← Back
Elevator cooperative
1 LEXINGTON AVENUE
MANHATTAN · BIN 1017991
💬 Discuss this project
1910Year Built
12Stories
D4Building Class
R9AZoning
75,379 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized33 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 1 LEX AVE CP · 7,405 sf lot · 10.18 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 8 filings · 20 docs
Floor 10Under Construction15p · 2 filings · 19 docs
Floor 9Under Construction17p · 2 filings · 19 docs
Floor 813p · 1 filing · 20 docs
Floor 710p · 1 filing · 20 docs
Floor 63p · 2 filings · 16 docs
Floor 51p · 1 filing · 2 docs
Floor 416p · 5 filings · 20 docs
Floor 310p · 3 filings · 20 docs
Floor 2Under Construction7p · 1 filing · 12 docs
Floor 1Under Construction6p · 1 filing · 12 docs
6 jobs · most recent 06/24/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
06/24/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Condensing Unit ×2
PEFY-M08NMSU-A 8,000 BTU · Vrf Indoor ×2
PEFY-M12NMSU-A 12,000 BTU · Vrf Indoor ×1
PEFY-M18NMSU-A 18,000 BTU · Vrf Indoor ×1
PEFY-M24NMAU-A 24,000 BTU · Vrf Indoor ×1
PEFY-M36NMAU-A 36,000 BTU · Vrf Indoor ×1
04/22/2026Permit IssuedCATALYST DEVELOPMENT GROUHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MFZ-KX09NL 9,000 BTU · Ahu ×2
MFZ-KX12NL 12,000 BTU · Ahu ×1
MXZ-SM48NL 50,000 BTU · Condensing Unit ×1
PEAD-AA12NL 12,000 BTU · Vrf Indoor ×1
PEAD-AA15NL 15,000 BTU · Ahu ×1
08/27/2025Permit IssuedGMG CARPENTRY INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Vrf Outdoor ×8
PEFY-L27NMAU-A 27,000 BTU · Vrf Indoor ×4
PVFY-L24NAMU-A 24,000 BTU · Vrf Indoor ×4
PVFY-L48NAMU-A 48,000 BTU · Vrf Indoor ×4
02/04/2025Permit IssuedUBERTO, LTDHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric Med Static PEFY-P12NMAU-E4 371 BTU · Vrf Indoor ×2
Med Status PEFY-P06NMAU-E4 300 CFM · Vrf Indoor ×2
Med Status PEFY-P12NMAU-E4 371 CFM · Vrf Indoor ×2
Med Status PEFY-P18NMAU-Ef 600 CFM · Vrf Indoor ×2
Med Status PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×2
floor mounted - exposed PFFY-P24NEMU-E 494 CFM · Vrf Indoor ×2
Ventilation
Mitsubishi Electric Mitsubishi MXZ0SM48NAM2-U1 3,885 CFM · Split System ×4
11/17/2021——Air Conditioning Systems
Cooling
— PVFY-P18NAMU-E1 18,000 BTU · Fan Coil Indoor ×2
PUMY-P60NKMU3 60,000 BTU · Rooftop Unit ×1
PVFY-P36NAMU-E1 36,000 BTU · Fan Coil Indoor ×1
05/28/2020Permit IssuedUBERTO, LTDAir Conditioning Systems, Associated Ducts and Piping
Cooling
Mitsubishi Electric PUMY-P36NKMU3 36,000 BTU · Vrf Outdoor ×1
PUMY-P48NKMU3 48,000 BTU · Vrf Outdoor ×1
6 jobs · most recent 06/24/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/24/2026——Gas, Water/Sanitary
04/22/2026Permit IssuedTRI STATE PLBG & HTG INCWater/Sanitary
09/05/2025Signed-offARCON PLBG SOLUTIONSWater/Sanitary
08/27/2025Permit IssuedR.J.C. MECHANICAL CORPGas, Water/Sanitary
02/04/2025Signed-offORBIT PLBG & HTG INCGas, Water/Sanitary
11/17/2021Permit IssuedBUDGET PLBG & HTG LLCGas, Water/Sanitary
17 jobs · most recent 04/08/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
04/08/2026CompleteBASS ELECTRICAL CORP.General Wiring
12/15/2025CompletePAC ELECTRIC CORP.HVAC Wiring
09/17/2025CompleteARREE ELECTRIC CORPGeneral Wiring
09/26/2024CompleteBASS ELECTRICAL CORP.General Wiring
05/07/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
01/27/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
01/08/2024CompleteTEAM ELECTRIC, INCGeneral Wiring
12/12/2023Permit IssuedASSET ELECTRIC CORPGeneral Wiring
04/24/2023CompleteETECH ELECTRICAL LLCGeneral Wiring
09/21/2022CompleteAPOLLO ELECTRIC INC.General Wiring
