← Back
Over six families without stores
1 MONROE PLACE
BROOKLYN · BIN 3001898
💬 Discuss this project
1852Year Built
5Stories
C1Building Class
R7-1Zoning
7,974 sfGross Floor Area
16Units
Rent Stabilized78 Open Violations ▸
Over six families without stores · Owner of record: ONE MONROE LLC · 1,950 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction62p · 3 filings · 20 docs
Floor 4Under Construction56p · 3 filings · 20 docs
Floor 3Under Construction61p · 3 filings · 20 docs
Floor 2Under Construction58p · 3 filings · 20 docs
Floor 1Under Construction57p · 3 filings · 20 docs
CellarUnder Construction65p · 3 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-BasementUnder Construction51p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FORTITUDE CAPITAL2209/01/2026
OWNERS REP507/08/2026
ONE MONROE LLC2603/22/2026
RTR CONSTRUCTION3303/22/2026
KTC DESIGN GROUP303/22/2026
KKA CONSOLIDATED INC 1103/22/2026
RTP CONSTRUCTION CO INC103/22/2026
RTE CONSTRUCTION CO INC103/22/2026
IDLEWILD 94-100 CLARK LLC703/22/2026
OWNER OF 100 CLARK ST303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC1708/14/2026
JOEL PHAGOO P.E. PLLC407/25/2023
PAUL PERDEK, PROF. ENG. PLLC112/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE803/21/2026
LEVIN ENGINEERING PLLC1803/21/2026
MUNICIPAL BUILDING CONSULTANTS603/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKM CONSTRUCTION NY CORPGeneral Contractor507/08/2026
EVS ELECTRIC CORPElectrical303/22/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor307/08/2026
AQUEDUCT MECHANICAL CORPFire Protection207/23/2026
RTR CONSTRUCTION CO INCGeneral Contractor204/09/2026
JUST PLBG & HTG INCPlumbing207/02/2026
SYED-NAQVI ALTAFElectrical103/21/2026
BUA, JAMESElectrical103/21/2026
TYMINSKI, DARIUSZElectrical103/21/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
CLARKE, HAROLDElectrical103/21/2026
ENDRULAT, EDMUNDElectrical103/21/2026
GILSTON, HARVEYElectrical103/21/2026
JOE MIDDLETONElectrical103/21/2026
JOHN JR MARIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSULTING ENGINEER50931308/14/2026
JOEL PHAGOO ,PE, PLLC2416106/20/2023
Building Lifecycle
All (151)Filed (22)Permit Issued (15)Signed Off (5)Violation (60)Inspection (19)Special Inspection (30)
09/01/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH
B00293917-I1
08/14/2026
Filed — Alteration
installation of plumbing fixtures as per plans filed herewith.
B00293195-P7
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
08/12/2026
Signed off — Alteration
B00293147-I1
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2026
Permit issued — Sprinklers
B00293147-I1-EW-SP
05/15/2026
Filed — Alteration
installation of plumbing fixtures as per plans filed herewith.
B00293195-P6
03/09/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/18/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/11/2025
Signed off — Alteration
B00435302-I1
11/06/2025
Permit issued — Plumbing
B00293195-I1-PL
09/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/28/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2025
Permit issued — Mechanical Systems
B00293917-I1-MS
07/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2025
Violation issued (HPD, closed)
A
03/10/2025
Special inspection requirement — Sprinkler Systems
John Natoli
03/10/2025
Special inspection requirement — Maintenance information
John Natoli
03/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
John Natoli
03/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
03/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
John Natoli
03/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
John Natoli
03/10/2025
Special inspection requirement — Ventilation and air distribution system
John Natoli
03/10/2025
Special inspection requirement — Mechanical Systems
John Natoli
03/10/2025
Special inspection requirement — Final
John Natoli
02/25/2025
Filed — Alteration
installation of plumbing fixtures as per plans filed herewith.
