Parochial school, yeshiva
Cardinal Spellman High School
1 CARDINAL SPELLMAN PLACE · BIN 2097413
💬 Discuss this project
1960Year Built
5Stories
W2Building Class
R5Zoning
306,540 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 4 likely answered 7 old, status unconfirmed ▸
Parochial school, yeshiva · Owner of record: Catholic High School Association · 508,300 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Cardinal Spellman HS13p · 1 filing · 16 docs
Floor 3Cardinal Spellman HS13p · 1 filing · 16 docs
Floor 2Cardinal Spellman HS12p · 1 filing · 16 docs
Floor 1Cardinal Spellman HS21p · 3 filings · 16 docs
Sub-BasementCardinal Spellman HS11p · 1 filing · 16 docs
Site & exteriorCardinal Spellman HS7p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cardinal Spellman High School1607/08/2026
Catholic High School Association103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ola Consulting Engineers612/02/2025
Green Design107/24/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147803/21/2026
New York & Company403/21/2026
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New American ConstructionScaffold603/21/2026
The Metro GroupGeneral Contractor303/21/2026
Alpha Maintenance & ElectricElectrical103/21/2026
National Mechanical Services PlumbingPlumbing107/08/2026
The Metro Group PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712612/02/2025
Building Lifecycle
All (113)Filed (7)Permit Issued (9)Signed Off (2)Violation (60)Inspection (5)Objection (8)Special Inspection (22)
09/10/2026
Signed off — Alteration
Plumbing work for Heating Plant replacement
X00872445-S1
01/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Zimmerman
12/15/2025
Special inspection requirement — Maintenance information
Howard Zimmerman
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Howard Zimmerman
12/02/2025
Filed — Alteration
Plumbing work for Heating Plant replacement
X00872445-P2
11/26/2025
Special inspection requirement — Maintenance information
Howard Zimmerman
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Zimmerman
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Howard Zimmerman
11/19/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
09/22/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Admin
09/04/2025
Filed — Alteration
Plumbing work for Heating Plant replacement
X00872445-P1
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Zimmerman
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Howard Zimmerman
07/15/2025
Special inspection requirement — Maintenance information
Howard Zimmerman
04/15/2025
Permit issued — Plumbing
X00872445-S1-PL
09/06/2024
Permit issued — Boiler Equipment
X01063175-I1-BE
09/06/2024
Permit issued — Boiler Equipment
X01063175-S1-BE
08/15/2024
Permit issued — Boiler Equipment
X01063175-I1-BE
08/14/2024
Permit issued — Boiler Equipment
X01063175-S1-BE
08/13/2024
Filed — Alteration
REPLACE TWO GAS/OIL BOILERS. REMOVE OIL TANK AND INSTALL REPLACEMENT OIL TANK.
X01063175-I1
08/13/2024
Filed — Alteration
REPLACE TWO GAS/OIL BOILERS. REMOVE OIL TANK AND INSTALL REPLACEMENT OIL TANK.
X01063175-S1
07/22/2024
Special inspection requirement — Maintenance information
Howard Zimmerman
07/22/2024
Special inspection requirement — Maintenance information
Howard Zimmerman
06/18/2024
Permit issued — Plumbing
X00872445-S1-PL
06/17/2024
Permit issued — General Construction
X00872445-I1-GC-CX
06/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Howard Zimmerman
06/11/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Howard Zimmerman
06/11/2024
Special inspection requirement — Heating Systems
Howard Zimmerman
06/11/2024
Special inspection requirement — Heating Systems
Howard Zimmerman
06/11/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Howard Zimmerman
06/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Howard Zimmerman
06/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Howard Zimmerman
06/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Howard Zimmerman
06/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Howard Zimmerman
06/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Howard Zimmerman
05/21/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
03/19/2024
Objection raised — Admin
03/19/2024
Objection raised — Cost
02/16/2024
Objection raised — Admin
02/08/2024
Filed — Alteration
Plumbing work for Heating Plant replacement
X00872445-S1
02/08/2024
Filed — Alteration
Plumbing work for Heating Plant replacement
X00872445-I1
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/31/2020
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL
X00199498-I1
06/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2020
Permit issued — Sidewalk Shed
X00199498-I1-SH
02/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offThe Metro Group Plumbing04/15/2025
DOB NOWBoiler EquipmentSigned-offRichard Mortman09/06/2024
DOB NOWBoiler EquipmentSigned-offRichard Mortman09/06/2024
DOB NOWBoiler EquipmentSigned-offRichard Mortman08/15/2024
DOB NOWBoiler EquipmentSigned-offRichard Mortman08/14/2024
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing06/18/2024
DOB NOWGeneral ConstructionPermit IssuedThe Metro Group06/17/2024
