← Back
BuildNYC
Over six families without stores
1 SIDNEY PLACE
BROOKLYN · Brooklyn Heights · BIN 3002532
💬 Discuss this project
1879Year Built
4Stories
C1Building Class
R6Zoning
5,720 sfGross Floor Area
7Units
Rent Stabilized2 Active Violations ▸
Over six families without stores · 2,262 sf lot · 2.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRenovation102p · 2 filings · 20 docs
BulkheadProposed interior renovation2p · 1 filing · 20 docs
Floor 4Renovation95p · 2 filings · 20 docs
Floor 3Renovation95p · 2 filings · 20 docs
Floor 2Renovation101p · 2 filings · 20 docs
Floor 1Renovation93p · 2 filings · 20 docs
CellarRenovation102p · 2 filings · 20 docs
BasementProposed interior renovation78p · 1 filing · 20 docs
Sub-BasementRenovation15p · 1 filing · 20 docs
Site & exteriorRenovation108p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Steering House Construction1207/08/2026
Marmol Radziner1104/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/15/2024$22.1M—1 SIDNEY PL NY CORP. → Private party$3,864/sf building
12/30/2021$7.7M—225 15TH STREET REALTY LLC → 1 SIDNEY PL NY CORP.$1,337/sf building
01/13/2016$4.8M—— → —$830/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
The Vilnits Group2803/21/2026
William Vitacco Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steering House ConstructionGeneral Contractor1607/08/2026
Marmol Radziner An ArchitectsGeneral Contractor604/09/2026
Tri Borough ScaffoldingScaffold603/21/2026
Steering House ConstructionScaffold407/08/2026
MC SuperstructureScaffold307/08/2026
FirequestFire Protection207/08/2026
Starlite Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803307/24/2025
Catalpa Special Inspectio2004204/01/2025
Green Solutions Engineering5478405/27/2024
Robert Litchfield Architects34921304/18/2024
Building Lifecycle
All (146)Filed (24)Permit Issued (24)Signed Off (9)Violation (18)Inspection (6)Objection (35)Special Inspection (30)
03/26/2026
Signed off — Alteration
Existing building exterior brick wall opening at south facade. Structural work includes proposed steel lintel installation and brick wall partial demolition work
B01139869-S2
03/17/2026
Signed off — Alteration
Existing building exterior brick wall opening at south facade. Structural work includes proposed steel lintel installation and brick wall partial demolition work
B01139869-I1
03/17/2026
Signed off — Alteration
Existing building exterior brick wall opening at south facade. Structural work includes proposed steel lintel installation and brick wall partial demolition work
B01139869-S1
11/24/2025
Violation issued (HPD, open)
I
08/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
08/18/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
08/18/2025
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
08/13/2025
Permit issued — Mechanical Systems
B01139869-S2-MS
08/13/2025
Permit issued — Structural
B01139869-S1-ST
08/13/2025
Permit issued — General Construction
B01139869-I1-GC
08/12/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Admin
07/24/2025
Filed — Alteration
Existing building exterior brick wall opening at south facade. Structural work includes proposed steel lintel installation and brick wall partial demolition work
B01139869-P1
07/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/22/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
07/22/2025
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
05/16/2025
Permit issued — Mechanical Systems
B01139869-S2-MS
05/15/2025
Permit issued — General Construction
B01139869-I1-GC
05/15/2025
Permit issued — Structural
B01139869-S1-ST
05/01/2025
Objection resolved — Addressed
04/30/2025
Objection raised — Energy
04/28/2025
Objection resolved — Addressed
04/24/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/10/2025
Objection raised — Structural
04/10/2025
Objection raised — Structural
04/10/2025
Objection raised — Admin
04/10/2025
Objection raised — Admin
04/10/2025
Objection raised — Other
04/10/2025
Objection raised — Structural
04/08/2025
Objection raised — Scope
04/08/2025
Objection raised — Admin
04/08/2025
Objection raised — Fire_Protection
04/08/2025
Objection raised — Scope
04/01/2025
Filed — Alteration
Existing building exterior brick wall opening at south facade. Structural work includes proposed steel lintel installation and brick wall partial demolition work