B00293195-P5
02/25/2025
Filed — Alteration
B00293147-P2
02/25/2025
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH
B00293917-P4
02/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
John Natoli
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
02/24/2025
Special inspection requirement — Mechanical Systems
John Natoli
02/24/2025
Special inspection requirement — Final
John Natoli
02/24/2025
Special inspection requirement — Maintenance information
John Natoli
02/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
John Natoli
02/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
John Natoli
02/24/2025
Special inspection requirement — Ventilation and air distribution system
John Natoli
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
02/24/2025
Special inspection requirement — Sprinkler Systems
John Natoli
01/22/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/25/2024
Violation issued (HPD, closed)
I
10/10/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2024
Permit issued — Mechanical Systems
B00293917-I1-MS
09/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/12/2024
Permit issued — Plumbing
B00293195-I1-PL
09/11/2024
Permit issued — Sprinklers
B00293147-I1-EW-SP
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAQUEDUCT MECHANICAL CORP07/22/2026
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK11/06/2025
DOB NOWMechanical SystemsSigned-offRTR CONSTRUCTION CO INC07/29/2025
DOB NOWMechanical SystemsSigned-offRTR CONSTRUCTION CO INC09/19/2024
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK09/12/2024
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP09/11/2024
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY10/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offAKM CONSTRUCTION NY07/25/2023
DOB NOWSupported ScaffoldPermit IssuedAKM CONSTRUCTION NY06/20/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/01/2022
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY10/05/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/02/2021
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY07/07/2021
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR02/10/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2020
BIS—ISSUEDRTR CONSTRUCTION CO INC08/22/2024
BISEQISSUEDRTR CONSTRUCTION CO INC08/08/2024
BIS—ISSUEDRTR CONSTRUCTION CO INC06/09/2023
BISEQISSUEDRTR CONSTRUCTION CO INC11/16/2022
BISEQISSUEDSPRING SCAFFOLDING LLC11/11/2022
BISEQISSUEDSPRING SCAFFOLDING LLC09/13/2022
BIS—ISSUEDRTR CONSTRUCTION CO INC05/24/2022
BISEQISSUEDSPRING SCAFFOLDING LLC11/12/2021
BISEQISSUEDSPRING SCAFFOLDING LLC09/03/2021
BIS—ISSUEDRTR CONSTRUCTION CO INC07/27/2021
BISEQISSUEDRTR CONSTRUCTION CO INC01/27/2021
BISEQISSUEDSPRING SCAFFOLDING LLC11/12/2020
BIS—ISSUEDRTR CONSTRUCTION CO INC11/12/2020
BISPLISSUEDEH PLUMBING & HEATING COR09/28/2020
BISEQISSUEDSPRING SCAFFOLDING LLC08/20/2020
BISPLISSUEDEH PLUMBING & HEATING COR09/04/2019
BISEQISSUEDSPRING SCAFFOLDING LLC08/20/2019
BISEQISSUEDRTR CONSTRUCTION CO INC08/02/2019
BISOTISSUEDKTC DESIGN GROUP INC03/07/2019
BISEQISSUEDSPRING SCAFFOLDING LLC11/09/2018
BISEQISSUEDSPRING SCAFFOLDING LLC08/09/2018
BISOTISSUEDKTC DESIGN GROUP INC02/23/2018
BISEQISSUEDKTC DESIGN GROUP INC02/23/2018
BISOTISSUEDKTC DESIGN GROUP INC02/23/2018
BISOTISSUEDKTC DESIGN GROUP INC02/23/2018
+ 25 more permits on file
1 project · most recent 02/25/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/25/2025Signed-offRTR CONSTRUCTION CO INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM60NAM2-U1 5 tons · Heat Pump Outdoor ×3
MXZ-SM48NAM-U1 4 tons · Heat Pump Outdoor ×1
SUZ-KA12NA2 1 tons · Heat Pump Outdoor ×1
SUZ-KA15NA2 1 tons · Heat Pump Outdoor ×1
1 project · most recent 08/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/14/2026Permit IssuedJUST PLBG & HTG INCGas, Storm, Water/Sanitary
6 projects · most recent 11/02/2025
General Wiring
FiledStatusContractorScope
11/02/2025Permit IssuedEVS ELECTRIC CORPGeneral Wiring
07/18/2024CancelledEVS ELECTRIC CORPGeneral Wiring
12/25/2023Permit IssuedA&E ELECTRICAL SYSTEMS COGeneral Wiring
11/19/2023Permit IssuedA&E ELECTRICAL SYSTEMS COGeneral Wiring
06/30/2021CompleteNASH ELECTRIC SERVICES IN—
03/04/2020Permit IssuedA&E ELECTRICAL SYSTEMS CO1 meters, 1 new_meters
1 project · most recent 06/20/2023
Scaffold
FiledStatusContractorScope
