← Back
BuildNYC
Four families
1 MONTAGUE TERRACE
BROOKLYN · Brooklyn Heights · BIN 3002032
💬 Discuss this project
1879Year Built
4Stories
C3Building Class
R6Zoning
8,595 sfGross Floor Area
4Units
Rent Stabilized6 Active Violations ▸
Four families · Owner of record: B2W Estate · 3,640 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 229p · 1 filing · 20 docs
Floor 130p · 1 filing · 20 docs
Cellar30p · 1 filing · 20 docs
Basement7p · 1 filing · 20 docs
Sub-Basement27p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B2W Estate103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/15/2023$10.0M—— → —$1,163/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Christopher Teeter709/15/2026
West Hudson Engineering103/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Christopher Teeter RA1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B36 ServicesGeneral Contractor603/21/2026
Peeps ServicesGeneral Contractor303/21/2026
Crossfield Plumbing & HeatingPlumbing309/29/2026
Jan Artisanal Concept *General Contractor207/08/2026
WMS Electrical ContngElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Assure Professional Engineering6962508/31/2026
Building Lifecycle
All (88)Filed (8)Permit Issued (3)Signed Off (1)Violation (22)Inspection (3)Objection (14)Special Inspection (30)
10/13/2026
Signed off — Alteration
PLUMBING WORK AS INDICATED ON THE DRAWINGS.
B00977953-S2
09/28/2026
Permit renewed — Plumbing
Renewed without changes
B00977953-S2-PL
09/16/2026
Objection raised — Other
09/15/2026
Filed — Alteration
PLUMBING WORK AS INDICATED ON THE DRAWINGS.
B00977953-P7
09/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/31/2026
Filed — Alteration
PLUMBING WORK AS INDICATED ON THE DRAWINGS.
B00977953-P5
08/31/2026
Filed — Alteration
PLUMBING WORK AS INDICATED ON THE DRAWINGS.
B00977953-P6
08/31/2026
Special inspection requirement — Lighting controls
Christopher Teeter
08/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/31/2026
Special inspection requirement — Interior lighting power
Christopher Teeter
08/31/2026
Special inspection requirement — Final
ROMAN MARDAREWICH
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
08/31/2026
Special inspection requirement — Lighting in dwelling units
Christopher Teeter
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
04/04/2026
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
B00977953-S1-GC-CX
03/20/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00977953-I1-GC
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
09/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/03/2025
Permit renewed — Plumbing
Renewed without changes
B00977953-S2-PL
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
08/08/2025
Objection resolved — Addressed
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
08/07/2025
Special inspection requirement — Lighting controls
Christopher Teeter
08/07/2025
Special inspection requirement — Interior lighting power
Christopher Teeter
08/07/2025
Special inspection requirement — Lighting in dwelling units
Christopher Teeter
08/07/2025
Special inspection requirement — Final
ROMAN MARDAREWICH
08/05/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Scope
07/23/2025
Filed — Alteration
PLUMBING WORK AS INDICATED ON THE DRAWINGS.
B00977953-P4
07/16/2025
Special inspection requirement — Interior lighting power
Christopher Teeter
07/16/2025
Special inspection requirement — Lighting controls
Christopher Teeter
07/16/2025
Special inspection requirement — Lighting in dwelling units
Christopher Teeter
07/16/2025
Special inspection requirement — Final
ROMAN MARDAREWICH
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
07/10/2025
Objection raised — Scope
06/27/2025
Filed — Alteration
PLUMBING WORK AS INDICATED ON THE DRAWINGS.
