Stadium, race track, baseball field
Yankee Stadium
1 EAST 161ST STREET · BIN 2114490
💬 Discuss this project
2006Year Built
6Stories
Q6Building Class
PARKZoning
1,290,000 sfGross Floor Area
1Units
LL97 Covered4 Active Violations 4 old, status unconfirmed ▸FDNY Report ↗
Stadium, race track, baseball field · Owner of record: NYC Department of Parks and Recreation · 634,335 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofYankee Stadium, Bad Bunny6p · 2 filings · 6 docs
Floor 2FOX Sports New York Yankees Post Season, Yankee Stadium +1Under Construction31p · 7 filings · 12 docs
Floor 1Yankee Stadium, NYU Graduation +2Under Construction60p · 34 filings · 13 docs
MezzaninePlumbing and sprinkler system modificationsUnder Construction4p · 1 filing · 3 docs
CellarYankee StadiumUnder Construction60p · 11 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Parks and Recreation28503/22/2026
New York Yankees Partnership303/21/2026
Trigger House103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Populous3007/01/2026
Clark Reder Engineering607/01/2026
Me Engineers505/17/2025
Thornton Tomasetti211/10/2023
McLaren Engineering Group105/18/2022
BKH Architect102/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants7703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consigli Construction CoGeneral Contractor1707/08/2026
Ace RentalGeneral Contractor907/08/2026
Winick ProductionsGeneral Contractor807/08/2026
Rael Automatic Sprinkler CoFire Protection408/14/2026
PMY ConstructionGeneral Contractor203/21/2026
Parkview P&HPlumbing207/08/2026
Balaton ConsultingSign hanger107/08/2026
Unity Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants2003905/17/2025
Atlas ATC Engineering8011110/14/2022
Building Lifecycle
All (215)Filed (45)Permit Issued (32)Signed Off (20)Violation (60)Inspection (12)Objection (16)Special Inspection (30)
08/13/2026
Permit issued — Sprinklers
X00942659-I1-EW-SP
07/15/2026
Signed off — Alteration
X01418213-S1
07/14/2026
Signed off — Alteration
X01418213-I1
07/06/2026
Permit issued — General Construction
X01418213-I1-GC
07/06/2026
Permit issued — General Construction
X01418213-S1-GC
07/01/2026
Filed — Alteration
X01418213-S1
07/01/2026
Filed — Alteration
X01418213-I1
06/25/2026
Filed — No Work
X01410813-I1
06/17/2026
Special inspection requirement — Final
Benjamin Plotnick
06/17/2026
Special inspection requirement — Final
Benjamin Plotnick
05/18/2026
Signed off — Alteration
X01378582-I1
05/13/2026
Permit issued — General Construction
X01378582-I1-GC
04/29/2026
Filed — Alteration
X01378582-I1
04/29/2026
Filed — No Work
X01378588-I1
03/26/2026
Special inspection requirement — Final
STEWART ERVIE
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Fire_Protection
03/12/2026
Objection raised — Fire_Protection
03/12/2026
Objection raised — Fire_Protection
03/12/2026
Objection raised — Plumbing
03/05/2026
Filed — No Work
X01363310-I1
10/20/2025
Violation issued (FDNY_NOV, closed)
10/20/2025
Violation issued (FDNY_ORDER, closed)
09/04/2025
Violation issued (FDNY_NOV, closed)
08/28/2025
Violation issued (FDNY_NOV, closed)
05/17/2025
Filed — Alteration
MODIFICATIONS TO PLUMBING AND SPRINKLER SYSTEMS IN CLUB HOUSE AND EQUIPMENT ROOM AREAS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00940091-P1
05/16/2025
Signed off — Alteration
ERECTION OF TEMPORARY TENT CANOPY TO SHELTER TEMPORARY PLATFORMS/STAGE ON YANKEE STADIUM FIELD FOR NYU COMMENCEMENT CEREMONY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01215055-I1
05/07/2025
Permit issued — General Construction
X01215055-I1-GC
05/02/2025
Violation issued (FDNY_ORDER, closed)
05/01/2025
Filed — Alteration
ERECTION OF TEMPORARY TENT CANOPY TO SHELTER TEMPORARY PLATFORMS/STAGE ON YANKEE STADIUM FIELD FOR NYU COMMENCEMENT CEREMONY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01215055-I1
05/01/2025
Filed — No Work
X01215065-I1
04/23/2025
Special inspection requirement — Final
STEWART ERVIE
04/03/2025
Violation issued (FDNY_ORDER, closed)
02/06/2025
Permit issued — Plumbing
X00942659-I1-EW-SP
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/19/2024
Signed off — Alteration
X01126137-I1
11/18/2024
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
