← Back
Office only, 7-19 stories
Public Art Fund
1 EAST 53 STREET · Midtown-Times Square · BIN 1035725
💬 Discuss this project
1927Year Built
16Stories
O3Building Class
C5-3Zoning
26,842 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFISP: SAFE
Office only, 7-19 stories · 2,513 sf lot · 10.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 7 filings · 15 docs
Floor 171 filing
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Under Construction1 filing · 6 docs
Floor 10
Floor 9
Floor 8Under Construction1 filing · 6 docs
Floor 7Under Construction5p · 3 filings · 20 docs
Floor 6
Floor 55p · 1 filing · 20 docs
Floor 4
Floor 39p · 4 filings
Floor 27p · 4 filings
Floor 13 filings
Cellar3p · 2 filings
Site & exteriorUnder Construction6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILLIAM S PALEY FOUNDATION7509/13/2026
WHIS PALEY C FOUNDATION203/21/2026
WH S PALEY FOUNDATION203/21/2026
JOHN GALLIN & SON CONSTRUCTION103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING6003/21/2026
GREEN STUDIO603/21/2026
THE GREEN STUDIO403/21/2026
UNITED SAFETY CONSULTANTS303/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L203/21/2026
AE DESIGN SOLUTION603/21/2026
J. CALLAHAN CONSULTING, INC.103/21/2026
MILLENNIUM DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor2307/10/2026
JOHN GALLIN & SON, INCGeneral Contractor1707/08/2026
PRESERV BLD RESTOR MGT INGeneral Contractor507/08/2026
BEDROCK PLBG. & HTG., INCPlumbing307/08/2026
COSMOPOLITAN CONSTRUCTIO*General Contractor207/08/2026
PATRIOT ELECTRIC CORPElectrical203/22/2026
ALLSTATE SPRINKLER LLCFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SONI ENGINEERING CONSULTI9819206/23/2026
RYAN SPECIAL ENGINEERING2018303/26/2026
SPECIAL TESTING & CONSULT16882002/12/2026
DOMANI INSPECTION SERVICE843309/19/2025
IVAN DESIGN ENGINEERING &6983207/18/2023
G. SWITZER ARCHITECTURE,1396205/03/2023
Building Lifecycle
All (263)Filed (51)Permit Issued (41)Signed Off (20)Facade (FISP) (19)Violation (41)Inspection (9)Objection (52)Special Inspection (30)
10/01/2026
Permit issued — Sidewalk Shed
M01370173-I1-SH
08/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01370173-S1
07/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01370173-S2
07/09/2026
Permit issued — Protection and Mechanical Methods
M01370173-S2-PMM
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/01/2026
Objection raised — Other
07/01/2026
Objection resolved — Addressed
07/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
07/01/2026
Special inspection requirement — Post-installed Anchors
nayan soni
06/23/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1 added tieback lifeline anchor detail
M01363017-P1
06/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
06/23/2026
Special inspection requirement — Post-installed Anchors
nayan soni
06/22/2026
Permit issued — General Construction
M01315028-I1-GC
06/22/2026
Permit issued — Sidewalk Shed
M01370173-I1-SH
06/11/2026
Permit issued — Mechanical Systems
M01300212-I1-MS
06/10/2026
Permit issued — General Construction
M01308884-I1-GC
05/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00921340-I1
04/24/2026
Objection resolved — Resolved
04/24/2026
Objection resolved — Resolved
04/24/2026
Objection resolved — Resolved
04/24/2026
Objection resolved — Resolved
04/23/2026
Objection raised — Other
04/23/2026
Objection raised — Other
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Scope
03/26/2026
Filed — Alteration
HVAC DESIGN 7TH FLOOR WITH AIR-COOLED, SPLIT-SYSTEM, HEAT PUMP AIR CONDITIONING SYSTEMS TO SERVE COOLING LOAD AND SUPPLEMENT HEATING LOAD.
M01300212-I1
03/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01370173-S1
03/25/2026
Filed — Alteration
Minor interior construction of non-load bearing partitions and install of new interior finishes within the existing 7th floor space. Scope of work does not entail the change of use, egress or occupancy.
