← Back
Bungalow colony - cooperatively owned land
1 ALDEN PARK
BRONX · Throgs Neck-Schuylerville · BIN 2099325
💬 Discuss this project
1930Year Built
1Stories
A8Building Class
R4AZoning
15,438 sfGross Floor Area
13Units
Bungalow colony - cooperatively owned land · 16,500 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof1p · 1 filing · 6 docs
Floor 21p · 1 filing · 6 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT102/17/2022
Building Lifecycle
All (41)Filed (1)Objection (23)Special Inspection (17)
04/29/2022
Objection raised — Other
04/29/2022
Objection raised — Other
04/29/2022
Objection raised — Other
04/29/2022
Objection raised — Other
04/29/2022
Objection raised — Other
04/29/2022
Objection raised — Other
04/29/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/25/2022
Objection raised — Other
03/17/2022
Objection raised — Other
03/17/2022
Objection raised — Other
03/04/2022
Objection raised — Other
03/04/2022
Objection raised — Other
03/04/2022
Objection raised — Other
03/04/2022
Objection raised — Other
03/04/2022
Objection raised — Other
02/17/2022
Filed — Alteration
THIS APPLICATION IS BEING FILED AS PART OF THE EDGEWATER PARK COOPERATIVE AND AS PER PLANS REVIEWED AND APPROVED BY THE BOARD. PROPOSED ENLARGEMENT OF EXISTING SECOND FLOOR AND MINOR RENOVATIONS AT FIRST FLOOR. NO CHANGE TO OCCUPANCY, USE OR EGRESS
X00657035-I1
01/06/2022
Special inspection requirement — Interior lighting power
01/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/06/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/06/2022
Special inspection requirement — Air barrier - visual inspection
01/06/2022
Special inspection requirement — Insulation placement and R values
01/06/2022
Special inspection requirement — Energy Code Compliance Inspections
01/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
01/06/2022
Special inspection requirement — Structural Wood Frame
01/06/2022
Special inspection requirement — Fenestration areas
01/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
01/06/2022
Special inspection requirement — Air barrier — testing
01/06/2022
Special inspection requirement — Fenestration air leakage
01/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
01/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
01/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
01/04/2022
Special inspection requirement — Final
01/04/2022
Special inspection requirement — Mechanical Systems
Nothing on file for this building.
1 project · most recent 02/17/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
02/17/2022——Air Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 02/17/2022
Water/Sanitary
FiledStatusContractorScope
02/17/2022——Water/Sanitary
1 project · most recent 02/17/2022
Wood
FiledStatusContractorScope
02/17/2022——Wood
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/06/2022Interior lighting power—energy_progress
01/06/2022Fire-Resistant Penetrations and Joints—special
01/06/2022Structural Stability – Alterations of existing buildings—special
01/06/2022Air barrier - visual inspection—energy_progress
01/06/2022Insulation placement and R values—energy_progress
01/06/2022Energy Code Compliance Inspections—progress
01/06/2022Fire-Resistance Rated Construction—progress
01/06/2022Structural Wood Frame—progress
01/06/2022Fenestration areas—energy_progress
01/06/2022HVAC-R and service water heating equipment—energy_progress
01/06/2022Air barrier — testing —energy_progress
01/06/2022Fenestration air leakage—energy_progress
01/06/2022Fenestration and door U-factor and product ratings—energy_progress
01/06/2022HVAC-R and service water heating system controls—energy_progress
01/06/2022HVAC-R and service water piping design and insulation—energy_progress
01/04/2022Final—progress
01/04/2022Mechanical Systems—special
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026X00657035-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X00657035-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026X00657035-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00657035-S1Open ↗
08/15/2026X00657035-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X00657035-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X00657035-I1Open ↗