B01139869-S2
04/01/2025
Filed — Alteration
Existing building exterior brick wall opening at south facade. Structural work includes proposed steel lintel installation and brick wall partial demolition work
B01139869-I1
04/01/2025
Filed — Alteration
Existing building exterior brick wall opening at south facade. Structural work includes proposed steel lintel installation and brick wall partial demolition work
B01139869-S1
03/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
03/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
11/25/2024
Violation issued (HPD, open)
I
11/08/2024
Special inspection requirement — Final
ERIC BERLENT
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2024
Signed off — Alteration CO
CONSTRUCTION FENCE IN CONJUNCTION WITH BUILDING RENOVATION
B00680529-S4
06/04/2024
Signed off — Alteration CO
CONSTRUCTION FENCE IN CONJUNCTION WITH BUILDING RENOVATION
B00680529-S1
05/28/2024
Special inspection requirement — Sprinkler Systems
Brian Bisram
05/27/2024
Filed — Alteration CO
CONSTRUCTION FENCE IN CONJUNCTION WITH BUILDING RENOVATION
B00680529-A4
05/09/2024
Objection raised — Zoning
05/01/2024
Objection raised — Zoning
05/01/2024
Objection raised — Fire_Protection
05/01/2024
Objection raised — Fire_Protection
05/01/2024
Objection raised — Zoning
04/30/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08033313-I1
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMarmol Radziner An Architects08/13/2025
DOB NOWStructuralSigned-offMarmol Radziner An Architects08/13/2025
DOB NOWGeneral ConstructionSigned-offMarmol Radziner An Architects08/13/2025
DOB NOWMechanical SystemsSigned-offMarmol Radziner An Architects05/16/2025
DOB NOWGeneral ConstructionSigned-offMarmol Radziner An Architects05/15/2025
DOB NOWStructuralSigned-offMarmol Radziner An Architects05/15/2025
DOB NOWFoundationSigned-offSteering House Construction08/25/2023
DOB NOWMechanical SystemsSigned-offSteering House Construction08/25/2023
DOB NOWSidewalk ShedSigned-offMC Superstructure07/26/2023
DOB NOWConstruction FenceSigned-offSteering House Construction07/26/2023
DOB NOWSidewalk ShedSigned-offMC Superstructure07/25/2023
DOB NOWPlumbingSigned-offStarlite Plumbing & Heating06/23/2023
DOB NOWEarth WorkSigned-offSteering House Construction06/15/2023
DOB NOWSprinklersSigned-offFirequest06/01/2023
DOB NOWGeneral ConstructionPermit IssuedSteering House Construction05/08/2023
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding03/08/2023
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding03/08/2023
DOB NOWFoundationSigned-offSteering House Construction08/25/2022
DOB NOWMechanical SystemsSigned-offSteering House Construction08/25/2022
DOB NOWGeneral ConstructionPermit IssuedSteering House Construction08/25/2022
DOB NOWConstruction FenceSigned-offSteering House Construction08/02/2022
DOB NOWSprinklersSigned-offFirequest06/29/2022
DOB NOWPlumbingSigned-offStarlite Plumbing & Heating06/28/2022
DOB NOWFoundationSigned-offSteering House Construction06/15/2022
BISFBISSUEDEast Coast Petroleum01/29/2014
BISPLISSUEDEast Coast Mechanical01/29/2014
BISOTISSUEDNA04/07/2000
1 project · most recent 05/27/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2024Signed-offSteering House ConstructionHeating and Air Conditioning Systems
Heat / Cool
Lg ARUM096BTE5 9 tons · Vrf Outdoor ×2
ARUM168BTE5 16 tons · Vrf Outdoor ×2
1 project · most recent 05/27/2024
Sprinkler System
FiledStatusContractorScope
05/27/2024Signed-offFirequestSprinkler System
1 project · most recent 05/27/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/27/2024Signed-offStarlite Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 05/03/2024
General Wiring
FiledStatusContractorScope
05/03/2024CompleteFSM ElectricalGeneral Wiring
11/07/2022CompleteNash Electric Services—
1 project · most recent 05/27/2024
Steel Masonry
FiledStatusContractorScope
05/27/2024Signed-offSteering House ConstructionSteel, Masonry
1 project · most recent 05/27/2024
Fence
FiledStatusContractorScope
05/27/2024Signed-offSteering House ConstructionFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/16/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/06/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
08/18/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
