← Back
One story - permanent living quarter
1 MORRIS PLACE
STATEN ISLAND · BIN 5066238
💬 Discuss this project
1940Year Built
1.5Stories
A2Building Class
C3AZoning
603 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 3,040 sf lot · 0.2 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbing
Floor 25p · 1 filing · 7 docs
Floor 14p · 1 filing · 7 docs
Cellar6p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX FLAME SOLUTION INC312/08/2023
NYX ENGINEERING, PLLC203/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYX ENGINEERING, PLLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LL CUSTOM HOMES LLCGeneral Contractor203/21/2026
M.A.C. PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118312/08/2023
JIAN ENGINEERING PLLC7397103/18/2022
Building Lifecycle
All (22)Filed (5)Permit Issued (2)Signed Off (1)Violation (1)Inspection (5)Special Inspection (8)
04/16/2024
Signed off — Alteration
FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION# S00700991-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S00385683-I1
02/21/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/11/2023
Special inspection requirement — HVAC and service water heating equipment
Xiao Huang
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
12/11/2023
Special inspection requirement — HVAC and service water heating system controls
Xiao Huang
12/08/2023
Filed — Alteration
FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION# S00700991-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S00385683-P2
06/29/2023
Filed — Alteration
FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION# S00700991-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S00385683-P1
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
06/29/2023
Special inspection requirement — HVAC and service water heating system controls
Xiao Huang
06/29/2023
Special inspection requirement — HVAC and service water heating equipment
Xiao Huang
05/23/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2023
Permit issued — Plumbing
S00385683-I1-PL
03/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2022
Permit issued — General Construction
S00700991-I1-GC
03/18/2022
Filed — Alteration CO
S00700991-I1
02/19/2021
Filed — Alteration
FILING FOR PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION# S00700991-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S00385683-I1
12/08/2020
Filed — Alteration
S00329873-I1
10/13/2009
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC03/27/2023
DOB NOWGeneral ConstructionPermit IssuedLL CUSTOM HOMES LLC12/12/2022
1 project · most recent 08/27/2024
Boiler Controls
FiledStatusContractorScope
08/27/2024CompleteVOLTRON ELECTRIC LLCBoiler Controls
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/11/2023HVAC and service water heating equipment Xiao Huangenergy_progress
12/11/2023Fire-Resistant Penetrations and JointsXiao Huangspecial
12/11/2023Energy Code Compliance InspectionsXiao Huangprogress
12/11/2023HVAC and service water heating system controls Xiao Huangenergy_progress
06/29/2023Fire-Resistant Penetrations and JointsXiao Huangspecial
06/29/2023Energy Code Compliance InspectionsXiao Huangprogress
06/29/2023HVAC and service water heating system controls Xiao Huangenergy_progress
06/29/2023HVAC and service water heating equipment Xiao Huangenergy_progress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
08/23/2026S00385683-I1Request digital key ↗
08/23/2026S00385683-P2Request digital key ↗
08/15/2026S00385683-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/24/2026S00700991-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026S00329873-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
09/16/2021520136193Open ↗
09/14/2021520136193Open ↗
01/28/2021520136193Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/25/2021520136193Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM1
01/25/2021520136193Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
01/29/2021520136193Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/25/2021520136193Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00700991-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026S00385683-I1Open ↗
08/28/2026S00385683-I1Open ↗
08/28/2026S00385683-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00700991-I1Open ↗
08/23/2026S00385683-I1Open ↗
08/23/2026S00385683-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S00385683-I1Open ↗
08/26/2026S00385683-P1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
08/31/2020520136193Open ↗
▸DOB NOWStreet Tree Checklist1
08/24/2026S00700991-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026S00700991-I1Open ↗
08/23/2026S00385683-I1Open ↗
08/23/2026S00385683-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/29/2021520136193Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00385683-I1Open ↗
08/13/2026S00700991-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/25/2021520136193Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/25/2021520136193Open ↗
09/02/2020520136193Open ↗
09/02/2020520136193Open ↗
▸BISSOIL REPORT1
01/25/2021520136193Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/02/2020520136193Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
01/19/2021520136193Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/25/2021520136193Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
01/25/2021520136193Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
01/25/2021520136193Open ↗
▸DOB NOWProperty Ownership Certification1
08/24/2026S00700991-I1Open ↗