← Back
Elevator cooperative
1 Gracie Square
93 EAST END AVENUE · BIN 1051388
💬 Discuss this project
1929Year Built
14Stories
D4Building Class
R10AZoning
53,736 sfGross Floor Area
18Units
LL97 CoveredRent Stabilized10 Open Violations 8 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: ONE GRACIE SQUARE CORP · 4,569 sf lot · 11.76 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 7Under Construction1 filing · 7 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAN BLDG REST, INC.203/22/2026
PHOENIX CONSTRUCTION203/22/2026
1 GRACIE SQUARE COURT103/22/2026
ONE GLACIE SQUARE CORP103/22/2026
OWNER OF 1 GRACIE SQUARE303/22/2026
PHOENIX 132 SUTTON STREET503/21/2026
ROCKLEDGE SCAFFOLD CORP.103/21/2026
JEPOL CONSTRUCTION203/21/2026
1 GRACIE SQUARE2803/21/2026
1 GRACIE SQUARE C O RUDD MGMT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TROPOS ARCHITECTURE PLLC202/20/2026
BAZINI ENGINEERING, P.C.109/24/2025
EPONYMOUS ARCHITECTURE304/04/2025
REVANS DESIGN PE PC101/19/2023
ASHRAF CORP510/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EC BUILDING CONSULTANTS403/21/2026
J CALLAHAN CONSULTING603/21/2026
HH BUILDING CONSULTING & ARCHITECTU1003/21/2026
SUSKA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor1607/08/2026
DEMAR PLUMBING CORPGeneral Contractor203/21/2026
DENNIS KENNELLYElectrical103/21/2026
KERSTING, MICHAELElectrical103/21/2026
WITTMAN, ROBERTElectrical103/21/2026
YITZHAK ADIKAElectrical103/21/2026
LEMPIRA RESTORATION INCGeneral Contractor107/08/2026
TD RENOVATIONS INCGeneral Contractor104/09/2026
LILO'S PLBG & HTG CORPPlumbing107/08/2026
AXCEL ELECTRIC CO., INC.Electrical103/22/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
CHANG, VICTORElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746202/20/2026
BAZINI ENGINEERING, P.C.1808109/24/2025
REVANS DESIGN PE PC4617101/19/2023
Building Lifecycle
All (121)Filed (12)Permit Issued (14)Signed Off (6)Facade (FISP) (12)Violation (54)Inspection (7)Objection (4)Special Inspection (12)
08/26/2026
Signed off — Alteration
REMOVE EXISTING 7,500-GALLON FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01291592-I1
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/06/2026
Permit issued — Plumbing
M01357731-I1-PL
03/02/2026
Permit issued — General Construction
M01357730-I1-GC
02/20/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF APARTMENT #7W. REMOVE PARTITIONS, DOORS, SELECT MILLWORK, AND APPLIANCES. INSTALL NEW PARTITIONS, DOORS, REFINISH EXISTING WOOD FLOOR, NEW WALL TILE AND FLOOR IN THE BATHROOMS. PLUMBING WORK FILED UNDER SEPARATE APPLICATION
M01357730-I1
02/20/2026
Filed — Alteration
Proposed modifications to plumbing fixtures and related piping. No change to occupancy use or egress.
M01357731-I1
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Daniel Hemmendinger
02/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Hemmendinger
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
02/18/2026
Special inspection requirement — Lighting in dwelling units
Daniel Hemmendinger
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Daniel Hemmendinger
02/10/2026
Special inspection requirement — Final
Daniel Hemmendinger
10/29/2025
Permit issued — Boiler Equipment
M01291592-I1-BE
09/24/2025
Filed — Alteration
REMOVE EXISTING 7,500-GALLON FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01291592-I1
09/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/15/2025
Signed off — Alteration
Plumbing work to include new installation and relocation of plumbing fixtures and associated piping as per plans filed herewith. No change to occupancy, use or egress.
M01058470-I1
07/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2025
Filed — Alteration
Plumbing work to include new installation and relocation of plumbing fixtures and associated piping as per plans filed herewith. No change to occupancy, use or egress.
