1920Year Built
2.5Stories
C3Building Class
R6BZoning
4,608 sfGross Floor Area
4Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Four families · Owner of record: 1 QUENTIN LLC · 4,000 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof2p · 2 filings · 20 docs
Bulkhead1p · 2 filings · 20 docs
Floor 32p · 2 filings · 20 docs
Floor 21p · 1 filing · 9 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 2 filings · 20 docs
1 job · most recent 08/14/2026
Fence
FiledStatusContractorScope
08/14/2026——Fence
Building Lifecycle
All (41)Filed (5)Violation (3)Objection (3)Special Inspection (30)
08/14/2026
Filed — New Building
PROPOSED ONE 12'-0" WIDE CURB CUTS WITH TWO 1'-6" SPLAYS AS PER PLAN. ANOTHER CURB CUT TO BE FILED UNDER #B01295435-S8.
B01295435-S7
08/14/2026
Filed — New Building
PROPOSED ONE 12'-0" WIDE CURB CUTS WITH TWO 1'-6" SPLAYS AS PER PLAN. ANOTHER CURB CUT TO BE FILED UNDER #B01295435-S8.
B01295435-S8
08/14/2026
Filed — New Building
PROPOSED ONE 12'-0" WIDE CURB CUTS WITH TWO 1'-6" SPLAYS AS PER PLAN. ANOTHER CURB CUT TO BE FILED UNDER #B01295435-S8.
B01295435-S9
10/22/2025
Filed — New Building
PROPOSED ONE 12'-0" WIDE CURB CUTS WITH TWO 1'-6" SPLAYS AS PER PLAN. ANOTHER CURB CUT TO BE FILED UNDER #B01295435-S8.
B01295435-I1
09/30/2025
Special inspection requirement — Concrete - Cast-In-Place
09/30/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/30/2025
Special inspection requirement — Subgrade Inspections
09/30/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
09/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/30/2025
Special inspection requirement — Electrical motors and elevators
09/30/2025
Special inspection requirement — Exterior lighting power
09/30/2025
Special inspection requirement — Air barrier - visual inspection
09/30/2025
Special inspection requirement — Interior lighting power
09/30/2025
Special inspection requirement — Lighting controls
09/30/2025
Special inspection requirement — Fenestration areas
09/30/2025
Special inspection requirement — Lighting in dwelling units
09/30/2025
Special inspection requirement — Maintenance information
09/30/2025
Special inspection requirement — Fenestration air leakage
09/30/2025
Special inspection requirement — Insulation placement and R values
09/30/2025
Special inspection requirement — Metering
09/30/2025
Special inspection requirement — Air barrier — testing
09/30/2025
Special inspection requirement — Protection of exposed foundation insulation
09/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
09/18/2025
Objection raised — Structural
09/02/2025
Objection resolved — Resolved
07/01/2025
Objection raised — Zoning
06/19/2025
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR AND MEZZANINE. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01238590-I1
06/12/2025
Special inspection requirement — Air barrier - visual inspection
06/12/2025
Special inspection requirement — Fenestration areas
06/12/2025
Special inspection requirement — Fenestration air leakage
06/12/2025
Special inspection requirement — Insulation placement and R values
06/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
06/11/2025
Special inspection requirement — Concrete - Cast-In-Place
06/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
12/16/2009
Violation issued (ECB, closed)
Construction
12/16/2009
Violation issued (ECB, open)
Construction
12/16/2009
Violation issued (ECB, open)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1 QUENTIN LLC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/28/2024$1.6M—— → —$347/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S M TAM ARCHITECT, PLLC508/14/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDG & J PLMBNG AND HTG INC07/12/2010
BIS—ISSUEDDEMO PAINTING CONTRA INC07/02/2010
BISPLISSUEDARIANA CONTRACTING INC03/04/2003
BIS—ISSUEDDEMO PAINTING CONTRACTORS INC01/08/2003
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
09/30/2025Concrete - Cast-In-Place—special
09/30/2025Excavations - Sheeting, Shoring, and Bracing—special
09/30/2025Fire-Resistant Penetrations and Joints—special
09/30/2025Subgrade Inspections—special
09/30/2025Wall Panels, Curtain Walls, and Veneers—special
09/30/2025Energy Code Compliance Inspections—progress
09/30/2025Fire-Resistance Rated Construction—progress
09/30/2025Electrical motors and elevators—energy_progress
09/30/2025Exterior lighting power—energy_progress
09/30/2025Air barrier - visual inspection—energy_progress
09/30/2025Interior lighting power—energy_progress
09/30/2025Lighting controls—energy_progress
09/30/2025Fenestration areas—energy_progress
09/30/2025Lighting in dwelling units—energy_progress
09/30/2025Maintenance information—energy_progress
09/30/2025Fenestration air leakage—energy_progress
09/30/2025Insulation placement and R values—energy_progress
09/30/2025Metering—energy_progress
09/30/2025Air barrier — testing —energy_progress
09/30/2025Protection of exposed foundation insulation—energy_progress
09/30/2025Fenestration and door U-factor and product ratings—energy_progress
06/12/2025Air barrier - visual inspection—energy_progress
06/12/2025Fenestration areas—energy_progress
06/12/2025Fenestration air leakage—energy_progress
06/12/2025Insulation placement and R values—energy_progress
Latest 25 of 33.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01238590-I1Contact architect ↗
08/20/2026B01295435-S7Contact architect ↗
08/20/2026B01295435-I1Contact architect ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026B01295435-I1Open ↗
08/13/2026B01295435-I1Open ↗
08/13/2026B01238590-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01238590-I1Open ↗
08/13/2026B01295435-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01295435-I1Open ↗
08/13/2026B01238590-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01238590-I1Open ↗
08/20/2026B01295435-S7Open ↗
08/20/2026B01295435-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01295435-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01295435-I1Open ↗
08/13/2026B01238590-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026B01238590-I1Open ↗
08/13/2026B01295435-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01295435-I1Open ↗
08/13/2026B01238590-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026B01238590-I1Open ↗
08/20/2026B01295435-I1Open ↗