← Back
Two family brick
1 BEAUMONT STREET
BROOKLYN · BIN 3245863
💬 Discuss this project
1955Year Built
2Stories
B1Building Class
R3-1Zoning
3,050 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 4,004 sf lot · 0.76 FAR built
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 20 docs
Floor 2Under Construction16p · 2 filings · 20 docs
Floor 1Under Construction16p · 2 filings · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
Sub-BasementUnder Construction11p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2025$1.6M—Private party → Private party$541/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC808/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JP GENERAL CONTRACTOR &General Contractor304/09/2026
S & L PLUMBING INCPlumbing107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118508/17/2026
CEYLAN DESIGN AND CONSULT8422202/24/2026
Building Lifecycle
All (61)Filed (8)Permit Issued (4)Violation (1)Inspection (10)Objection (8)Special Inspection (30)
09/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
09/11/2026
Special inspection requirement — Final
YUNHO LEE
09/11/2026
Special inspection requirement — Lowest Floor Elevation
Xiao Huang
09/11/2026
Special inspection requirement — Air barrier - visual inspection
Xiao Huang
09/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
09/11/2026
Special inspection requirement — Ventilation and air distribution system
Xiao Huang
09/11/2026
Special inspection requirement — Fenestration areas
Xiao Huang
09/11/2026
Special inspection requirement — Fenestration air leakage
Xiao Huang
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
09/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
09/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
09/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
09/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
09/11/2026
Special inspection requirement — Mechanical Systems
Xiao Huang
09/11/2026
Special inspection requirement — Permanent certificate
Xiao Huang
09/11/2026
Special inspection requirement — Metering
Xiao Huang
09/11/2026
Special inspection requirement — Insulation placement and R values
Xiao Huang
09/11/2026
Special inspection requirement — Interior lighting power
Xiao Huang
09/11/2026
Special inspection requirement — Electric vehicle service equipment requirements
Xiao Huang
08/17/2026
Filed — Alteration
APPLICATION IS FILED FOR HORIZONTAL ENLARGEMENT IN THE FRONT PART ON FIRST AND SECOND FLOORS AND INTERIOR RENOVATION OF EXISTING TWO-FAMILY BRICK HOUSE AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01290663-P3
07/30/2026
Special inspection requirement — Final
YUNHO LEE
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
07/30/2026
Special inspection requirement — Mechanical Systems
Xiao Huang
07/30/2026
Special inspection requirement — Lowest Floor Elevation
Xiao Huang
07/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
Xiao Huang
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
07/30/2026
Special inspection requirement — Permanent certificate
Xiao Huang
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
07/30/2026
Special inspection requirement — Insulation placement and R values
Xiao Huang
04/10/2026
Objection raised — Other
04/10/2026
Objection raised — Other
04/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS SUBMITTED.
B01380733-I1
03/30/2026
Violation issued (ECB, closed)
Unknown
03/16/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/16/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/10/2026
Permit issued — Structural
B01290663-S1-ST
03/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2026
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK AND RELOCATED GAS EQUIPMENT IN CONJUNCTION WITH CONSTRUCTION JOB #B01290663.
B01290666-P1
02/24/2026
Filed — Alteration
APPLICATION IS FILED FOR HORIZONTAL ENLARGEMENT IN THE FRONT PART ON FIRST AND SECOND FLOORS AND INTERIOR RENOVATION OF EXISTING TWO-FAMILY BRICK HOUSE AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01290663-P2
02/13/2026
Filed — Alteration
APPLICATION IS FILED FOR HORIZONTAL ENLARGEMENT IN THE FRONT PART ON FIRST AND SECOND FLOORS AND INTERIOR RENOVATION OF EXISTING TWO-FAMILY BRICK HOUSE AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01290663-S1
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2026
Filed — Alteration
APPLICATION IS FILED FOR HORIZONTAL ENLARGEMENT IN THE FRONT PART ON FIRST AND SECOND FLOORS AND INTERIOR RENOVATION OF EXISTING TWO-FAMILY BRICK HOUSE AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01290663-P1
12/17/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
12/11/2025
Permit issued — General Construction
B01290663-I1-GC-CX
11/17/2025
Permit issued — General Construction
B01290663-I1-GC-CX
11/12/2025
Permit issued — Plumbing
B01290666-I1-PL
10/27/2025
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK AND RELOCATED GAS EQUIPMENT IN CONJUNCTION WITH CONSTRUCTION JOB #B01290663.
