← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
One Leroy Condominium
1 LEROY STREET · BIN 1009925
💬 Discuss this project
1956Year Built
6Stories
RMBuilding Class
R7-2Zoning
21,878 sfGross Floor Area
9Units
LL97 CoveredRent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,905 sf lot · 4.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Penthouse2p · 1 filing · 20 docs
Floor 65p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 13p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLEECKER ST DEVELOPMENT803/22/2026
TO THE OWNER OF 1ST FLOOR103/22/2026
ONE LEROY ST CONDO ASSOCI103/22/2026
OWNER OF 252 BLEECKER103/22/2026
1 LEROY CONDO ASSOC803/21/2026
SK + RK REALTY903/21/2026
ONE LEROY CONDO ASSOCIATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE1003/21/2026
PDG BUILDING CONSULTANTS LLC LLC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORION CONSTRUCTION & PAINTINGGeneral Contractor407/08/2026
CREW CONTRACTING CORPGeneral Contractor303/21/2026
GANIC PLUMBING & HTG INCPlumbing207/08/2026
RUIZ RAVE, YEISONElectrical103/21/2026
ZARETSKY, MIKHAILElectrical103/21/2026
IVAN PAVICICElectrical103/21/2026
NATIONWIDE MECHANICAL INCPlumbing107/08/2026
MOLLER, GEORGEElectrical103/21/2026
NYC IRONWORKERS LOCAL 40Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GOTHAM INSPECTIONS1432405/16/2025
STRATFORD ENGINEERING997204/29/2024
Building Lifecycle
All (107)Filed (7)Permit Issued (7)Signed Off (6)Violation (43)Inspection (6)Objection (20)Special Inspection (18)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/10/2025
Signed off — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-S3
07/09/2025
Signed off — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-S2
06/23/2025
Signed off — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-I1
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Snyder
06/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Snyder
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Snyder
05/16/2025
Filed — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-P1
05/16/2025
Signed off — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-S1
04/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/10/2025
Permit issued — Plumbing
M00983195-S3-PL
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2024
Permit issued — Plumbing
M00983195-S3-PL
06/21/2024
Permit issued — General Construction
M00983195-I1-GC
06/21/2024
Permit issued — Mechanical Systems
M00983195-S2-MS
06/21/2024
Permit issued — Structural
M00983195-S1-ST
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/22/2024
Objection resolved — Addressed
05/21/2024
Objection resolved — Addressed
05/21/2024
Objection resolved — Addressed
05/21/2024
Special inspection requirement — Duct leakage testing, insulation and design
Steven Snyder
04/29/2024
Filed — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-S1
04/24/2024
Objection raised — Accessibility
04/24/2024
Objection raised — Other
04/23/2024
Objection raised — Other
04/23/2024
Objection raised — Other
04/23/2024
Objection raised — Other
04/23/2024
Objection raised — Inspections
04/23/2024
Objection raised — Other
04/23/2024
Objection raised — Other
04/23/2024
Objection raised — Other
04/20/2024
Filed — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-S3
04/20/2024
Filed — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-S2
04/19/2024
Filed — Alteration
RENOVATION OF KITCHEN AND BATHROOMS AND INSTALL ONE GAS GRILL ON EXISTING 6TH FLOOR TERRACE IN CONJUNCTION WITH INTERIOR RENOVATION OF TRIPLEX APARTMENT #5A. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00983195-I1
04/10/2024
Special inspection requirement — Shutoff dampers
Steven Snyder
03/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Snyder
03/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Snyder
12/28/2023
Special inspection requirement — Lighting in dwelling units
Juliet Hernandez Eli
12/28/2023
Special inspection requirement — Final
Juliet Hernandez Eli
12/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Juliet Hernandez Eli
12/28/2023
Special inspection requirement — Mechanical Systems
Steven Snyder
12/28/2023
Special inspection requirement — Final
Steven Snyder
12/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Snyder
12/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
11/21/2023
Signed off — Alteration
Plumbing work as plans filed.