M01058470-P1
01/03/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2024
Signed off — Alteration
Interior demolition of doors and non-load bearing walls and general construction as per plans filed herewith. No change to occupancy, use or egress.
M01058450-I1
11/26/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2024
Permit issued — General Construction
M01058450-I1-GC
07/10/2024
Permit issued — Plumbing
M01058470-I1-PL
07/03/2024
Objection resolved — Addressed
07/03/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Other
07/02/2024
Objection raised — Other
06/25/2024
Filed — Alteration
Interior demolition of doors and non-load bearing walls and general construction as per plans filed herewith. No change to occupancy, use or egress.
M01058450-I1
06/24/2024
Filed — Alteration
Plumbing work to include new installation and relocation of plumbing fixtures and associated piping as per plans filed herewith. No change to occupancy, use or egress.
M01058470-I1
06/24/2024
Special inspection requirement — Lighting in dwelling units
JOSHUA KEAY
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSHUA KEAY
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
05/29/2024
Special inspection requirement — Final
JOSHUA KEAY
11/17/2023
Signed off — Alteration
INSTALL NEW HVAC EQUIPMENT AS PER PLANS. NO CHANGE INMEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M08050841-I1
02/20/2023
Cycle 9 facade report submitted
02/19/2023
Cycle 9 facade report signed — SWARMP
02/16/2023
Cycle 9 facade inspection completed
01/30/2023
Permit issued — Mechanical Systems
M08050841-I1-MS
01/19/2023
Filed — Alteration
INSTALL NEW HVAC EQUIPMENT AS PER PLANS. NO CHANGE INMEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M08050841-I1
11/05/2022
Signed off — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00366697-I1
09/27/2022
Permit issued — Sidewalk Shed
M00366697-I1-SH
07/08/2022
Permit issued — Sidewalk Shed
M00366697-I1-SH
12/30/2021
Signed off — Alteration
M00370490-I1
08/06/2021
Permit issued — Supported Scaffold
M00370490-I1-SF
08/03/2021
Permit issued — Sidewalk Shed
M00366697-I1-SH
10/06/2020
Filed — Alteration
M00370490-P2
10/06/2020
Special inspection requirement — Final
Eric Foster
09/21/2020
Permit issued — Sidewalk Shed
M00366697-I1-SH
09/16/2020
Permit issued — Supported Scaffold
M00370490-I1-SF
08/31/2020
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00366697-P1
08/31/2020
Filed — Alteration
M00370490-P1
07/15/2020
Permit issued — Supported Scaffold
M00370490-I1-SF
07/14/2020
Filed — Alteration
M00370490-I1
07/07/2020
Permit issued — Sidewalk Shed
M00366697-I1-SH
07/06/2020
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00366697-I1
02/21/2018
Cycle 8 facade report submitted
02/14/2018
Cycle 8 facade inspection completed
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC03/06/2026
DOB NOWGeneral ConstructionPermit IssuedTD RENOVATIONS INC03/02/2026
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ10/29/2025
DOB NOWGeneral ConstructionSigned-offLEMPIRA RESTORATION07/16/2024
DOB NOWPlumbingSigned-offLILO'S PLBG & HTG CORP07/10/2024
DOB NOWMechanical SystemsSigned-offDEMAR PLUMBING CORP01/30/2023
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/27/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/08/2022
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION08/06/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION08/03/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/21/2020
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/16/2020
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION07/15/2020
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/07/2020
BISOTISSUEDJEPOL CONSTRUCTION INC06/14/2022
BISOTISSUEDJEPOL CONSTRUCTION INC01/04/2022
BISOTISSUEDJEPOL CONSTRUCTION INC03/03/2021
BISOTISSUEDJEPOL CONSTRUCTION INC02/01/2021
BISEQISSUEDJEPOL CONSTRUCTION INC10/19/2020
BISOTISSUEDJEPOL CONSTRUCTION INC08/17/2020
BISMHISSUEDARISTA AIR CONDITIONING CORP05/17/2019
BISEQISSUEDSPRING SCAFFOLDING LLC12/23/2013
BISFSISSUEDAPPROVED OIL CO OF BKLYN10/11/2013
BISPLISSUEDBELL FUEL OIL, LLC10/11/2013
BISEQISSUEDSPRING SCAFFOLDING LLC06/26/2013
