← Back
Bungalow colony - cooperatively owned land
1 ROCKAWAY POINT BLVD
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
350,000 sfGross Floor Area
427Units
LL97 Covered96 Open Violations 73 unresolved · 23 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: NATIONAL PARK SERVICE · 920,966 sf lot · 0.38 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanical
Roof2p · 2 filings · 11 docs
Floor 11p · 1 filing · 5 docs
Cellar2p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOCK DEBOER, AIA302/09/2026
OPTIMIZED ENGINEERING ASSOCIATES102/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING803/21/2026
Building Lifecycle
All (35)Filed (4)Violation (4)Objection (7)Special Inspection (20)
02/22/2026
Objection raised — Other
02/22/2026
Objection raised — Scope
02/22/2026
Objection raised — Cost
02/22/2026
Objection raised — Inspections
02/22/2026
Objection raised — Fire_Protection
02/09/2026
Filed — Alteration
Q01303942-I1
02/09/2026
Filed — Alteration
Q01303942-S1
10/16/2025
Special inspection requirement — Mechanical Systems
10/16/2025
Special inspection requirement — Concrete - Cast-In-Place
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/16/2025
Special inspection requirement — Heating Systems
10/16/2025
Special inspection requirement — Masonry
10/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/16/2025
Special inspection requirement — Final
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/16/2025
Special inspection requirement — Insulation placement and R values
10/16/2025
Special inspection requirement — Air barrier - visual inspection
10/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/16/2025
Special inspection requirement — Lighting controls
10/16/2025
Special inspection requirement — Fenestration air leakage
10/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/16/2025
Special inspection requirement — Lighting in dwelling units
10/16/2025
Special inspection requirement — Shutoff dampers
10/16/2025
Special inspection requirement — Protection of exposed foundation insulation
10/02/2025
Objection raised — Cost
10/02/2025
Objection raised — Scope
09/09/2025
Filed — Alteration
Construction Fence in conjunction with I1 & S2 filing
Q01206016-S1
09/09/2025
Filed — Alteration
Construction Fence in conjunction with I1 & S2 filing
Q01206016-I1
12/17/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/17/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/12/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/12/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
1 project · most recent 09/09/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2025——Heating and Air Conditioning Systems
Heat / Cool
Comfort Aire UMH UltraV Series 48,000 BTU ×1
1 project · most recent 09/09/2025
Concrete
FiledStatusContractorScope
09/09/2025——Concrete
1 project · most recent 09/09/2025
Fence
FiledStatusContractorScope
09/09/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/16/2025Mechanical Systems—special
10/16/2025Concrete - Cast-In-Place—special
10/16/2025Fire-Resistant Penetrations and Joints—special
10/16/2025Heating Systems—special
10/16/2025Masonry—special
10/16/2025Structural Stability – Alterations of existing buildings—special
10/16/2025Final—progress
10/16/2025Energy Code Compliance Inspections—progress
10/16/2025Fire-Resistance Rated Construction—progress
10/16/2025Fenestration and door U-factor and product ratings—energy_progress
10/16/2025Insulation placement and R values—energy_progress
10/16/2025Air barrier - visual inspection—energy_progress
10/16/2025HVAC-R and service water heating system controls—energy_progress
10/16/2025HVAC-R and service water heating equipment—energy_progress
10/16/2025Lighting controls—energy_progress
10/16/2025Fenestration air leakage—energy_progress
10/16/2025HVAC-R and service water piping design and insulation—energy_progress
10/16/2025Lighting in dwelling units—energy_progress
10/16/2025Shutoff dampers—energy_progress
10/16/2025Protection of exposed foundation insulation—energy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026Q01206016-S2Request digital key ↗
08/19/2026Q01206016-I1Request digital key ↗
08/19/2026Q01206016-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01303942-I1Open ↗
08/17/2026Q01303942-S1Open ↗
08/13/2026Q01206016-S1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01303942-S1Open ↗
08/15/2026Q01303942-I1Open ↗
08/13/2026Q01206016-I1Open ↗
Showing 3 of 4 on file for this type