11/18/2024
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
11/04/2024
Violation issued (FDNY_NOV, closed)
10/18/2024
Permit issued — Structural
X01126137-I1-ST
10/15/2024
Filed — Alteration
X01126137-I1
10/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2024
Filed — No Work
X01088365-I1
08/19/2024
Filed — No Work
X01088241-I1
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/24/2024
Signed off — Alteration
X00942575-I1
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2024
Signed off — Alteration
ERECTION OF TEMPORARY TENT CANOPY TO SHELTER TEMPORARY PLATFORMS/STAGE ON YANKEE STADIUM FIELD FOR NYU COMMENCEMENT CEREMONY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01032723-I1
05/14/2024
Permit issued — General Construction
X01032723-I1-GC
05/08/2024
Filed — Alteration
ERECTION OF TEMPORARY TENT CANOPY TO SHELTER TEMPORARY PLATFORMS/STAGE ON YANKEE STADIUM FIELD FOR NYU COMMENCEMENT CEREMONY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01032723-I1
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/30/2024
Filed — No Work
X01032759-I1
04/26/2024
Filed — No Work
X01033417-I1
04/24/2024
Signed off — Alteration
STRUCTURAL MODIFICATIONS IN CLUB HOUSE AND EQUIPMENT ROOM AREAS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00940107-I1
04/16/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 215 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co08/13/2026
DOB NOWGeneral ConstructionSigned-offWinick Productions07/06/2026
DOB NOWGeneral ConstructionSigned-offAce Rental07/06/2026
DOB NOWGeneral ConstructionSigned-offAce Rental05/13/2026
DOB NOWGeneral ConstructionSigned-offAce Rental05/07/2025
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co02/06/2025
DOB NOWStructuralSigned-offWinick Productions10/18/2024
DOB NOWGeneral ConstructionSigned-offAce Rental05/14/2024
DOB NOWStructuralSigned-offConsigli Construction Co03/29/2024
DOB NOWStructuralSigned-offConsigli Construction Co03/26/2024
DOB NOWPlumbingSigned-offParkview P&H02/14/2024
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co02/06/2024
DOB NOWPlumbingSigned-offParkview P&H01/09/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/29/2023
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/29/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2023
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/27/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2023
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/27/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co11/17/2023
DOB NOWMechanical SystemsSigned-offConsigli Construction Co11/17/2023
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler Co11/15/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co11/08/2023
DOB NOWMechanical SystemsSigned-offConsigli Construction Co11/08/2023
DOB NOWGeneral ConstructionSigned-offWinick Productions08/09/2023
DOB NOWGeneral ConstructionSigned-offAce Rental05/15/2023
DOB NOWStructuralSigned-offWinick Productions10/18/2022
DOB NOWGeneral ConstructionSigned-offWinick Productions08/23/2022
DOB NOWGeneral ConstructionSigned-offWinick Productions08/03/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co05/19/2022
DOB NOWGeneral ConstructionSigned-offAce Rental05/10/2022
DOB NOWGeneral ConstructionSigned-offPMY Construction02/05/2021
BISOTISSUEDWinick Productions09/20/2019
BISOTISSUEDAce Rental05/09/2019
BISOTISSUEDRI04/08/2019
BISOTISSUEDAce Rental05/14/2018
BISOTISSUEDRI03/12/2018
BISOTISSUEDWinick Productions10/13/2017
BISOTISSUEDStamford Tent & Equipment Co06/09/2017
BISOTISSUEDRI05/30/2017
+ 42 more permits on file
2 projects · most recent 05/17/2025
FiledStatusContractorScope
05/17/2025Permit IssuedRael Automatic Sprinkler Co156 heads
11/07/2023Permit IssuedRael Automatic Sprinkler Co—
2 projects · most recent 05/17/2025
Water/Sanitary Storm
FiledStatusContractorScope
05/17/2025Signed-offParkview P&HWater/Sanitary
11/07/2023Signed-offParkview P&HStorm, Water/Sanitary
3 projects · most recent 07/07/2025
General Wiring
FiledStatusContractorScope
07/07/2025Permit IssuedUnity Electric CoGeneral Wiring
02/14/2024Permit IssuedUnity Electric CoGeneral Wiring