B01290666-I1
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/15/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Cost
10/09/2025
Objection raised — Zoning
10/09/2025
Objection raised — Admin
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJP GENERAL CONTRACTOR &03/10/2026
DOB NOWGeneral ConstructionPermit IssuedJP GENERAL CONTRACTOR &12/11/2025
DOB NOWGeneral ConstructionPermit IssuedJP GENERAL CONTRACTOR &11/17/2025
DOB NOWPlumbingPermit IssuedS & L PLUMBING INC11/12/2025
1 project · most recent 08/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedJP GENERAL CONTRACTOR &Heating and Air Conditioning Systems
Heat / Cool
Gree MUL36HP230V1R32A0 36,000 BTU · Condensing Unit ×2
Mitsubishi Electric MUL42HP230V1R32A0 42,000 BTU · Split System ×1
MZ-GS36NA 36,000 BTU · Split System ×6
1 project · most recent 02/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/24/2026Permit IssuedS & L PLUMBING INCGas, Water/Sanitary
1 project · most recent 11/16/2025
General Wiring
FiledStatusContractorScope
11/16/2025Permit IssuedFIRST STAR ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/16/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/16/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
09/11/2026Mechanical SystemsXiao Huangspecial
09/11/2026Fire-Resistant Penetrations and JointsXiao Huangspecial
09/11/2026Fire-Resistance Rated ConstructionXiao Huangprogress
09/11/2026Lowest Floor ElevationXiao Huangprogress
09/11/2026FinalYUNHO LEEprogress
09/11/2026Energy Code Compliance InspectionsXiao Huangprogress
09/11/2026Air barrier - visual inspectionXiao Huangenergy_progress
09/11/2026Fenestration areasXiao Huangenergy_progress
09/11/2026Fenestration air leakageXiao Huangenergy_progress
09/11/2026Electric vehicle service equipment requirementsXiao Huangenergy_progress
09/11/2026Ventilation and air distribution systemXiao Huangenergy_progress
09/11/2026HVAC-R and service water heating equipmentXiao Huangenergy_progress
09/11/2026Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
09/11/2026HVAC-R and service water piping design and insulationXiao Huangenergy_progress
09/11/2026HVAC-R and service water heating system controlsXiao Huangenergy_progress
09/11/2026Permanent certificateXiao Huangenergy_progress
09/11/2026MeteringXiao Huangenergy_progress
09/11/2026Insulation placement and R valuesXiao Huangenergy_progress
09/11/2026Interior lighting powerXiao Huangenergy_progress
07/30/2026Permanent certificateXiao Huangenergy_progress
07/30/2026Fire-Resistant Penetrations and JointsXiao Huangspecial
07/30/2026Mechanical SystemsXiao Huangspecial
07/30/2026Energy Code Compliance InspectionsXiao Huangprogress
07/30/2026FinalYUNHO LEEprogress
07/30/2026Fire-Resistance Rated ConstructionXiao Huangprogress
Latest 25 of 70.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026B01290663-S1Request digital key ↗
08/18/2026B01290663-P1Request digital key ↗
08/18/2026B01290663-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/18/2026B01290663-P3Open ↗
08/18/2026B01290663-P1Open ↗
08/18/2026B01290663-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B01290663-I1Open ↗
09/23/2026B01290663-I1Open ↗
09/23/2026B01290663-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026B01290663-P3Open ↗
08/18/2026B01290663-P1Open ↗
08/18/2026B01290663-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01290666-I1Open ↗
09/23/2026B01290663-I1Open ↗
09/01/2026B01290663-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/18/2026B01290663-P3Open ↗
08/18/2026B01290663-P1Open ↗
08/18/2026B01290663-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents12
▸DOB NOWSite Survey: Initial4
08/18/2026B01290663-P3Open ↗
08/18/2026B01290663-P1Open ↗
08/18/2026B01290663-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/18/2026B01290663-P3Open ↗
08/18/2026B01290663-P1Open ↗
08/18/2026B01290663-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/18/2026B01290663-P3Open ↗
08/18/2026B01290663-P1Open ↗
08/18/2026B01290663-I1Open ↗
Showing 3 of 4 on file for this type