B00977953-P1
06/10/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
04/24/2025
Permit renewed — General Construction
Renewed without changes
B00977953-I1-GC
04/04/2025
Permit renewed — Structural
Renewed with changes
B00977953-S1-GC-CX
01/22/2025
Permit renewed — Foundation
Renewed without changes
B00977953-S1-GC-CX
11/25/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
10/07/2024
Permit issued — General Construction
B00977953-S1-GC-CX
07/17/2024
Objection resolved — Addressed
06/11/2024
Objection resolved — Addressed
06/11/2024
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
GUNJAN KHANDWALA
06/11/2024
Special inspection requirement — Masonry
GUNJAN KHANDWALA
06/11/2024
Special inspection requirement — Underpinning
GUNJAN KHANDWALA
06/11/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GUNJAN KHANDWALA
06/11/2024
Special inspection requirement — Preliminary
JORDAN CECININI
06/11/2024
Special inspection requirement — Lowest Floor Elevation
JORDAN CECININI
05/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/22/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2024
Permit issued — Plumbing
B00977953-S2-PL
04/11/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
04/10/2024
Permit issued — General Construction
B00977953-I1-GC
03/14/2024
Objection raised — Other
03/14/2024
Objection raised — Structural
03/14/2024
Objection raised — Inspections
03/08/2024
Filed — Alteration
PLUMBING WORK AS INDICATED ON THE DRAWINGS.
B00977953-S2
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating09/28/2026
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating09/03/2025
DOB NOWGeneral ConstructionPermit IssuedJan Artisanal Concept *04/24/2025
DOB NOWStructuralPermit IssuedPeeps Services04/04/2025
DOB NOWFoundationPermit IssuedB36 Services01/22/2025
DOB NOWGeneral ConstructionPermit IssuedB36 Services10/07/2024
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating05/07/2024
DOB NOWGeneral ConstructionPermit IssuedJan Artisanal Concept *04/10/2024
1 project · most recent 09/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/15/2026Signed-offCrossfield Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 04/10/2024
FiledStatusContractorScope
04/10/2024CompleteGoodall Electric—
02/06/2024CompleteWMS Electrical Contng—
1 project · most recent 09/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/15/2026Signed-offCrossfield Plumbing & HeatingSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
09/03/2026Tenant Protection Plan Compliance—special
08/31/2026Lighting controlsChristopher Teeterenergy_progress
08/31/2026Tenant Protection Plan Compliance—special
08/31/2026Interior lighting powerChristopher Teeterenergy_progress
08/31/2026FinalROMAN MARDAREWICHprogress
08/31/2026Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
08/31/2026Lighting in dwelling unitsChristopher Teeterenergy_progress
08/14/2025Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
08/07/2025Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
08/07/2025Lighting controlsChristopher Teeterenergy_progress
08/07/2025Interior lighting powerChristopher Teeterenergy_progress
08/07/2025Lighting in dwelling unitsChristopher Teeterenergy_progress
08/07/2025FinalROMAN MARDAREWICHprogress
07/16/2025Interior lighting powerChristopher Teeterenergy_progress
07/16/2025Lighting controlsChristopher Teeterenergy_progress
07/16/2025Lighting in dwelling unitsChristopher Teeterenergy_progress
07/16/2025FinalROMAN MARDAREWICHprogress
07/16/2025Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
06/11/2024Underpinning and alternate methods of support of buildings and adjacent propertyGUNJAN KHANDWALAspecial
06/11/2024MasonryGUNJAN KHANDWALAspecial
06/11/2024UnderpinningGUNJAN KHANDWALAspecial
06/11/2024Construction Operations Influencing Adjacent StructuresGUNJAN KHANDWALAspecial
06/11/2024PreliminaryJORDAN CECININIprogress
06/11/2024Lowest Floor ElevationJORDAN CECININIprogress
05/24/2024Tenant Protection Plan Compliance—special
Latest 25 of 33.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B00977953-S2Request the plans ↗
08/21/2026B00977953-P3Request the plans ↗
08/15/2026B00977953-I1Request the plans ↗
Showing 3 of 6 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
09/23/2026B00977953-P7Open ↗
09/23/2026B00977953-P6Open ↗
09/23/2026B00977953-P5Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature16
10/03/2026B00977953-I1Open ↗
10/03/2026B00977953-I1Open ↗
10/03/2026B00977953-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/03/2026B00977953-I1Open ↗
09/30/2026B00977953-P4Open ↗
09/23/2026B00977953-P6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/23/2026B00977953-P7Open ↗
09/23/2026B00977953-P6Open ↗
09/23/2026B00977953-P5Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/23/2026B00977953-P7Open ↗
09/23/2026B00977953-P6Open ↗
09/23/2026B00977953-P5Open ↗
Showing 3 of 9 on file for this type