DOB NOWSidewalk ShedSigned-offNew American Construction03/03/2020
DOB NOWSidewalk ShedSigned-offNew American Construction07/25/2019
BISOTISSUEDJ.A. Jennings06/20/2008
BISOTISSUEDJ.A. Jennings06/26/2007
BISFPISSUEDActive Fire Extinguisher Co12/13/1999
BISPLISSUEDJ-J Plumbing11/25/1998
BISOTISSUEDCounty Fair Air Conditioning Co10/16/1998
BISOTISSUEDProcida Construction07/13/1998
BISPLISSUEDEast Coast Mechanical06/18/1996
1 project · most recent 12/02/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2025Permit IssuedThe Metro GroupHeating Systems
Heating
Fulton Fulton Vantage VTG-6000DF 6,000 BTU · Boiler ×4
1 project · most recent 12/02/2025
Gas
FiledStatusContractorScope
12/02/2025Signed-offThe Metro Group PlumbingGas
3 projects · most recent 04/06/2026
FiledStatusContractorScope
04/06/2026Permit IssuedTitan Electrical & Elev Contracting—
03/01/2024CompleteThe Metro Group Electric—
07/24/2019CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/09/2025Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
12/15/2025Fire-Resistant Penetrations and JointsHoward Zimmermanspecial
12/15/2025Maintenance informationHoward Zimmermanenergy_progress
12/15/2025Energy Code Compliance InspectionsHoward Zimmermanprogress
11/26/2025Maintenance informationHoward Zimmermanenergy_progress
11/26/2025Fire-Resistant Penetrations and JointsHoward Zimmermanspecial
11/26/2025Energy Code Compliance InspectionsHoward Zimmermanprogress
07/15/2025Fire-Resistant Penetrations and JointsHoward Zimmermanspecial
07/15/2025Energy Code Compliance InspectionsHoward Zimmermanprogress
07/15/2025Maintenance informationHoward Zimmermanenergy_progress
07/22/2024Maintenance informationHoward Zimmermanenergy_progress
07/22/2024Maintenance informationHoward Zimmermanenergy_progress
06/11/2024HVAC-R and service water heating system controlsHoward Zimmermanenergy_progress
06/11/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsHoward Zimmermanspecial
06/11/2024Heating SystemsHoward Zimmermanspecial
06/11/2024Heating SystemsHoward Zimmermanspecial
06/11/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsHoward Zimmermanspecial
06/11/2024HVAC-R and service water piping design and insulationHoward Zimmermanenergy_progress
06/11/2024HVAC-R and service water heating equipmentHoward Zimmermanenergy_progress
06/07/2024HVAC-R and service water heating equipmentHoward Zimmermanenergy_progress
06/07/2024HVAC-R and service water heating system controlsHoward Zimmermanenergy_progress
06/07/2024HVAC-R and service water piping design and insulationHoward Zimmermanenergy_progress
07/24/2019FinalBRIAN T. O'CONNORprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Cardinal Spellman HSEducationSub-basement, Floors 1–4
Project X01063175 Alteration · Permit Entire · 08/13/2024
Project X00872445 Alteration · Permit Entire · 02/08/2024
Project X00199498 Alteration · LOC Issued · 07/24/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/21/2026X01063175-I1Request digital key ↗
08/21/2026X01063175-S1Request digital key ↗
08/17/2026X00872445-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00199498-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
05/29/2020220705574Open ↗
05/21/2019220705574Open ↗
▸BISWORK PERMIT APPLICATION1
07/15/2019220705574Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026X01063175-S1Open ↗
09/23/2026X01063175-I1Open ↗
09/23/2026X01063175-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026X00872445-S1Open ↗
08/17/2026X00872445-P1Open ↗
08/17/2026X00872445-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X01063175-I1Open ↗
09/23/2026X01063175-S1Open ↗
09/08/2026X00872445-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/15/2019220705574Open ↗
07/15/2019220705574Open ↗
05/21/2019220705574Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/21/2019220705574Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/17/2026X00872445-S1Open ↗
08/17/2026X00872445-I1Open ↗
08/13/2026X01063175-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
07/15/2019220705574Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0726BX191
08/06/2020220705574Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
08/06/2020220705574Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/01/2019220705574Open ↗
05/21/2019220705574Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00872445-S1Open ↗
08/13/2026X00872445-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/06/2020220705574Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/06/2020220705574Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/06/2020220705574Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/13/2026X00872445-P1Open ↗
08/13/2026X00872445-I1Open ↗
08/13/2026X00872445-S1Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/15/2019220705574Open ↗
07/01/2019220705574Open ↗
05/21/2019220705574Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/06/2020220705574Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/06/2020220705574Open ↗
06/03/2020220705574Open ↗
05/29/2020220705574Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/03/2020220705574Open ↗
05/29/2020220705574Open ↗
▸BISEFILING COVER SHEET1
05/21/2019220705574Open ↗