← Back
BROOKLYN
1 GATEWAY DRIVE
BROOKLYN · BIN 3430323
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof15p · 1 filing · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 412p · 1 filing · 20 docs
Floor 311p · 1 filing · 20 docs
Floor 211p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMTA308/05/2026
DE NARDIS ENGINEERING, LLC208/05/2026
MHG ARCHITECTS PC107/29/2026
Building Lifecycle
All (42)Filed (6)Objection (6)Special Inspection (30)
09/04/2026
Objection raised — Other
08/26/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/05/2026
Filed — New Building
INSTALL COMBINED CLASS I FIRE SPRINKLER/STANDPIPE WET PIPE SYSTEM IN RELATED NEW BUILDING FILING.
B01397467-S3
08/05/2026
Filed — New Building
INSTALL COMBINED CLASS I FIRE SPRINKLER/STANDPIPE WET PIPE SYSTEM IN RELATED NEW BUILDING FILING.
B01397467-S4
08/05/2026
Filed — New Building
INSTALL COMBINED CLASS I FIRE SPRINKLER/STANDPIPE WET PIPE SYSTEM IN RELATED NEW BUILDING FILING.
B01397467-S1
08/05/2026
Filed — New Building
INSTALL COMBINED CLASS I FIRE SPRINKLER/STANDPIPE WET PIPE SYSTEM IN RELATED NEW BUILDING FILING.
B01397467-S2
08/05/2026
Filed — New Building
INSTALL COMBINED CLASS I FIRE SPRINKLER/STANDPIPE WET PIPE SYSTEM IN RELATED NEW BUILDING FILING.
B01397467-S5
07/29/2026
Filed — New Building
INSTALL COMBINED CLASS I FIRE SPRINKLER/STANDPIPE WET PIPE SYSTEM IN RELATED NEW BUILDING FILING.
B01397467-I1
07/23/2026
Special inspection requirement — Concrete - Cast-In-Place
07/23/2026
Special inspection requirement — Insulation placement and R values
07/22/2026
Special inspection requirement — Subgrade Inspections
07/22/2026
Special inspection requirement — Post-installed Anchors
07/22/2026
Special inspection requirement — Air barrier - visual inspection
07/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/22/2026
Special inspection requirement — Structural Steel - Welding
07/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/22/2026
Special inspection requirement — Structural Steel - Details
07/22/2026
Special inspection requirement — Post-installed Anchors
07/22/2026
Special inspection requirement — Masonry
07/22/2026
Special inspection requirement — Concrete – Prestressed
07/22/2026
Special inspection requirement — Concrete - Precast
07/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/22/2026
Special inspection requirement — Concrete - Cast-In-Place
07/22/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — Post-installed Anchors
07/16/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
07/16/2026
Special inspection requirement — Mechanical Systems
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/16/2026
Special inspection requirement — Maintenance information
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — Final
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
07/16/2026
Special inspection requirement — Maintenance information
07/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
Nothing on file for this building.
1 project · most recent 08/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026——Heating and Air Conditioning Systems
Heat / Cool
Lg ZRUM072BTE6 81,000 BTU · Vrf Outdoor ×2
1 project · most recent 08/05/2026
Sprinkler System
FiledStatusContractorScope
08/05/2026——Sprinkler System
1 project · most recent 08/05/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026——Storm, Water/Sanitary
1 project · most recent 08/05/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/05/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
07/23/2026Concrete - Cast-In-Place—special
07/23/2026Insulation placement and R values—energy_progress
07/22/2026Subgrade Inspections—special
07/22/2026Post-installed Anchors—special
07/22/2026Air barrier - visual inspection—energy_progress
07/22/2026Excavations - Sheeting, Shoring, and Bracing—special
07/22/2026Structural Steel - Welding—special
07/22/2026Structural Steel - High Strength Bolting—special
07/22/2026Structural Steel - Details—special
07/22/2026Post-installed Anchors—special
07/22/2026Masonry—special
07/22/2026Concrete – Prestressed—special
07/22/2026Concrete - Precast—special
07/22/2026Subsurface Investigations (Borings/Test Pits)—special
07/22/2026Concrete - Cast-In-Place—special
07/22/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Post-installed Anchors—special
07/16/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/16/2026Energy Code Compliance Inspections—progress
07/16/2026Mechanical Systems—special
07/16/2026HVAC-R and service water piping design and insulation—energy_progress
07/16/2026HVAC-R and service water heating equipment—energy_progress
07/16/2026HVAC-R and service water heating system controls—energy_progress
07/16/2026Maintenance information—energy_progress
Latest 25 of 56.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/16/2026B01397467-S5Request digital key ↗
08/16/2026B01397467-S4Request digital key ↗
08/16/2026B01397467-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01397467-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01397467-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026B01397467-S3Open ↗
08/16/2026B01397467-S5Open ↗
08/16/2026B01397467-S4Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026B01397467-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/16/2026B01397467-S5Open ↗
08/16/2026B01397467-S4Open ↗
08/16/2026B01397467-S3Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/16/2026B01397467-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026B01397467-I1Open ↗