← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1 ST PAULS COURT
BROOKLYN · BIN 3116538
💬 Discuss this project
1931Year Built
6Stories
D1Building Class
R7AZoning
91,770 sfGross Floor Area
65Units
LL97 CoveredRent Stabilized173 Active Violations 172 unresolved · 1 paperwork only 1 likely answered ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Parkside Equities · 21,316 sf lot · 4.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofShamco Management2p · 1 filing · 11 docs
Floor 6Shamco Management5p · 1 filing · 2 docs
Floor 5Shamco Management5p · 1 filing · 2 docs
Floor 4Shamco Management5p · 1 filing · 2 docs
Floor 3Shamco Management5p · 1 filing · 2 docs
Floor 2Shamco Management5p · 1 filing · 2 docs
Floor 1Shamco Management5p · 1 filing · 2 docs
CellarShamco Management CORP.12p · 2 filings · 14 docs
Site & exteriorShamco Management18p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Skyline NYC603/21/2026
Parkside Equities103/22/2026
Phoenix103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Perdek, Professional Engineering210/26/2021
Asif Jamil, RA110/14/2021
WRG Engineering105/18/2021
Bazini Engineering304/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
AE Design Solution403/21/2026
NYC Department of Design and Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.V.S. Contracting GroupScaffold403/21/2026
J.V.S. Contracting GroupGeneral Contractor307/08/2026
Right Way Electrical ContractingElectrical103/21/2026
Optimal ElectricElectrical103/21/2026
Powers Bridging & ScaffoldingScaffold107/08/2026
Alafogiannis Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG Engineering4403105/18/2021
Building Lifecycle
07/15/2026
Elevator Category 1 inspection report filed
06/09/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd…
HPD violation · open
06/09/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL NORTH WALL IN THE BATHROOM LOCATED AT APT 2B,…
HPD violation · open
06/09/2026
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR…
HPD violation · closed
06/09/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
214 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offJ.V.S. Contracting Group06/07/2022
DOB NOWGeneral ConstructionSigned-offJ.V.S. Contracting Group06/07/2022
DOB NOWSupported ScaffoldSigned-offJ.V.S. Contracting Group10/14/2021
DOB NOWGeneral ConstructionSigned-offJ.V.S. Contracting Group08/24/2021
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol08/19/2021
DOB NOWPlumbingPermit IssuedAlafogiannis Plumbing & Heating09/24/2020
DOB NOWBoiler EquipmentSigned-offRB Heating Consulting Group09/01/2020
BISPLISSUEDHenry Myers P & H03/25/2013
BISEQISSUEDS S Bridging & Scaffoldin05/10/2012
BISOTISSUEDHenry Myers Plumbing & H12/07/2011
BISPLISSUEDHenry Myers P & H12/07/2011
BISFSISSUEDMmi Mechanical01/30/2007
1 project · most recent 08/08/2021
FiledStatusContractorScope
08/08/2021CompleteOptimal Electric—
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/27/2021FinalPaul Perdekprogress
06/22/2021Structural Stability – Alterations of existing buildingsWinston Garciaspecial
05/05/2021Air barrier - visual inspectionWinston Garciaenergy_progress
05/05/2021MasonryWinston Garciaspecial
05/05/2021Insulation placement and R valuesWinston Garciaenergy_progress
05/05/2021Energy Code Compliance InspectionsWinston Garciaprogress
04/16/2021HVAC and service water heating equipment Joseph Bazinienergy_progress
04/07/2021FinalWinston Garciaprogress
04/07/2021HVAC and service water heating equipment Joseph Bazinienergy_progress
65 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account