06/20/2023Permit IssuedAKM CONSTRUCTION NY CORPScaffold
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/22/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/22/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/28/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/22/2025Fail-Final Boiler Equipment InspectionFailView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/10/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/13/2026Fire-Resistant Penetrations and JointsJohn Natolispecial
03/10/2025Sprinkler SystemsJohn Natolispecial
03/10/2025Maintenance informationJohn Natolienergy_progress
03/10/2025HVAC-R and service water heating equipmentJohn Natolienergy_progress
03/10/2025Fire-Resistant Penetrations and JointsJohn Natolispecial
03/10/2025HVAC-R and service water heating system controlsJohn Natolienergy_progress
03/10/2025HVAC-R and service water piping design and insulationJohn Natolienergy_progress
03/10/2025Ventilation and air distribution systemJohn Natolienergy_progress
03/10/2025Mechanical SystemsJohn Natolispecial
03/10/2025FinalJohn Natoliprogress
02/24/2025HVAC-R and service water heating equipmentJohn Natolienergy_progress
02/24/2025Fire-Resistant Penetrations and JointsJohn Natolispecial
02/24/2025Mechanical SystemsJohn Natolispecial
02/24/2025FinalJohn Natoliprogress
02/24/2025Maintenance informationJohn Natolienergy_progress
02/24/2025HVAC-R and service water heating system controlsJohn Natolienergy_progress
02/24/2025HVAC-R and service water piping design and insulationJohn Natolienergy_progress
02/24/2025Ventilation and air distribution systemJohn Natolienergy_progress
02/24/2025Fire-Resistant Penetrations and JointsJohn Natolispecial
02/24/2025Sprinkler SystemsJohn Natolispecial
06/18/2024HVAC-R and service water heating system controls—energy_progress
06/18/2024HVAC-R and service water piping design and insulation—energy_progress
06/18/2024HVAC-R and service water heating equipment—energy_progress
06/18/2024Ventilation and air distribution system—energy_progress
06/18/2024FinalJohn Natoliprogress
Latest 25 of 30.
▾Documents — 464 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch - Plumbing8
08/27/2026B00293195-P7Request digital key ↗
08/27/2026B00293195-I1Request digital key ↗
08/27/2026B00293195-P6Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch6
09/01/2026B00546924-P1Request digital key ↗
09/01/2026B00546924-I1Request digital key ↗
08/27/2026B00293147-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/02/2026B00293917-P1Request digital key ↗
09/02/2026B00293917-I1Request digital key ↗
09/02/2026B00293917-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/27/2026B00293147-I1Request digital key ↗
08/15/2026B00293147-P2Request digital key ↗
08/15/2026B00293147-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00435302-I1Request digital key ↗
▸Applications & Permits105
▸BISPLAN / WORK APPROVAL APPLICATION58
08/13/2025322120085Open ↗
07/03/2025322120085Open ↗
06/12/2025340918537Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION27
08/22/2024320296005Open ↗
08/12/2024320296005Open ↗
08/12/2024320296005Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWLPC Approval/Permit14
08/27/2026B00293195-P7Open ↗
08/27/2026B00293195-P6Open ↗
08/13/2026B00293917-P1Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
06/25/2019320296005Open ↗
02/12/2019321275320Open ↗
02/12/2019321237853Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
06/12/2025340918537Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT I: CERTIFICATION2
08/20/2025322120085Open ↗
03/04/2019320296005Open ↗
▸BISZONING RESOLUTION DETERMINATION2
03/04/2019320296005Open ↗
03/04/2019320296005Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/20/2025322120085Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/04/2019320296005Open ↗
▸Seals & Professional Certifications91
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
07/12/2019320296005Open ↗
07/12/2019320296005Open ↗
07/12/2019320296005Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/27/2026B00293195-P7Open ↗
08/27/2026B00293195-P6Open ↗
08/27/2026B00293147-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/26/2026B00293917-I1Open ↗
08/26/2026B00293917-I1Open ↗
08/26/2026B00293917-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/28/2026B00293195-P7Open ↗
08/26/2026B00293917-I1Open ↗
