← Back
BROOKLYN
1 GAR OPAL COURT
BROOKLYN · BIN 3430005
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABC ENGINEERING PLLC303/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC ENGINEERING PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDER BROTHER GROUP INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABC ENGINEERING PLLC1515303/25/2026
Building Lifecycle
All (28)Filed (3)Permit Issued (1)Signed Off (1)Inspection (3)Objection (6)Special Inspection (14)
05/26/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MAJOR ALTERATION TO HORIZONTALLY ENLARGE EXISTING TWO(2) CAR GARAGE FOR PROPOSED 2 FAMILY BUILDING.OBTAIN NEW C OF O.
B01152818-I1
04/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
HUI ZENG
04/08/2026
Special inspection requirement — Subgrade Inspections
HUI ZENG
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
HUI ZENG
04/08/2026
Special inspection requirement — Masonry
HUI ZENG
04/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
HUI ZENG
04/08/2026
Special inspection requirement — Lowest Floor Elevation
HUI ZENG
04/08/2026
Special inspection requirement — Electric vehicle service equipment requirements
HUI ZENG
03/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
MAJOR ALTERATION TO HORIZONTALLY ENLARGE EXISTING TWO(2) CAR GARAGE FOR PROPOSED 2 FAMILY BUILDING.OBTAIN NEW C OF O.
B01152818-P3
03/25/2026
Special inspection requirement — Concrete - Cast-In-Place
HUI ZENG
03/25/2026
Special inspection requirement — Masonry
HUI ZENG
03/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
HUI ZENG
03/25/2026
Special inspection requirement — Subgrade Inspections
HUI ZENG
03/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
HUI ZENG
03/25/2026
Special inspection requirement — Lowest Floor Elevation
HUI ZENG
03/25/2026
Special inspection requirement — Electric vehicle service equipment requirements
HUI ZENG
10/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/15/2025
Objection resolved — Addressed
09/10/2025
Objection raised — Scope
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection raised — Scope
09/10/2025
Objection raised — Scope
09/10/2025
Objection resolved — Addressed
09/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
MAJOR ALTERATION TO HORIZONTALLY ENLARGE EXISTING TWO(2) CAR GARAGE FOR PROPOSED 2 FAMILY BUILDING.OBTAIN NEW C OF O.
B01152818-P2
06/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/15/2025
Permit issued — General Construction
B01152818-I1-GC
12/09/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
MAJOR ALTERATION TO HORIZONTALLY ENLARGE EXISTING TWO(2) CAR GARAGE FOR PROPOSED 2 FAMILY BUILDING.OBTAIN NEW C OF O.
B01152818-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBUILDER BROTHER GROUP INC04/15/2025
1 project · most recent 11/03/2025
General Wiring
FiledStatusContractorScope
11/03/2025CompleteHI-RITE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/08/2026Structural Stability – Alterations of existing buildingsHUI ZENGspecial
04/08/2026Subgrade InspectionsHUI ZENGspecial
04/08/2026Concrete - Cast-In-PlaceHUI ZENGspecial
04/08/2026MasonryHUI ZENGspecial
04/08/2026Fire-Resistance Rated ConstructionHUI ZENGprogress
04/08/2026Lowest Floor ElevationHUI ZENGprogress
04/08/2026Electric vehicle service equipment requirementsHUI ZENGenergy_progress
03/25/2026Concrete - Cast-In-PlaceHUI ZENGspecial
03/25/2026MasonryHUI ZENGspecial
03/25/2026Structural Stability – Alterations of existing buildingsHUI ZENGspecial
03/25/2026Subgrade InspectionsHUI ZENGspecial
03/25/2026Fire-Resistance Rated ConstructionHUI ZENGprogress
03/25/2026Lowest Floor ElevationHUI ZENGprogress
03/25/2026Electric vehicle service equipment requirementsHUI ZENGenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026B01152818-I1Request digital key ↗
08/17/2026B01152818-P2Request digital key ↗
08/17/2026B01152818-P3Request digital key ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01152818-P2Open ↗
08/13/2026B01152818-I1Open ↗
08/13/2026B01152818-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01152818-I1Open ↗
08/13/2026B01152818-P2Open ↗
08/13/2026B01152818-P3Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01152818-I1Open ↗
09/01/2026B01152818-I1Open ↗
08/23/2026B01152818-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01152818-P2Open ↗
08/17/2026B01152818-P3Open ↗
08/17/2026B01152818-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01152818-I1Open ↗
08/23/2026B01152818-P3Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B01152818-I1Open ↗
08/13/2026B01152818-P2Open ↗
08/13/2026B01152818-P3Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01152818-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01152818-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01152818-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026B01152818-P2Open ↗
08/17/2026B01152818-I1Open ↗
08/17/2026B01152818-P3Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification3
08/17/2026B01152818-P2Open ↗
08/17/2026B01152818-I1Open ↗
08/17/2026B01152818-P3Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026B01152818-I1Open ↗
08/13/2026B01152818-P2Open ↗
08/13/2026B01152818-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B01152818-I1Open ↗
08/13/2026B01152818-P2Open ↗
08/13/2026B01152818-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01152818-I1Open ↗