M01308884-I1
03/25/2026
Permit issued — Supported Scaffold
M01370173-S1-SF
03/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01370173-I1
03/24/2026
Permit issued — Sidewalk Shed
M01370173-I1-SH
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
03/10/2026
Permit issued — Suspended Scaffold
M01363017-I1-SC
03/03/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1 added tieback lifeline anchor detail
M01363017-I1
02/12/2026
Filed — Alteration
Facade repair
M01315028-I1
12/10/2025
Signed off — Alteration
Build out of office on 5th floor
M01181602-S1
11/06/2025
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
11/06/2025
Special inspection requirement — Final
Juan Kuriyama
11/05/2025
Signed off — Alteration
Build out of office on 5th floor
M01181602-I1
10/27/2025
Special inspection requirement — Final
Gregory Switzer
10/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
10/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
10/09/2025
Special inspection requirement — Final
William Ryan
10/09/2025
Special inspection requirement — Mechanical Systems
William Ryan
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
09/23/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/23/2025
Special inspection requirement — Final
JOHN MCMONAGLE
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
09/23/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
09/19/2025
Filed — Alteration
Build out of office on 5th floor
M01181602-P1
06/10/2025
Permit issued — General Construction
M01181602-S1-GC
06/09/2025
Permit issued — Mechanical Systems
M01181602-S2-MS
05/21/2025
Filed — Alteration
Build out of office on 5th floor
M01181602-S2
05/06/2025
Filed — Alteration
Build out of office on 5th floor
M01181602-S1
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/16/2025
Permit issued — General Construction
M01181602-I1-GC
Latest 60 of 263 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC10/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC07/09/2026
DOB NOWGeneral ConstructionPermit IssuedPRESERV BLD RESTOR MGT IN06/22/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC06/22/2026
DOB NOWMechanical SystemsPermit IssuedCOSMOPOLITAN CONSTRUCTIO*06/11/2026
DOB NOWGeneral ConstructionPermit IssuedCOSMOPOLITAN CONSTRUCTIO*06/10/2026
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/25/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/24/2026
DOB NOWSuspended ScaffoldPermit IssuedPRESERV BLDNG RST MNGMT I03/10/2026
DOB NOWGeneral ConstructionSigned-offJOHN GALLIN SON06/10/2025
DOB NOWMechanical SystemsSigned-offJOHN GALLIN SON06/09/2025
DOB NOWGeneral ConstructionSigned-offJOHN GALLIN SON04/16/2025
DOB NOWSuspended ScaffoldSigned-offPRESERV BLDNG RST MNGMT I02/18/2025
DOB NOWPlumbingSigned-offALLSTATE SPRINKLER LLC08/22/2024
DOB NOWStructuralSigned-offJOHN GALLIN SON04/11/2024
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN03/04/2024
DOB NOWConstruction FenceSigned-offJOHN GALLIN SON02/29/2024
DOB NOWSuspended ScaffoldSigned-offPRESERV BLDNG RST MNGMT I01/10/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC01/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC01/02/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC01/02/2024
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC12/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRESERV BLD RESTOR MGT IN10/11/2023
DOB NOWGeneral ConstructionSigned-offJOHN GALLIN SON09/27/2023
DOB NOWMechanical SystemsSigned-offJOHN GALLIN SON09/26/2023
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN09/05/2023
DOB NOWStructuralSigned-offJOHN GALLIN SON06/14/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC06/14/2023
DOB NOWMechanical SystemsSigned-offJOHN GALLIN SON06/09/2023
DOB NOWGeneral ConstructionSigned-offJOHN GALLIN SON05/08/2023
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC05/05/2023
DOB NOWStructuralSigned-offJOHN GALLIN SON03/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC01/17/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC01/13/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC01/13/2023
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC12/16/2022
DOB NOWMechanical SystemsSigned-offJOHN GALLIN SON12/15/2022
DOB NOWGeneral ConstructionSigned-offJOHN GALLIN SON12/15/2022
+ 19 more permits on file
2 projects · most recent 03/26/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2026Permit IssuedCOSMOPOLITAN CONSTRUCTIO*Air Conditioning Systems
Cooling
Mitsubishi Electric MXZ-5D42NL 43,000 BTU · Heat Pump Outdoor ×1
Mitsubishi # MXZ-5D42NL 43,000 BTU · Heat Pump Outdoor ×1
09/19/2025Signed-offJOHN GALLIN & SON, INCAir Conditioning Systems
Cooling
Trane MXZ-5D36NL 360,000 BTU · Condensing Unit ×2
12 projects · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedHESO ELECTRICAL INCGeneral Wiring
05/12/2026CompletePATRIOT ELECTRIC CORPGeneral Wiring
03/13/2026Permit IssuedTOP SHELF ELECTRIC CORP—
08/12/2025Permit IssuedMRD ELEC'L SERVICES, INCGeneral Wiring
01/31/2025CancelledPATRIOT ELECTRIC CORPGeneral Wiring
04/04/2024CompleteEPIC ELECTRIC INCGeneral Wiring
03/08/2024CompletePATRIOT ELECTRIC CORPGeneral Wiring
03/05/2024CompletePATRIOT ELECTRIC CORPGeneral Wiring
12/27/2022CompleteTOP SHELF ELECTRIC CORP—
12/15/2022CompletePATRIOT ELECTRIC CORPGeneral Wiring
12/15/2022CompletePATRIOT ELECTRIC CORP—
03/03/2021Permit IssuedROBERT CHIMENTI2 meters, 1 new_meters
1 project · most recent 07/09/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/09/2026Permit IssuedSPRING SCAFFOLDING LLCScaffold, Sidewalk Shed
1 project · most recent 06/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/23/2026Permit IssuedPRESERV BLDNG RST MNGMT ISuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
07/01/2026Post-installed Anchorsnayan sonispecial
07/01/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