08/25/2026B00293917-P3Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/01/2019321926369Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/01/2019321926369Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/12/2025340918537Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes3
03/01/2019321926369Open ↗
10/19/2016321467783Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREE CHECKLIST3
06/12/2025340918537Open ↗
08/13/2019320296005Open ↗
08/05/2019320296005Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/12/2019320296005Open ↗
11/28/2016321373223Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/12/2025340918537Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
05/29/2025320296005Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
11/28/2016321373223Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00435302-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/27/2026B00293195-P7Open ↗
08/27/2026B00293195-P6Open ↗
08/27/2026B00293147-P2Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/19/2016321467783Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/04/2019320296005Open ↗
04/19/2018321373223Open ↗
04/19/2018321373223Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/29/2025320296005Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/02/2026B00293917-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/05/2024320296005Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
05/29/2025320296005Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/29/2025320296005Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/05/2019320296005Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/05/2019320296005Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
05/30/2025320296005Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/29/2025320296005Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
05/29/2025320296005Open ↗
▸Approvals, Objections & Sign-offs44
▸BISLETTERS - SUPPORTING DOCUMENTATION11
08/20/2025322120085Open ↗
06/21/2024320296005Open ↗
02/10/2021321237853Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
06/24/2024320296005Open ↗
06/21/2024320296005Open ↗
12/16/2021320296005Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
03/23/2023321275320Open ↗
03/23/2023321237853Open ↗
05/14/2019321926369Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL5
08/20/2025322120085Open ↗
06/12/2025340918537Open ↗
05/14/2019321926369Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER1
09/22/2016321237853Open ↗
▸BISTRANSIT AUTHORITY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
08/29/2017321373223Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT14
05/14/2019321926369Open ↗
03/01/2019321926369Open ↗
04/19/2018321467783Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
02/26/2018321373223Open ↗
02/28/2017321373223Open ↗
12/20/2016321373223Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
02/26/2018321373223Open ↗
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION22
04/23/2025320296005Open ↗
02/28/2025320296005Open ↗
07/12/2023320296005Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET15
07/03/2025322120085Open ↗
02/28/2019321926369Open ↗
10/19/2016321467783Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM8
02/10/2021321237853Open ↗
05/14/2019321926369Open ↗
07/05/2018320296005Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAI1 Form4
08/27/2026B00293195-P6Open ↗
08/27/2026B00293195-P7Open ↗
08/13/2026B00293195-P5Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/12/2025340918537Open ↗
▸Other Documents46
▸DOB NOWDHCR Document31
08/27/2026B00293195-P7Open ↗
08/27/2026B00293195-P7Open ↗
08/27/2026B00293195-P6Open ↗
Showing 3 of 31 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
07/03/2025322120085Open ↗
07/03/2025322120085Open ↗
03/23/2023321275320Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM3
08/20/2025322120085Open ↗
08/20/2025322120085Open ↗
Showing 2 of 3 on file for this type
▸BISSTRUCTURAL COLD-FORMED STEEL1
05/29/2025320296005Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/12/2019320296005Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/29/2025320296005Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
05/30/2025320296005Open ↗
▸BISDHCR DOCUMENT1
06/12/2025340918537Open ↗
▸BISSupporting Document: Fee Exempt1
03/28/2025320296005Open ↗