BISEQISSUEDSPRING SCAFFOLDING LLC06/26/2013
BISPLISSUEDA. HTG AND PLBG WORKS INC03/04/2013
BISOTISSUEDA W R GROUP INC04/16/2012
BISEQISSUEDPHOENIX BRIDGING INC01/03/2012
BISMHISSUEDROYAL AIR CONDITIONING IN12/23/2011
BISPLISSUEDA. HTG AND PLBG WORKS INC11/28/2011
BISOTISSUEDANTON BERISHAJ11/15/2011
BISPLISSUEDORBIT PLBG & HTG INC07/06/2011
BISOTISSUEDMAC INTERIOR CONSTRUCTION07/05/2011
BISOTISSUEDA W R GROUP INC06/27/2011
BISOTISSUEDR. KLICH WINDOW & DOOR SY04/08/2011
BISOTISSUEDA W R GROUP INC04/05/2011
BISEQISSUEDPHEONIX 132 SUTTON STREET09/29/2010
BISPLISSUEDCITI ISLAND MECHANICAL IN09/13/2010
BISMHISSUEDCOTTAM HEATING & AIR CONDIT.08/05/2010
+ 24 more permits on file
1 project · most recent 02/20/2026
Water/Sanitary
FiledStatusContractorScope
02/20/2026Signed-offDW PLUMBING INCWater/Sanitary
7 projects · most recent 02/24/2026
General Wiring
FiledStatusContractorScope
02/24/2026Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
08/22/2024CompleteBRONXDALE ELECTRIC INCGeneral Wiring
11/17/2023CompleteAXCEL ELECTRIC CO., INC.—
07/07/2023CompleteAXCEL ELECTRIC CO., INC.General Wiring
02/08/2023Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
11/11/2022CompletePOWER MASTERS ELEC'L CONTGeneral Wiring
07/08/2020CompleteSTEVEN FARKAS—
1 project · most recent 02/20/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/20/2026Permit IssuedTD RENOVATIONS INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2026Pass-Final Boiler Equipment InspectionPassView ↗
07/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/26/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
02/18/2026Energy Code Compliance InspectionsDaniel Hemmendingerprogress
02/18/2026HVAC-R and service water piping design and insulationDaniel Hemmendingerenergy_progress
02/18/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
02/18/2026Lighting in dwelling unitsDaniel Hemmendingerenergy_progress
02/10/2026Energy Code Compliance InspectionsDaniel Hemmendingerprogress
02/10/2026FinalDaniel Hemmendingerprogress
09/23/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
06/24/2024Lighting in dwelling unitsJOSHUA KEAYenergy_progress
06/24/2024Energy Code Compliance InspectionsJOSHUA KEAYprogress
06/24/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
05/29/2024FinalJOSHUA KEAYprogress
10/06/2020FinalEric Fosterprogress
▾Documents — 372 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
09/01/2026M08050841-I1Request digital key ↗
08/24/2026M01058470-P1Request digital key ↗
08/24/2026M01058470-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/04/2026M00370490-I1Request digital key ↗
08/15/2026M00370490-P2Request digital key ↗
08/15/2026M00370490-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00366697-I1Request digital key ↗
08/15/2026M00366697-P1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION37
10/12/2020140964687Open ↗
07/09/2020140913171Open ↗
07/08/2020140913171Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION35
03/03/2021140913171Open ↗
10/19/2020140964687Open ↗
08/12/2020123747703Open ↗
Showing 3 of 35 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/18/2014140091497Open ↗
▸Seals & Professional Certifications86
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
10/03/2019123747703Open ↗
06/04/2019123869420Open ↗
05/17/2019123869420Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/04/2026M00370490-P2Open ↗
09/04/2026M00370490-I1Open ↗
09/04/2026M00370490-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
05/17/2019123869420Open ↗
10/15/2013121799884Open ↗
05/04/2011120678472Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M01357731-I1Open ↗
09/01/2026M01357731-I1Open ↗
08/28/2026M00370490-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
05/04/2011120678472Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/12/2020140964687Open ↗
05/17/2019123869420Open ↗
10/15/2013121799884Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/12/2020140964687Open ↗
06/26/2013140091497Open ↗
06/26/2013140091503Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/12/2020140964687Open ↗
06/26/2013140091497Open ↗