M00762222-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/06/2023
Signed off — Alteration
Plumbing work as plans filed.
M00762222-S1
03/01/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGANIC PLUMBING & HTG INC03/10/2025
DOB NOWPlumbingSigned-offGANIC PLUMBING & HTG INC06/26/2024
DOB NOWGeneral ConstructionSigned-offORION CONSTRUCTION & PAIN06/21/2024
DOB NOWMechanical SystemsSigned-offORION CONSTRUCTION & PAIN06/21/2024
DOB NOWStructuralSigned-offORION CONSTRUCTION & PAIN06/21/2024
DOB NOWPlumbingSigned-offNATIONWIDE MECHANICAL INC09/06/2022
DOB NOWGeneral ConstructionSigned-offCREW CONTRACTING CORP07/18/2022
BISSPISSUEDMETRO MECHANICAL GROUP IN11/06/2019
BISSPISSUEDMETRO MECHANICAL GROUP IN11/05/2018
BISOTISSUEDNURMINEN CONSTRUCTION OF09/25/2018
BISOTISSUEDNURMINEN CONSTRUCTION OF06/20/2018
BISPLISSUEDSAFETY PLMBG & HTG LLC06/07/2017
BISPLISSUEDHYDROKINETIC PLBG & HTG I03/20/2017
BISOTISSUEDCAMPBELL DESIGN &02/13/2017
BISMHISSUEDCAMPBELL DESIGN &02/13/2017
BISOTISSUEDCAMPBELL DESIGN &02/13/2017
BISOTISSUEDJEPOL CONSTRUCTION INC02/01/2017
BISMHISSUEDJEPOL CONSTRUCTION INC10/26/2016
BISOTISSUEDJEPOL CONSTRUCTION INC10/19/2016
BISPLISSUEDTT MECHANICAL CORP12/09/2014
BISPLISSUEDTT MECHANICAL CORP09/23/2014
BISOTISSUEDOCS BUILDERS GROUP LLC03/28/2014
BISPLISSUEDTT MECHANICAL CORP12/03/2013
BISFPISSUEDLUND FIRE PRODUCTS CO INC10/18/2013
BISPLISSUEDTT MECHANICAL CORP07/24/2013
BISOTISSUEDOCS BUILDERS GROUP LLC06/05/2013
BISPLISSUEDPP COUSIN INC07/02/2012
BISMHISSUEDPAMI CONSTRUCTION CORP03/12/2007
BISPLISSUEDPP COUSIN INC03/08/2007
BISEQISSUEDWEST NEW YORK RESTORATION OF CT12/27/2006
BISOTISSUEDWEST NEW YORK RESTORATION OF CT09/29/2006
BISEQISSUEDWEST NEW YORK RESTORATION OF CT01/20/2006
BISEQISSUEDWEST NEW YORK RESTORATION OF CT01/20/2006
BISPLISSUEDPETER PLUMBING ASSOC. INC.08/02/2004
BISPLISSUEDPETER PLUMBING ASSOC. INC.08/02/2004
BISFPISSUEDLUND FIRE PRODUCTS CO INC07/30/2004
BISOTISSUEDDAY SUNG CONSTR.07/06/2004
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO.03/16/2001
BISMHISSUEDG AND R CONSU. INC.02/07/2001
BISPLISSUEDBEST PLBG PARTNERS02/07/2001
+ 14 more permits on file
1 project · most recent 09/08/2022
General Wiring
FiledStatusContractorScope
09/08/2022CompleteEURO ELEC'L CONTRG, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/05/2025Energy Code Compliance InspectionsSteven Snyderprogress
06/05/2025HVAC-R and service water piping design and insulationSteven Snyderenergy_progress
06/05/2025Fire-Resistant Penetrations and JointsSteven Snyderspecial
05/21/2024Duct leakage testing, insulation and designSteven Snyderenergy_progress
04/10/2024Shutoff dampersSteven Snyderenergy_progress
03/22/2024Energy Code Compliance InspectionsSteven Snyderprogress
03/22/2024Fire-Resistant Penetrations and JointsSteven Snyderspecial
12/28/2023Lighting in dwelling unitsJuliet Hernandez Elienergy_progress
12/28/2023FinalJuliet Hernandez Eliprogress
12/28/2023Energy Code Compliance InspectionsJuliet Hernandez Eliprogress
12/28/2023Mechanical SystemsSteven Snyderspecial
12/28/2023FinalSteven Snyderprogress
12/28/2023Fire-Resistant Penetrations and JointsSteven Snyderspecial
12/28/2023Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
06/22/2022Interior lighting powerJOSEPH MARTINESenergy_progress
06/22/2022Lighting controlsJOSEPH MARTINESenergy_progress
06/22/2022Energy Code Compliance InspectionsJOSEPH MARTINESprogress
06/22/2022FinalJOSEPH MARTINESprogress
▾Documents — 220 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/02/2026M00762222-S1Request digital key ↗
