HPD05/07/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD06/12/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB11/02/2013DUE TO SEVERE WEATHER CAUSE BY HURRICANE SANDY THE FOLLOWING DAMAGES OCCURED: DUE TO DAMAGES CAUSED BY FLOODING BOILER AND HOTWATER HEATER REPLACED WITH 1 BRADFORD WHITE HOTWATER HEATER AND 1 WILLIAMSON BOILER IN THE CELLAR. REMEDY: MAKE ALL NECESSARY REPAIRS AND OBTAIN ALL REQUIRED PERMITS WHERE APPLICABLE
Three families · 3,522 sf lot · 0.76 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.