04/05/2022CompleteNASH ELECTRIC SERVICES IN—
02/03/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
10/15/2021CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
08/14/2020CompleteEINSTEIN ELEC'L CORPGeneral Wiring
06/19/2018CompleteWMS ELECTRICAL CONTNG LTD—
Building Lifecycle
All (264)Filed (46)Permit Issued (46)Signed Off (15)Facade (FISP) (18)Violation (60)Inspection (19)Objection (30)Special Inspection (30)
09/22/2026
Permit issued — Plumbing
M01383105-S2-PL
09/08/2026
Permit issued — Mechanical Systems
M00526528-I1-MS
06/24/2026
Filed — Alteration
Modifications to existing mechanical system
M01411238-S1
06/23/2026
Filed — Alteration
INTERIOR WORK IN EXISTING DUPLEX APARTMENT 5A/6A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01411053-I1
06/23/2026
Filed — Alteration
INSTALLATION OF 2HR RATED SOFFIT AT COMMON HALLWAY
M01411223-I1
06/23/2026
Filed — Alteration
Modifications to existing mechanical system
M01411238-I1
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Collins
06/17/2026
Permit issued — General Construction
M01383105-I1-GC
06/16/2026
Special inspection requirement — Post-installed Anchors
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Collins
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
06/15/2026
Special inspection requirement — Lighting controls
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Collins
06/15/2026
Special inspection requirement — Heating Systems
Paul Collins
06/15/2026
Special inspection requirement — Maintenance information
Paul Collins
06/15/2026
Special inspection requirement — Post-installed Anchors
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Collins
06/15/2026
Special inspection requirement — Post-installed Anchors
Paul Collins
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Collins
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
06/15/2026
Special inspection requirement — Interior lighting power
06/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/03/2026
Special inspection requirement — Final
Paul Collins
06/03/2026
Special inspection requirement — Final
06/03/2026
Special inspection requirement — Mechanical Systems
Paul Collins
06/02/2026
Permit issued — Mechanical Systems
M01263083-S2-MS
06/02/2026
Special inspection requirement — Final
05/26/2026
Permit issued — General Construction
M01340338-I1-GC
05/22/2026
Permit issued — General Construction
M01263083-I1-GC
05/07/2026
Signed off — Alteration
Installation of new plumbing fixtures in relation to renovation filed under GC M01229409-I1.
M01229409-S2
05/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Filed — Alteration
INTERIOR RENOVATIONS OF APT. 1,2D AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01383105-I1
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Blake Goble
04/13/2026
Special inspection requirement — Post-installed Anchors
Blake Goble
04/13/2026
Special inspection requirement — Interior lighting power
Blake Goble
04/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Blake Goble
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Blake Goble
04/13/2026
Special inspection requirement — Lighting controls
Blake Goble
04/06/2026
Special inspection requirement — Final
Blake Goble
04/02/2026
Signed off — Alteration
Installation of new plumbing fixtures in relation to renovation filed under GC M01229409-I1.
M01229409-S1
03/24/2026
Permit issued — General Construction
M01340338-I1-GC
03/24/2026
Permit issued — General Construction
M01263083-I1-GC
03/17/2026
Signed off — Alteration
Installation of new plumbing fixtures in relation to renovation filed under GC M01229409-I1.
