← Back
Bungalow colony - cooperatively owned land
1 MAPLE AVENUE
BRONX · BIN 2097625
💬 Discuss this project
1921Year Built
2Stories
A8Building Class
R4AZoning
63,464 sfGross Floor Area
44Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: SILVER BEACH GARDENS CORPORATION · 134,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/15/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/16/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01224229-I1
05/22/2025
Permit issued — Solar
X01224229-I1-SL
05/15/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01224229-I1
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/12/2025
Special inspection requirement — Final
Walid Abdulla
05/12/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/22/2025
BIS—RE-ISSUEDCREATIVE HOME INNOVATIONS INC.03/08/2007
BISPLISSUEDTODINO SEWER & WATER SERVICE INC01/26/2007
BIS—ISSUEDCREATIVE HOME INNOVATIONS INC.09/11/2006
1 project · most recent 05/15/2025
FiledStatusContractorScope
05/15/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/12/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/12/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/12/2025Energy Code Compliance InspectionsWalid Abdullaprogress
05/12/2025FinalWalid Abdullaprogress
05/12/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026X01224229-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/28/2026X01224229-I1Open ↗
09/28/2026X01224229-I1Open ↗
09/28/2026X01224229-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/28/2026X01224229-I1Open ↗
09/28/2026X01224229-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01224229-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01224229-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01224229-I1Open ↗