← Back
Bungalow colony - cooperatively owned land
1 ROCKAWAY POINT BLVD
QUEENS · BIN 4464397
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
350,000 sfGross Floor Area
427Units
LL97 Covered92 Open Violations 69 unresolved · 23 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: NATIONAL PARK SERVICE · 920,966 sf lot · 0.38 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction7p · 1 filing · 20 docs
Floor 2Under Construction8p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREEZY POINT COOPERATIVE, INC.1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/11/2026
BUNGALOW DESIGN & ENGINEERING PC402/14/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAND-BAR CONTRACTORS INCGeneral Contractor204/09/2026
MALBRO CONST SERVICES INCGeneral Contractor107/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor106/28/2026
JOSEPH O'GRADY P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/11/2026
BUNGALOW DESIGN & ENGINEE4105201/06/2025
Building Lifecycle
All (32)Filed (5)Permit Issued (5)Signed Off (1)Inspection (2)Objection (4)Special Inspection (15)
06/22/2026
Permit issued — Solar
Q01415079-I1-SL
06/11/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01415079-I1
06/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/11/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
06/11/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/10/2026
Special inspection requirement — Final
Walid Abdulla
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2026
Permit issued — Plumbing
Q01158758-S1-PL
12/09/2025
Special inspection requirement — Sprinkler Systems
Deidre Duffy
12/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Deidre Duffy
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Deidre Duffy
12/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Deidre Duffy
09/10/2025
Permit issued — General Construction
Q01158758-I1-GC-CX
09/09/2025
Signed off — Full Demolition
HAND DEMOLITION OF 1-STORY RESIDENTIAL BUILDING.
Q01161734-I1
08/27/2025
Permit issued — Full Demolition
Q01161734-I1-FD
08/26/2025
Permit issued — Construction Fence
Q01158758-S2-FN
02/18/2025
Objection resolved — Addressed
02/14/2025
Filed — New Building
Install temporary wood construction fence in association with New Building Q01158758 and Demolition Q01161734
Q01158758-S2
02/14/2025
Objection raised — Other
02/14/2025
Objection resolved — Addressed
01/13/2025
Objection raised — Structural
01/06/2025
Filed — Full Demolition
HAND DEMOLITION OF 1-STORY RESIDENTIAL BUILDING.
Q01161734-I1
01/06/2025
Filed — New Building
Install temporary wood construction fence in association with New Building Q01158758 and Demolition Q01161734
Q01158758-I1
01/06/2025
Filed — New Building
Install temporary wood construction fence in association with New Building Q01158758 and Demolition Q01161734
Q01158758-S1
01/06/2025
Special inspection requirement — Permanent certificate
Deidre Duffy
01/06/2025
Special inspection requirement — Maintenance information
Deidre Duffy
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Deidre Duffy
01/06/2025
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
Deidre Duffy
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Deidre Duffy
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/22/2026
DOB NOWPlumbingPermit IssuedJOSEPH O'GRADY P & H INC01/27/2026
DOB NOWGeneral ConstructionPermit IssuedSAND-BAR CONTRACTORS INC09/10/2025
DOB NOWFull DemolitionSigned-offMALBRO CONST SERVICES INC08/27/2025
DOB NOWConstruction FencePermit IssuedSAND-BAR CONTRACTORS INC08/26/2025
2 projects · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026CompletePAPPAS & FODERA ELECT'LGeneral Wiring
06/11/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 06/11/2026
FiledStatusContractorScope
06/11/2026Signed-offSUNRUN INSTALLATION SVC17 panels, 7.65 kw, 357 roof_area_sqft
1 project · most recent 02/14/2025
Fence
FiledStatusContractorScope
02/14/2025Permit IssuedJOSEPH O'GRADY P & H INCFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/11/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/11/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
06/11/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/10/2026FinalWalid Abdullaprogress
06/10/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/10/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/09/2025Sprinkler SystemsDeidre Duffyspecial
12/09/2025HVAC-R and service water heating equipmentDeidre Duffyenergy_progress
12/09/2025HVAC-R and service water piping design and insulationDeidre Duffyenergy_progress
12/09/2025HVAC-R and service water heating system controlsDeidre Duffyenergy_progress
01/06/2025Permanent certificateDeidre Duffyenergy_progress
01/06/2025Maintenance informationDeidre Duffyenergy_progress
01/06/2025Energy Code Compliance InspectionsDeidre Duffyprogress
01/06/2025On-Site Private Sewage Disposal Systems InstallationDeidre Duffyspecial
01/06/2025Fire-Resistant Penetrations and JointsDeidre Duffyspecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01161734-I1Request digital key ↗
08/20/2026Q01158758-I1Request digital key ↗
08/20/2026Q01158758-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01158758-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026Q01158758-S1Open ↗
09/02/2026Q01158758-S1Open ↗
09/02/2026Q01158758-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01158758-S1Open ↗
08/20/2026Q01158758-S2Open ↗
08/20/2026Q01158758-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q01158758-S1Open ↗
09/02/2026Q01158758-S1Open ↗
08/22/2026Q01415079-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q01161734-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01161734-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01161734-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01161734-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01161734-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01161734-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01158758-I1Open ↗
▸DOB NOWHydrant Flow Test Letter1
08/15/2026Q01158758-S1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01158758-I1Open ↗
08/13/2026Q01161734-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01158758-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01161734-I1Open ↗
▸DOB NOWHydraulic Calculations1
08/13/2026Q01158758-S1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01161734-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01161734-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01158758-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01158758-I1Open ↗