Request digital key ↗
08/25/2026Q00825166-S1Request digital key ↗
08/25/2026Q00825166-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/21/2026Q01084583-I1Open ↗
08/21/2026Q01084564-P1Open ↗
08/21/2026Q01084564-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
10/03/2026Q01084564-P2Open ↗
09/01/2026Q01370941-I1Open ↗
09/01/2026Q01368336-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026Q00825166-P2Open ↗
08/24/2026Q00825166-S1Open ↗
08/23/2026Q00822160-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026Q01082433-I1Open ↗
08/13/2026Q01229427-P1Open ↗
08/13/2026Q01270312-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026Q00822160-I1Open ↗
▸Approvals, Objections & Sign-offs48
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/19/2026Q01282022-I1Open ↗
08/19/2026Q00822160-P2Open ↗
08/19/2026Q00822160-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)21
08/17/2026Q01370941-I1Open ↗
08/17/2026Q01368336-I1Open ↗
08/13/2026Q00825166-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/19/2026Q00822160-I1Open ↗
08/13/2026Q01084564-I1Open ↗
08/13/2026Q01082433-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form1
08/13/2026Q01056281-I1Open ↗
▸Other Documents28
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal22
08/17/2026Q01370941-I1Open ↗
08/17/2026Q01368336-I1Open ↗
08/13/2026Q00825166-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/19/2026Q00822160-I1Open ↗
08/13/2026Q01082433-I1Open ↗
08/13/2026Q01084564-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01084583-I1Open ↗
08/13/2026Q01084564-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00822160-I1Open ↗