02/12/2024Permit IssuedUnity Electric CoGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/30/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/17/2026FinalBenjamin Plotnickprogress
06/17/2026FinalBenjamin Plotnickprogress
03/26/2026FinalSTEWART ERVIEprogress
04/23/2025FinalSTEWART ERVIEprogress
11/18/2024Sprinkler SystemsChristopher Drutjonsspecial
11/18/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
11/18/2024Post-installed AnchorsChristopher Drutjonsspecial
04/09/2024FinalSTEWART ERVIEprogress
11/09/2023Post-installed AnchorsChristopher Drutjonsspecial
11/09/2023Structural Steel - WeldingChristopher Drutjonsspecial
11/09/2023Structural Steel - High Strength BoltingChristopher Drutjonsspecial
11/09/2023Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
11/09/2023Concrete - Cast-In-PlaceChristopher Drutjonsspecial
11/02/2023Post-installed AnchorsChristopher Drutjonsspecial
11/02/2023Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
10/31/2023Concrete - Cast-In-PlaceChristopher Drutjonsspecial
10/26/2023Sprayed fire-resistant materialsChristopher Drutjonsspecial
10/26/2023Interior lighting powerChristopher Drutjonsenergy_progress
10/26/2023Lighting controlsChristopher Drutjonsenergy_progress
10/03/2023Sprinkler SystemsChristopher Drutjonsspecial
10/03/2023Structural Steel - DetailsChristopher Drutjonsspecial
10/03/2023FinalChristopher Drutjonsprogress
09/28/2023Post-installed AnchorsChristopher Drutjonsspecial
09/28/2023Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
09/28/2023HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Yankee StadiumFitness / RecreationCellar, Floor 1
Project X01418213 Alteration · LOC Issued · 07/01/2026
Project X01215055 Alteration · LOC Issued · 05/01/2025
Project X01032723 Alteration · LOC Issued · 05/08/2024
Project X00940107 Alteration · LOC Issued · 10/31/2023
Project X00940073 Alteration · LOC Issued · 10/28/2023
Project X00940083 Alteration · LOC Issued · 10/27/2023
Project X00940091 Alteration · Permit Entire · 10/27/2023
Project X00907331 Alteration · LOC Issued · 08/04/2023
Project X00856331 Alteration · LOC Issued · 04/20/2023
Project X00708610 Alteration · LOC Issued · 05/18/2022
Project X00718640 Alteration · LOC Issued · 04/26/2022
Project X00464862 Alteration · LOC Issued · 02/03/2021
NYU GraduationEvents & gatheringsFloor 1
Project X01378582 Alteration · LOC Issued · 04/29/2026
FOX Sports New York Yankees Post SeasonSports / RecreationFloor 2
Project X01126137 Alteration · LOC Issued · 10/15/2024
TBS NY YankeesSports / RecreationFloor 2
Project X08018823 Alteration · LOC Issued · 10/14/2022
Bad BunnyEvents & gatheringsFloor 1
Project X00787037 Alteration · LOC Issued · 08/11/2022
MillenniumOfficeFloor 1
Project X00775718 Alteration · LOC Issued · 07/22/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 6,093 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch - Temporary Place of Assembly21
08/26/2026X00155952-I1Request digital key ↗
08/26/2026X00172608-I1Request digital key ↗
08/24/2026X00718603-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch20
08/24/2026X00718640-I1Request digital key ↗
08/24/2026X00708610-I1Request digital key ↗
08/24/2026X00775718-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00464862-I1Request digital key ↗
▸Applications & Permits1,063
▸BISPLAN / WORK APPROVAL APPLICATION519
03/05/2025210086208Open ↗
03/04/2025210086208Open ↗
03/07/2023210086208Open ↗
Showing 3 of 519 on file for this type
▸BISWORK PERMIT APPLICATION445
09/23/2019220714984Open ↗
05/10/2019220703068Open ↗
04/08/2019220697324Open ↗
Showing 3 of 445 on file for this type
▸BISPLACE OF ASSEMBLY82
03/02/2023210086208Open ↗
03/10/2022210086208Open ↗
03/12/2020210086208Open ↗
Showing 3 of 82 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
10/23/2017220345909Open ↗
Showing 1 of 4 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRequest for Certificate of Occupancy with Open Application(s) Cover Letter2
03/06/2020220555753Open ↗
04/27/2018220348693Open ↗
▸BISpw2 work permit application1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications1,897
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1,156