08/18/2025FinalSAMI HAJJAR P.Eprogress
08/18/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/22/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
07/22/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/22/2025FinalSAMI HAJJAR P.Eprogress
03/25/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/25/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/25/2025Fire-Resistance Rated ConstructionERIC BERLENTprogress
11/08/2024FinalERIC BERLENTprogress
05/28/2024Sprinkler SystemsBrian Bisramspecial
04/17/2024Fire-Resistance Rated ConstructionROBERT LITCHFIELDprogress
04/17/2024Structural Stability – Alterations of existing buildingsROBERT LITCHFIELDspecial
04/17/2024Fire-Resistant Penetrations and JointsROBERT LITCHFIELDspecial
03/08/2024Mechanical SystemsROBERT LITCHFIELDspecial
03/08/2024Structural Stability – Alterations of existing buildingsROBERT LITCHFIELDspecial
03/08/2024FinalROBERT LITCHFIELDprogress
03/08/2024Fire-Resistant Penetrations and JointsROBERT LITCHFIELDspecial
03/04/2024Mechanical SystemsROBERT LITCHFIELDspecial
03/04/2024Structural Stability – Alterations of existing buildings—special
03/04/2024Fire-Resistant Penetrations and JointsROBERT LITCHFIELDspecial
03/04/2024FinalROBERT LITCHFIELDprogress
02/27/2024Sprinkler SystemsBrian Bisramspecial
07/26/2023Fire-Resistant Penetrations and JointsROBERT LITCHFIELDspecial
07/26/2023Structural Stability – Alterations of existing buildingsROBERT LITCHFIELDspecial
Latest 25 of 72.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/27/2026B08033313-P1Request digital key ↗
08/27/2026B08033313-I1Request digital key ↗
08/25/2026B00680529-P3Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits27
▸DOB NOWLPC Approval/Permit20
08/22/2026B01139869-S1Open ↗
08/13/2026B01139869-I1Open ↗
08/13/2026B01139869-S2Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/02/2024340115422Open ↗
06/06/2024340115422Open ↗
05/30/2024340115422Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
01/28/2014340115422Open ↗
01/28/2014340115422Open ↗
01/28/2014340115422Open ↗
▸Seals & Professional Certifications74
▸DOB NOWSpecial Inspector Seal & Signature31
09/25/2026B01139869-S1Open ↗
09/25/2026B01139869-S1Open ↗
09/01/2026B00680529-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/27/2026B08033313-P1Open ↗
08/27/2026B08033313-I1Open ↗
08/25/2026B00680529-P4Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/25/2026B01139869-S1Open ↗
09/01/2026B00680529-I1Open ↗
08/29/2026B00680529-S5Open ↗
Showing 3 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/28/2014340115422Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/28/2014340115422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/28/2014340115422Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
01/28/2014340115422Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/28/2014340115422Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist8
08/13/2026B00680529-I1Open ↗
08/13/2026B00680529-P4Open ↗
08/13/2026B00680529-P6Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/25/2026B00680529-S6Open ↗
08/25/2026B00680529-I1Open ↗
08/25/2026B00680529-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026B01139869-S1Open ↗
08/13/2026B01139869-P1Open ↗
08/13/2026B01139869-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/28/2014340115422Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/28/2014340115422Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/28/2014340115422Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/28/2014340115422Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
01/28/2014340115422Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/28/2014340115422Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/28/2014340115422Open ↗
▸Other Documents25
▸DOB NOWDHCR Document11
08/22/2026B01139869-S1Open ↗
08/13/2026B00680529-A3Open ↗
08/13/2026B00680529-A3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProperty Ownership Certification8
08/25/2026B00680529-P3Open ↗
08/25/2026B00680529-P1Open ↗
08/25/2026B00680529-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026B01139869-I1Open ↗
08/13/2026B00680529-A3Open ↗
08/13/2026B00680529-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00680529-S4Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00680529-I1Open ↗