← Back
BuildNYC
Converted dwellings or rooming house
1 SLOSSON TERRACE
STATEN ISLAND · BIN 5000039
💬 Discuss this project
1900Year Built
2.5Stories
C5Building Class
C4-2Zoning
3,748 sfGross Floor Area
15Units
Rent Stabilized58 Active Violations 53 unresolved · 5 paperwork only ▸FDNY Report ↗
Converted dwellings or rooming house · Owner of record: CC Slosson 1-3 · 3,075 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInterior alteration and renovation of residences and storeUnder Construction1p · 1 filing · 13 docs
Floor 3Interior alteration and renovation of residences and storeUnder Construction4p · 2 filings · 14 docs
Floor 2Interior alteration and renovation of residences and storeUnder Construction4p · 2 filings · 14 docs
Floor 1Interior alteration and renovation of residences and storeUnder Construction5p · 2 filings · 14 docs
CellarInterior alteration and renovation of residences and storeUnder Construction2p · 2 filings · 14 docs
BasementInterior alteration and renovation of residences and storeUnder Construction1p · 1 filing · 13 docs
Sub-BasementInterior alteration and renovation of residences and storeUnder Construction2p · 1 filing · 13 docs
Site & exteriorSidewalk shedUnder Construction11p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CC Slosson 13-15203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC210/20/2026
Willy C. Yuin305/13/2026
Ashraf110/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sanark Consulting Engineering203/21/2026
KD Designs103/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold308/01/2026
Door to Door RealtyGeneral Contractor206/27/2026
Door to Door RealtyScaffold207/08/2026
Fine MechanicalPlumbing107/08/2026
Cape PlumbingPlumbing109/27/2011
Fire CommandFire Protection109/30/2011
N & L Decks R USGeneral Contractor105/30/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738201/26/2026
Building Lifecycle
10/20/2026
Filed — Alteration
Interior alteration & renovation of existing three-story residences.
S01256697-S4
09/14/2026
Signed off — Alteration
S01127108-I1
08/06/2026
Special inspection requirement — Mechanical Systems
08/06/2026
Special inspection requirement — Maintenance information
08/06/2026
Special inspection requirement — Ventilation and air distribution system
263 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offArsenal Scaffold07/31/2026
DOB NOWGeneral ConstructionPermit IssuedDoor to Door Realty06/24/2026
DOB NOWConstruction FencePermit IssuedDoor to Door Realty06/09/2026
DOB NOWConstruction FencePermit IssuedDoor to Door Realty06/05/2026
DOB NOWSidewalk ShedSigned-offArsenal Scaffold05/11/2026
DOB NOWPlumbingPermit IssuedFine Mechanical04/13/2026
DOB NOWGeneral ConstructionPermit IssuedDoor to Door Realty04/02/2026
DOB NOWSidewalk ShedSigned-offArsenal Scaffold10/17/2024
BISOTISSUEDN & L Decks R US05/30/2012
BISFPISSUEDFire Command09/30/2011
BISPLISSUEDCape Plumbing09/27/2011
1 project · most recent 10/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
10/20/2026Permit IssuedDoor to Door RealtyHeating and Air Conditioning Systems, Ventilation Systems
2 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026Permit IssuedStaten Island ElectricGeneral Wiring
10/17/2024CompleteNash Electric Services—
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/06/2026Mechanical Systems—special
08/06/2026Maintenance information—energy_progress
08/06/2026Ventilation and air distribution system—energy_progress
08/06/2026Shutoff dampers—energy_progress
08/06/2026HVAC-R and service water heating system controls—energy_progress
08/06/2026HVAC-R and service water piping design and insulation—energy_progress
08/06/2026HVAC-R and service water heating equipment—energy_progress
08/06/2026Final—progress
08/06/2026Energy Code Compliance Inspections—progress
01/29/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
01/29/2026Energy Code Compliance Inspectionsanthony santoroprogress
01/29/2026Maintenance informationanthony santoroenergy_progress
01/29/2026Permanent certificateanthony santoroenergy_progress
01/29/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/29/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/16/2025Finalanthony santoroprogress
07/16/2025Fire-Resistance Rated Constructionanthony santoroprogress
07/16/2025Energy Code Compliance Inspectionsanthony santoroprogress
07/16/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
07/16/2025Fenestration areasanthony santoroenergy_progress
07/16/2025Fenestration air leakageanthony santoroenergy_progress
07/16/2025Air barrier - visual inspectionanthony santoroenergy_progress
07/16/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
07/16/2025Insulation placement and R valuesanthony santoroenergy_progress
07/16/2025Maintenance informationanthony santoroenergy_progress
Latest 25 of 28.
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account