← Back
Five to six families
1 ST FRANCIS PLACE
BROOKLYN · BIN 3032149
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6BZoning
5,004 sfGross Floor Area
6Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Five to six families · Owner of record: 1 ST FRANCIS PLACE LLC · 1,901 sf lot · 2.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 31p · 1 filing · 7 docs
Floor 22p · 2 filings · 10 docs
Floor 13p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1 ST FRANCIS PLACE LLC103/22/2026
411 CLINTON STR HOLDINGS LLC603/22/2026
LEH1203/21/2026
PALMCO REAL ESTATE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/16/2024$2.8M—— → —$555/sf building
10/28/2022$2.4M—— → —$475/sf building
04/16/2015$1.9M—— → —$370/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RISE ARCHITECTURE NJ LLC202/13/2023
JESSICA BIRNBAUM108/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING203/21/2026
JACK JAFFA & ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BO7 CONSTRUCTION CORPGeneral Contractor303/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIZ DESIGNS LLC6312202/13/2023
Building Lifecycle
All (48)Filed (3)Permit Issued (2)Signed Off (2)Violation (31)Inspection (3)Special Inspection (7)
04/11/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
07/25/2023
Signed off — Alteration
INTERIOR RENOVATION OF LOBBY, HALLWAYS, AND APARTMENT 2L ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH
B00822196-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/2023
Signed off — Alteration
PLUMBING WORK AT APT 2L AS PER PLANS FILED HEREWITH
B00825413-I1
06/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2023
Violation issued (HPD, closed)
A
03/22/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/21/2023
Permit issued — Plumbing
B00825413-I1-PL
02/17/2023
Permit issued — General Construction
B00822196-I1-GC
02/13/2023
Filed — Alteration
INTERIOR RENOVATION OF LOBBY, HALLWAYS, AND APARTMENT 2L ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH
B00822196-I1
02/13/2023
Filed — Alteration
PLUMBING WORK AT APT 2L AS PER PLANS FILED HEREWITH
B00825413-I1
02/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
02/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
02/07/2023
Special inspection requirement — Insulation placement and R values
Jeff Akerman
02/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
02/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jeff Akerman
02/07/2023
Special inspection requirement — Lighting in dwelling units
Jeff Akerman
02/01/2023
Special inspection requirement — Final
SHIMON GREENEBAUM
02/09/2021
Violation issued (HPD, closed)
A
01/14/2020
Violation issued (ECB, closed)
Unknown
08/02/2019
Filed — Alteration
B00190538-I1
07/07/2019
Violation issued (HPD, closed)
C
07/07/2019
Violation issued (HPD, closed)
A
07/07/2019
Violation issued (HPD, closed)
B
07/07/2019
Violation issued (HPD, closed)
A
07/07/2019
Violation issued (HPD, closed)
A
07/07/2019
Violation issued (HPD, closed)
B
04/22/2019
Violation issued (HPD, closed)
C
04/22/2019
Violation issued (HPD, closed)
B
04/22/2019
Violation issued (HPD, closed)
A
12/22/2018
Violation issued (HPD, closed)
A
12/22/2018
Violation issued (HPD, closed)
C
12/22/2018
Violation issued (HPD, closed)
A
12/07/2015
Violation issued (HPD, closed)
C
12/07/2015
Violation issued (HPD, closed)
C
12/07/2015
Violation issued (HPD, closed)
C
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2015
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/2011
Violation issued (HPD, closed)
B
01/26/2007
Violation issued (HPD, closed)
C
01/26/2007
Violation issued (HPD, closed)
C
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/2001
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG02/21/2023
DOB NOWGeneral ConstructionSigned-offBO7 CONSTRUCTION CORP02/17/2023
BISPLISSUEDFINE MECHANICAL CORP07/25/2017
BISOTISSUEDGREEN ECHO STUDIO INC03/29/2017
BISPLISSUEDFINE MECHANICAL CORP12/14/2016
BISPLISSUEDFINE MECHANICAL CORP12/14/2016
BISOTISSUEDGREEN ECHO STUDIO INC09/21/2016
BISOTISSUEDGREEN ECHO STUDIO INC06/29/2016
1 project · most recent 03/07/2023
General Wiring
FiledStatusContractorScope
03/07/2023Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/07/2023Energy Code Compliance InspectionsJeff Akermanprogress
02/07/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
02/07/2023Insulation placement and R valuesJeff Akermanenergy_progress
02/07/2023Tenant Protection Plan ComplianceJeff Akermanspecial
02/07/2023Fire-Resistance Rated ConstructionJeff Akermanprogress
02/07/2023Lighting in dwelling unitsJeff Akermanenergy_progress
02/01/2023FinalSHIMON GREENEBAUMprogress
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/27/2026B00825413-I1Request digital key ↗
08/27/2026B00822196-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00190538-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION7
08/13/2019322008572Open ↗
03/27/2017321541818Open ↗
03/16/2017321541818Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION7
10/18/2019322008572Open ↗
07/26/2017321541818Open ↗
04/05/2017321541818Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/02/2017321409436Open ↗
▸DOB NOWState DEC Permit1
08/13/2026B00190538-I1Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
08/10/2017321541818Open ↗
04/21/2017321409436Open ↗
03/28/2017321454074Open ↗
Showing 3 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)3
09/21/2016321454074Open ↗
09/21/2016321454074Open ↗
09/21/2016321454074Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00825413-I1Open ↗
08/13/2026B00822196-I1Open ↗
08/13/2026B00190538-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B00822196-I1Open ↗
08/23/2026B00822196-I1Open ↗
08/23/2026B00822196-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/21/2016321454074Open ↗
07/01/2016321409436Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/01/2016321409436Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00822196-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
03/16/2017321541818Open ↗
03/08/2017321409436Open ↗
01/05/2017321454074Open ↗
Showing 3 of 5 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/01/2023322008572Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/01/2023322008572Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
03/16/2017321541818Open ↗
07/01/2016321409436Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00190538-I1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/13/2019322008572Open ↗
03/16/2017321541818Open ↗
09/21/2016321454074Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00190538-I1Open ↗
08/13/2026B00825413-I1Open ↗
08/13/2026B00822196-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
10/18/2019322008572Open ↗
08/13/2019322008572Open ↗
08/10/2017321541818Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/10/2017321541818Open ↗
04/21/2017321409436Open ↗
03/28/2017321454074Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/27/2023322008572Open ↗
▸BISLIGHTING CONTROLS1
01/27/2023322008572Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/23/2023322008572Open ↗
▸BISINTERIOR LIGHTING POWER1
01/27/2023322008572Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/31/2023322008572Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/27/2023322008572Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/23/2023322008572Open ↗
02/23/2023322008572Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/27/2023322008572Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/27/2023322008572Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/24/2023322008572Open ↗
08/10/2017321541818Open ↗
08/10/2017321541818Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/21/2017321409436Open ↗
▸BISFINAL1
01/27/2023322008572Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
02/23/2023322008572Open ↗
08/13/2019322008572Open ↗
08/10/2017321541818Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/27/2023322008572Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
08/13/2019322008572Open ↗
03/16/2017321541818Open ↗
09/21/2016321454074Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
03/08/2017321409436Open ↗
▸Other Documents1
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
08/13/2019322008572Open ↗