09/02/2026M00762222-I1Request digital key ↗
08/23/2026M00983195-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION21
01/11/2019123453770Open ↗
09/25/2018123453770Open ↗
09/20/2018123542764Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION19
11/07/2019123453770Open ↗
11/05/2018123453770Open ↗
11/05/2018123453770Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWLPC Approval/Permit7
08/13/2026M00983195-P1Open ↗
08/13/2026M00983195-I1Open ↗
08/13/2026M00762222-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
11/08/2019123542764Open ↗
11/08/2019123542764Open ↗
11/08/2019123235855Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/26/2026M00983195-I1Open ↗
08/26/2026M00983195-I1Open ↗
08/26/2026M00983195-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026M00983195-S2Open ↗
08/23/2026M00983195-P1Open ↗
08/23/2026M00983195-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026M00983195-I1Open ↗
08/26/2026M00983195-I1Open ↗
08/25/2026M00983195-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/05/2018123235855Open ↗
01/06/2012120888272Open ↗
11/17/2011120888272Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/06/2012120888272Open ↗
11/17/2011120888272Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/05/2018123235855Open ↗
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING10
11/05/2014120888272Open ↗
11/05/2014120888272Open ↗
12/03/2013120888272Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
10/29/2014120888272Open ↗
03/17/2014120888272Open ↗
02/10/2014120888272Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/11/2019123453770Open ↗
09/25/2018123453770Open ↗
09/23/2016122871222Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
12/04/2014120888272Open ↗
04/14/2014120888272Open ↗
03/17/2014120888272Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
09/25/2018123453770Open ↗
06/05/2018123235855Open ↗
10/17/2016122871222Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
01/06/2012120888272Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026M00983195-S2Open ↗
08/23/2026M00983195-P1Open ↗
08/23/2026M00983195-S3Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
11/05/2018123453770Open ↗
09/20/2018123542764Open ↗
06/05/2018123235855Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT3
11/17/2011120888272Open ↗
11/17/2011120888272Open ↗
01/06/2012120888272Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
11/08/2019123542764Open ↗
11/08/2019123235855Open ↗
05/29/2019123453770Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/08/2019123542764Open ↗
11/08/2019123235855Open ↗
05/29/2019123453770Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs13
▸BISLANDMARKS APPROVAL7
11/08/2019123542764Open ↗
11/08/2019123235855Open ↗
05/29/2019123453770Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/08/2019123542764Open ↗
11/08/2019123235855Open ↗
05/29/2019123453770Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/29/2011120888272Open ↗
12/09/2011120888272Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
11/08/2019123542764Open ↗
11/08/2019123235855Open ↗
05/29/2019123453770Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION15
01/25/2019123453770Open ↗
01/11/2019123453770Open ↗
09/20/2018123542764Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET8
09/25/2018123453770Open ↗
09/20/2018123542764Open ↗
06/05/2018123235855Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
11/08/2019123542764Open ↗
11/08/2019123235855Open ↗
05/29/2019123453770Open ↗
Showing 3 of 5 on file for this type