06/26/2013140091503Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01291592-I1Open ↗
08/23/2026M01058450-I1Open ↗
08/22/2026M01357730-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/30/2020140913171Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment37
▸BISSELF-CERT PLUMBING NOTICE15
04/09/2014121799884Open ↗
03/21/2013120772958Open ↗
12/07/2012120772958Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING14
10/15/2013121799884Open ↗
02/01/2012120772958Open ↗
01/30/2012120601919Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
05/31/2019123869420Open ↗
07/02/2012120601919Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
05/31/2019123869420Open ↗
07/02/2012120601919Open ↗
Showing 2 of 3 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
04/09/2014121799884Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/15/2013121799884Open ↗
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan5
08/13/2026M00370490-P2Open ↗
08/13/2026M00366697-P1Open ↗
08/13/2026M00366697-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES4
10/12/2020140964687Open ↗
06/30/2020140913171Open ↗
10/03/2019123747703Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/03/2019123747703Open ↗
▸Environmental & Asbestos31
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
05/04/2011120678472Open ↗
03/24/2011120560794Open ↗
08/12/2011120772958Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
06/30/2020140913171Open ↗
10/03/2019123747703Open ↗
05/17/2019123869420Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026M01058470-P1Open ↗
08/24/2026M01058470-I1Open ↗
08/19/2026M01357731-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
10/03/2019123747703Open ↗
06/04/2019123869420Open ↗
05/17/2019123869420Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/31/2023123747703Open ↗
06/04/2019123869420Open ↗
04/11/2013120772958Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/09/2023140913171Open ↗
01/31/2023123747703Open ↗
06/30/2020140913171Open ↗
▸BISTR8: Energy Code Progress Inspections2
09/08/2011120772958Open ↗
03/16/2011120628847Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/09/2023140913171Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/26/2013140091497Open ↗
▸BISTECHNICAL REPORT: ENERGY1
08/12/2011120772958Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/09/2023140913171Open ↗
01/31/2023123747703Open ↗
03/22/2022140913171Open ↗
Showing 3 of 6 on file for this type
▸BISMASONRY1
02/09/2023140913171Open ↗
▸Approvals, Objections & Sign-offs41
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
05/04/2023140913171Open ↗
02/01/2023123747703Open ↗
06/04/2019123869420Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
08/12/2011120772958Open ↗
05/04/2011120678472Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026M00905821-I1Open ↗
08/13/2026M00915997-I1Open ↗
08/13/2026M00942122-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/04/2019123869420Open ↗
09/19/2014121799884Open ↗
04/09/2014121799884Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
06/30/2020140913171Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT19
01/31/2023123747703Open ↗
06/30/2020140913171Open ↗
10/03/2019123747703Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/09/2023140913171Open ↗
02/09/2023140913171Open ↗
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET14
10/03/2019123747703Open ↗
05/17/2019123869420Open ↗
10/26/2013121799287Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION9
07/27/2020140913171Open ↗
10/03/2019123747703Open ↗
04/22/2014140091497Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
10/12/2020140964687Open ↗
06/30/2020140913171Open ↗
06/26/2013140091497Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM1
06/04/2019123869420Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
08/12/2020123747703Open ↗
08/12/2020123747703Open ↗
08/12/2020123747703Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
06/26/2013140091497Open ↗
06/26/2013140091503Open ↗
▸BISSupporting Document: Fee Exempt1
04/09/2014121799884Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/12/2020140964687Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
07/11/2011120601919Open ↗