← Back
Bungalow colony - cooperatively owned land
1 ROCKAWAY POINT BLVD
QUEENS · BIN 4624970
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
350,000 sfGross Floor Area
427Units
LL97 Covered92 Open Violations 69 unresolved · 23 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: NATIONAL PARK SERVICE · 920,966 sf lot · 0.38 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIRA HOLDING1603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOWER CONSULTING ENGINEERS109/23/2024
TITAN ENGINEERS PC103/05/2024
BOHLER ENGINEERING NY PLLC.502/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GGONZALEZ BOHLERENG COM1203/21/2026
BOHLER ENGINEERING103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WHITESTONE ASSOCIATES ENG8144102/02/2024
Building Lifecycle
All (34)Filed (7)Objection (14)Special Inspection (13)
01/29/2026
Objection resolved — Addressed
12/15/2025
Objection raised — Other
12/04/2025
Objection resolved — Addressed
09/23/2024
Filed — Alteration
FILING HEREWITH FOR THE INSTALLATION OF A NEW WET AND DRY SPRINKLER SYSTEMS FOR A NEW BUILDING FILED UNDER DOB NOWJOB #Q00973194
Q01101525-I1
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/26/2024
Special inspection requirement — Sprinkler Systems
04/16/2024
Objection raised — Other
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
03/05/2024
Filed — Alteration
Q00992594-I1
02/13/2024
Objection raised — Inspections
02/13/2024
Objection raised — Scope
02/12/2024
Objection raised — Admin
02/12/2024
Objection raised — Other
02/12/2024
Objection raised — Scope
02/07/2024
Special inspection requirement — Subgrade Inspections
02/07/2024
Special inspection requirement — Concrete - Cast-In-Place
02/07/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/07/2024
Special inspection requirement — Post-installed Anchors
02/07/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/02/2024
Filed — Alteration
Q00991876-I1
02/02/2024
Filed — Alteration
Filing herewith plans for the installation of a 15' curb cut on Hillside Avenue. No change to use, egress, or occupancy.
Q00992443-I1
02/02/2024
Filed — Alteration
Filing site plans herewith for on-site improvements including proposed pavement, striping, egress, lighting, landscape area and grading updates. No change to use, egress, or occupancy.
Q00991852-I1
02/02/2024
Filed — Alteration
Q00992464-I1
02/02/2024
Filed — Alteration
Q00991927-I1
01/18/2024
Special inspection requirement — Footing and Foundation
01/18/2024
Special inspection requirement — Final
01/17/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/17/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Mudar Khantamr
01/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Mudar Khantamr
01/17/2024
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 09/23/2024
FiledStatusContractorScope
09/23/2024——16 heads
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/29/2024Fire-Resistant Penetrations and Joints—special
08/26/2024Sprinkler Systems—special
02/07/2024Subgrade Inspections—special
02/07/2024Concrete - Cast-In-Place—special
02/07/2024Subsurface Conditions – Fill Placement & In-Place Density—special
02/07/2024Post-installed Anchors—special
02/07/2024Subsurface Investigations (Borings/Test Pits)—special
01/18/2024Footing and Foundation—progress
01/18/2024Final—progress
01/17/2024Subsurface Investigations (Borings/Test Pits)—special
01/17/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMudar Khantamrspecial
01/17/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMudar Khantamrspecial
01/17/2024Final—progress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00991927-I1Request digital key ↗
08/23/2026Q00992464-I1Request digital key ↗
08/23/2026Q00992443-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/18/2025440815977Open ↗
02/15/2024440815977Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/17/2025440815977Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026Q00991927-I1Open ↗
08/23/2026Q00992464-I1Open ↗
08/23/2026Q00992443-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/15/2024440815977Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/15/2024440815977Open ↗
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
12/17/2025440815977Open ↗
▸BISSTREET TREE CHECKLIST1
12/17/2025440815977Open ↗
▸Environmental & Asbestos4
▸DOB NOWOER: Notice to Proceed3
08/13/2026Q00992594-I1Open ↗
08/13/2026Q00991852-I1Open ↗
08/13/2026Q00991876-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
02/15/2024440815977Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/13/2026Q00992594-I1Open ↗
08/13/2026Q00991876-I1Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
02/15/2024440815977Open ↗
▸BISADDITIONAL INFORMATION1
12/17/2025440815977Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/15/2024440815977Open ↗
▸Other Documents1
▸BISBPP - SUPPORTING DOCUMENTATION1
02/15/2024440815977Open ↗