06/23/2026Post-installed Anchorsnayan sonispecial
06/23/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
03/12/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/06/2025FinalJuan Kuriyamaprogress
11/06/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
10/27/2025FinalGregory Switzerprogress
10/09/2025Mechanical SystemsWilliam Ryanspecial
10/09/2025FinalWilliam Ryanprogress
10/09/2025HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
10/09/2025HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
10/09/2025HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
10/09/2025Energy Code Compliance InspectionsWilliam Ryanprogress
10/09/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
09/23/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
09/23/2025Mechanical SystemsJOHN MCMONAGLEspecial
09/23/2025FinalJOHN MCMONAGLEprogress
09/23/2025Maintenance informationJOHN MCMONAGLEenergy_progress
04/29/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/31/2025Lighting controlsJOHN MCMONAGLEenergy_progress
03/31/2025Interior lighting powerJOHN MCMONAGLEenergy_progress
03/31/2025FinalJOHN MCMONAGLEprogress
02/14/2025FinalBennett Fradkinprogress
09/30/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 90.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SynergosOfficeFloor 7
Project M01300212 Alteration · Permit Entire · 03/26/2026
Project M01308884 Alteration · Permit Entire · 03/25/2026
Carmel Hill FundOfficeFloors 2, 3
Project M00867862 Alteration · LOC Issued · 05/03/2023
Project M00867894 Alteration · LOC Issued · 05/03/2023
Project M00864993 Alteration · LOC Issued · 04/26/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 338 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch51
09/01/2026M08008557-I1Request digital key ↗
09/01/2026M08008557-P1Request digital key ↗
09/01/2026M08007057-P1Request digital key ↗
Showing 3 of 51 on file for this type
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION11
05/11/2018123119339Open ↗
04/09/2018123068410Open ↗
11/08/2017123119339Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/28/2017123119339Open ↗
08/23/2017123119696Open ↗
04/13/2017123068410Open ↗
Showing 3 of 7 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
11/27/2018123068410Open ↗
06/21/2014120925785Open ↗
▸Seals & Professional Certifications137
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/01/2026M08008557-I1Open ↗
09/01/2026M08008557-P1Open ↗
09/01/2026M08007057-P1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/23/2026M01181602-S2Open ↗
09/23/2026M01181602-S2Open ↗
09/23/2026M01181602-S2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
09/29/2026M08009341-I1Open ↗
09/23/2026M01181602-S2Open ↗
09/02/2026M01181602-S1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
11/01/2018123119339Open ↗
08/20/2018123119696Open ↗
08/28/2017123119339Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/28/2017123119339Open ↗
08/23/2017123119696Open ↗
04/13/2017123068410Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/28/2017123119339Open ↗
08/23/2017123119696Open ↗
04/13/2017123068410Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/06/2012121362140Open ↗
12/19/2011120925785Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/29/2013140066096Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/29/2013140066096Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA2
09/23/2014121869326Open ↗
05/27/2014121869326Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/28/2017123119339Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/01/2026M08008557-P1Open ↗
09/01/2026M08008557-I1Open ↗
09/01/2026M08007057-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/31/2026M00867862-I1Open ↗
08/31/2026M00867894-I1Open ↗
08/29/2026M00884922-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/28/2017123119339Open ↗
08/23/2017123119696Open ↗
12/17/2013121869326Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/07/2013121362140Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/01/2018123119339Open ↗
08/28/2017123119339Open ↗
10/10/2013121362140Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/01/2018123119339Open ↗
10/10/2013121362140Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/06/2012121362140Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/29/2013140066096Open ↗
▸Approvals, Objections & Sign-offs53
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter39
09/01/2026M08008557-I1Open ↗
09/01/2026M08008557-P1Open ↗
09/01/2026M08007057-P1Open ↗
Showing 3 of 39 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
11/27/2018123068410Open ↗
11/01/2018123119339Open ↗
08/20/2018123119696Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/09/2018123068410Open ↗
06/21/2014120925785Open ↗
12/03/2012120925785Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/06/2012121362140Open ↗
12/19/2011120925785Open ↗
▸BISSHED LETTER1
12/16/2013120925785Open ↗
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
11/01/2018123119339Open ↗
11/01/2018123119339Open ↗
08/28/2017123119339Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET6
08/28/2017123119339Open ↗
08/23/2017123119696Open ↗
04/13/2017123068410Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
09/22/2017123119696Open ↗
06/07/2017123068410Open ↗
05/03/2013140066096Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
11/27/2018123068410Open ↗
11/01/2018123119339Open ↗
08/20/2018123119696Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2013140066096Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M08004050-P2Open ↗
▸Other Documents10
▸DOB NOWCalculations4
08/18/2026M01363017-I1Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
08/18/2026M01363017-I1Open ↗
08/15/2026M01363017-P1Open ↗
Showing 2 of 4 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION1
03/29/2013140066096Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type