M01229409-I1
03/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/10/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
01/07/2026
Signed off — Alteration
M01150433-I1
01/07/2026
Filed — Alteration
M01340338-I1
01/06/2026
Signed off — Alteration
M01150402-I1
12/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2025
Permit issued — Plumbing
M01263083-S1-PL
11/06/2025
Permit issued — General Construction
M01263083-I1-GC
10/28/2025
Objection resolved — Addressed
09/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 264 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT209/13/2026
GREENWICH TOWER OWNERS3007/08/2026
1 LEX AVE CP703/22/2026
1 LEX AVE CP % INSIGNIA/5203/22/2026
1 LEX AVE CP & INSIGNA203/22/2026
1 LEXIGNTON C/P INSIGNIA103/22/2026
DELUC103/22/2026
INSIGINIA RESIDENTIAL GROUP603/21/2026
1 LEXINGTON AVENUE1303/21/2026
SELECT EQUITY GROUP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING403/21/2026
AZAR ASSOCIATES403/21/2026
JAM CONSULTANTS, INC.403/21/2026
JM ZONING, LLC.1203/21/2026
DOMANI CONSULTING603/21/2026
NOEL BUILDING CONSULTING INC603/21/2026
SYNERGY BUILDING CONSULTANTS603/21/2026
CODE603/21/2026
METROPOLIS GROUP INC803/21/2026
WILLIAM VITACCO ASSOCIATES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IA CONSTRUCTION MGMT, INCGeneral Contractor1409/09/2026
WEST NEW YORK RESTORATION OF CTGeneral Contractor1107/08/2026
GMG CARPENTRY INCGeneral Contractor607/08/2026
LINDEN MARSHALL CONTRACTING INCGeneral Contractor603/21/2026
UBERTO, LTDGeneral Contractor507/08/2026
FEB GENERAL CONTRACTOR COGeneral Contractor403/21/2026
V C S MECHANICAL INCGeneral Contractor407/08/2026
PETER BISHUNElectrical303/21/2026
ASPECT PLBNG&HTNG CO LLCPlumbing207/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
PAC ELECTRIC CORP.Electrical103/22/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
RICHARD WEHNERElectrical103/21/2026
WILFRED JEFFREYElectrical103/21/2026
CATALYST DEVELOPMENT GROUPGeneral Contractor107/08/2026
DEGA CONSTRUCTION CORPGeneral Contractor104/09/2026
LIQUID 12 INTERIORS INCGeneral Contractor107/08/2026
POLAR MECHANICAL CORPGeneral Contractor104/09/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
BUDGET PLBG & HTG LLCPlumbing107/08/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
APOLLO ELECTRIC NYG, INCElectrical103/22/2026
TRI STATE PLBG & HTG INCPlumbing109/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P.A.COLLINS INSPECTIONS P21681606/24/2026
B SPACE, LLC8036104/22/2026
CROSSCHECK INSPECTION SER544209/05/2025
AMMOR ARCHITECTURE LLP3054409/05/2025
CHARLES G MICHEL ENGINEER2871209/03/2025
CHANG PARK ARCH. P.C.663108/27/2025
SARAH GORDON DRAKE ARCHIT4744202/03/2025
ERIC SHEFFIELD ARCHITECT2195112/13/2024
PIRO STUDIO LLC7503106/09/2024
SKYLINE ENGINEERING, PLLC267204/03/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTRI STATE PLBG & HTG INC09/22/2026
DOB NOWMechanical SystemsPermit IssuedIA CONSTRUCTION MGMT, INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedCATALYST DEVELOPMENT GROUP06/17/2026
DOB NOWMechanical SystemsPermit IssuedGMG CARPENTRY INC06/02/2026
DOB NOWGeneral ConstructionPermit IssuedGMG CARPENTRY INC05/26/2026
DOB NOWGeneral ConstructionPermit IssuedGMG CARPENTRY INC05/22/2026
DOB NOWGeneral ConstructionPermit IssuedGMG CARPENTRY INC03/24/2026
DOB NOWGeneral ConstructionPermit IssuedGMG CARPENTRY INC03/24/2026
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP11/13/2025
DOB NOWGeneral ConstructionPermit IssuedGMG CARPENTRY INC11/06/2025
DOB NOWMechanical SystemsPermit IssuedIA CONSTRUCTION MGMT, INC09/10/2025