11/13/2019220697324Open ↗
11/13/2019220714984Open ↗
10/21/2019240185964Open ↗
Showing 3 of 1,156 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST335
09/20/2019220714984Open ↗
05/09/2019220703068Open ↗
04/08/2019220697324Open ↗
Showing 3 of 335 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM268
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 268 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT70
03/11/2020210086208Open ↗
09/20/2019220714984Open ↗
05/09/2019220703068Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature42
08/26/2026X00147400-I1Open ↗
08/26/2026X00155952-I1Open ↗
08/26/2026X00172608-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/21/2026X00942705-I1Open ↗
09/07/2026X00464862-I1Open ↗
08/30/2026X01215055-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/21/2026X00942705-I1Open ↗
08/28/2026X00942659-I1Open ↗
08/26/2026X00940091-P1Open ↗
Showing 3 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)1
09/24/2019210086208Open ↗
▸BISPROFESSIONAL/OWNER SIGNATURES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment298
▸BISSELF-CERT PLUMBING NOTICE105
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 105 on file for this type
▸BISSCHEDULE B - PLUMBING95
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 95 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-844
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
06/07/2018220360035Open ↗
03/14/2018220352758Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/07/2018220360035Open ↗
03/14/2018220352758Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos322
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER318
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 318 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance87
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS54
05/30/2019220555753Open ↗
12/26/2017220360035Open ↗
10/23/2017220345909Open ↗
Showing 3 of 54 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS23
05/30/2019220555753Open ↗
12/26/2017220360035Open ↗
10/23/2017220345909Open ↗
Showing 3 of 23 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Inspections & Test Reports47
▸BISHYDRAULIC FLOW CALCULATIONS39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
05/30/2019220555753Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs1,135
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST471
03/06/2020220555753Open ↗
03/06/2020220555753Open ↗
12/10/2019220555753Open ↗
Showing 3 of 471 on file for this type
▸BISADMINISTRATIVE OBJECTIONS341
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 341 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION304
11/13/2019220697324Open ↗
09/20/2019220714984Open ↗
05/30/2019220555753Open ↗
Showing 3 of 304 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
03/19/2020220555753Open ↗
02/20/2020220555753Open ↗
02/12/2020220555753Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/13/2026X00942575-I1Open ↗
08/13/2026X00942659-I1Open ↗
08/13/2026X00464862-I1Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISART COMM APPROVAL: CITY OWNED PROPERTY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLetter- Approved Fab Cert, Intent1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00464862-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X00464862-I1Open ↗
▸Cost, Insurance & Ownership737
▸BISCOST AFFIDAVIT729
11/13/2019220697324Open ↗
11/13/2019220714984Open ↗
10/21/2019240185964Open ↗
Showing 3 of 729 on file for this type
▸BISLL58-88 CIVIL PENALTY AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms439
▸BISEFILING COVER SHEET375
09/20/2019220714984Open ↗
05/09/2019220703068Open ↗
04/08/2019220697324Open ↗
Showing 3 of 375 on file for this type
▸BISADDITIONAL INFORMATION35
03/05/2025210086208Open ↗
03/07/2023210086208Open ↗
03/14/2022210086208Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM27
03/19/2020220555753Open ↗
03/06/2020220555753Open ↗
03/06/2020220555753Open ↗
Showing 3 of 27 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents9
▸BISPLOT DIAGRAM4
05/30/2019220555753Open ↗
Showing 1 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/02/2023210086208Open ↗
03/10/2022210086208Open ↗