DOB NOWGeneral ConstructionSigned-offDEGA CONSTRUCTION CORP07/29/2025
DOB NOWMechanical SystemsSigned-offV C S MECHANICAL INC07/03/2025
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS06/13/2025
DOB NOWMechanical SystemsSigned-offPOLAR MECHANICAL CORP06/09/2025
DOB NOWGeneral ConstructionSigned-offLIQUID 12 INTERIORS INC06/06/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC02/20/2025
DOB NOWMechanical SystemsPermit IssuedIA CONSTRUCTION MGMT, INC10/23/2024
DOB NOWStructuralSigned-offIA CONSTRUCTION MGMT, INC10/22/2024
DOB NOWMechanical SystemsSigned-offV C S MECHANICAL INC07/17/2024
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC03/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offA. PETER LUGER CONST INC03/04/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC02/29/2024
DOB NOWGeneral ConstructionPermit IssuedUBERTO, LTD02/22/2024
DOB NOWMechanical SystemsPermit IssuedUBERTO, LTD02/22/2024
DOB NOWStructuralSigned-offIA CONSTRUCTION MGMT, INC10/23/2023
DOB NOWMechanical SystemsPermit IssuedIA CONSTRUCTION MGMT, INC10/23/2023
DOB NOWPlumbingSigned-offASPECT PLBNG&HTNG CO LLC10/12/2023
DOB NOWGeneral ConstructionSigned-offA. PETER LUGER CONST INC10/02/2023
DOB NOWPlumbingSigned-offASPECT PLBNG&HTNG CO LLC05/02/2023
DOB NOWMechanical SystemsSigned-offFEB GENERAL CONTRACTOR04/28/2023
DOB NOWGeneral ConstructionSigned-offFEB GENERAL CONTRACTOR04/28/2023
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC04/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offA. PETER LUGER CONST INC03/14/2023
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC03/10/2023
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC12/28/2022
DOB NOWGeneral ConstructionPermit IssuedLINDEN MARSHALL CONTRACTI12/09/2022
DOB NOWMechanical SystemsPermit IssuedIA CONSTRUCTION MGMT, INC11/02/2022
DOB NOWStructuralSigned-offIA CONSTRUCTION MGMT, INC11/02/2022
DOB NOWGeneral ConstructionSigned-offA. PETER LUGER CONST INC10/05/2022
+ 56 more permits on file
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/10/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/01/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 143
DateRequirementInspectorRole
06/23/2026Energy Code Compliance InspectionsPaul Collinsprogress
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026Fire-Resistance Rated Construction—progress
06/16/2026Post-installed Anchors—special
06/16/2026Tenant Protection Plan Compliance—special
06/15/2026Post-installed AnchorsPaul Collinsspecial
06/15/2026Heating SystemsPaul Collinsspecial
06/15/2026Fire-Resistant Penetrations and JointsPaul Collinsspecial
06/15/2026HVAC-R and service water heating equipmentPaul Collinsenergy_progress
06/15/2026Maintenance informationPaul Collinsenergy_progress
06/15/2026HVAC-R and service water piping design and insulationPaul Collinsenergy_progress
06/15/2026Energy Code Compliance InspectionsPaul Collinsprogress
06/15/2026Fire-Resistance Rated Construction—progress
06/15/2026Post-installed Anchors—special
06/15/2026Fire-Resistant Penetrations and Joints—special
06/15/2026HVAC-R and service water heating system controlsPaul Collinsenergy_progress
06/15/2026Fire-Resistant Penetrations and JointsPaul Collinsspecial
06/15/2026Lighting controls—energy_progress
06/15/2026Interior lighting power—energy_progress
06/03/2026Final—progress
06/03/2026FinalPaul Collinsprogress
06/03/2026Mechanical SystemsPaul Collinsspecial
06/02/2026Final—progress
04/13/2026Fire-Resistance Rated ConstructionBlake Gobleprogress
04/13/2026Interior lighting powerBlake Gobleenergy_progress
Latest 25 of 143.
▾Documents — 592 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch46
09/06/2026M01383105-S2Request digital key ↗
09/06/2026M01383105-S1Request digital key ↗
09/03/2026M00527645-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/03/2026M00345448-P2Request digital key ↗
09/03/2026M00345448-P1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION45
11/28/2025101674476Open ↗
07/15/2025101674476Open ↗
07/10/2025101674476Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION37
07/08/2025101674476Open ↗
07/07/2020140900906Open ↗
04/23/2019123099878Open ↗
Showing 3 of 37 on file for this type
▸Seals & Professional Certifications216
▸DOB NOWProgress Inspector Seal & Signature74
09/23/2026M00821753-I1Open ↗
09/23/2026M00974842-P3Open ↗
09/23/2026M00821753-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/06/2026M01383105-S1Open ↗
09/06/2026M01383105-S2Open ↗
09/03/2026M00345448-P2Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/23/2026M00974842-P3Open ↗
09/23/2026M00974842-P3Open ↗
09/23/2026M00821753-I1Open ↗
Showing 3 of 43 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
12/19/2019123099878Open ↗
09/17/2019123127758Open ↗
09/17/2019123127758Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/13/2020140900906Open ↗
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING14
07/15/2025101674476Open ↗
07/10/2025101674476Open ↗
Showing 2 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
01/31/2018123151356Open ↗
06/29/2017123099878Open ↗
10/03/2016122206415Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
09/09/2015122058726Open ↗
03/11/2015122058726Open ↗
Showing 2 of 5 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes5
08/24/2018123127758Open ↗
07/30/2018123469479Open ↗
01/31/2018123151356Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan4
09/03/2026M00345448-P2Open ↗
09/03/2026M00345448-P1Open ↗
Showing 2 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
11/16/2018123127758Open ↗
07/30/2018123469479Open ↗
▸Environmental & Asbestos57
▸DOB NOWDEP ACP-5: Asbestos Assessment Report40
09/06/2026M01383105-S1Open ↗
09/06/2026M01383105-S2Open ↗
09/03/2026M00345448-P1Open ↗
Showing 3 of 40 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
05/13/2020140900906Open ↗
08/24/2018123127758Open ↗
07/30/2018123469479Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/05/2014122058726Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
10/24/2014122058726Open ↗
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
12/19/2019123099878Open ↗
09/17/2019123127758Open ↗
09/17/2019123127758Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
10/01/2020123151356Open ↗
09/30/2020123469479Open ↗
12/19/2019123099878Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/01/2020123151356Open ↗
10/01/2020123151356Open ↗
09/30/2020123469479Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/07/2022140900906Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/26/2014122058726Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/01/2020123151356Open ↗
10/01/2020123151356Open ↗
09/30/2020123469479Open ↗
Showing 3 of 8 on file for this type
▸BISPOST-INSTALLED ANCHORS1
06/30/2022140900906Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/01/2022140900906Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
07/08/2022140900906Open ↗
10/01/2020123151356Open ↗
09/30/2020123469479Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/17/2019123127758Open ↗
10/01/2015122206415Open ↗
▸BISFINAL1
07/07/2022140900906Open ↗
▸BISSUPERSEDING LETTER1
07/08/2025101674476Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT26
10/01/2020123151356Open ↗
09/30/2020123469479Open ↗
05/13/2020140900906Open ↗
Showing 3 of 26 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
07/19/2020140900906Open ↗
10/31/2018123469479Open ↗
07/21/2016122779118Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/30/2022140900906Open ↗
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET19
09/04/2018123469479Open ↗
08/24/2018123127758Open ↗
07/30/2018123469479Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION19
08/13/2025101674476Open ↗
12/07/2021140900906Open ↗
06/02/2020140900906Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM5
07/08/2025101674476Open ↗
12/19/2019123099878Open ↗
12/12/2019123099878Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/13/2020140900906Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
12/05/2014122058726Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
11/20/2025101674476Open ↗