← Back
Elevator apt, fireproof with stores
1 UNIVERSITY PLACE
MANHATTAN · BIN 1008832
💬 Discuss this project
1930Year Built
21Stories
D6Building Class
R7-2Zoning
218,985 sfGross Floor Area
270Units
LL97 CoveredRent Stabilized55 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: PIK RECORD L.L.C. · 12,527 sf lot · 17.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof3p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1807/08/2026
ROCK GROUP NY1507/08/2026
PLK RECORD CO203/22/2026
BULADO GENERAL CONTRACTOR303/22/2026
GENERAL CONTRACTOR BULADO103/22/2026
PILC RECORD CO103/22/2026
OWNER OF 27-31 WAVERLY103/22/2026
PILE RECORDS CO103/22/2026
UNIVERSITY PL OWNERS103/22/2026
IN WINDOW OUTDOOR LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILD ARCHITECTURE103/06/2025
BIORDI ENGINEERING CONSULTING D.P.C105/14/2024
ASHRAF CORP611/14/2023
ASIF JAMIL, RA101/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PWF103/21/2026
PLATINUM SERVICES NY1203/21/2026
HS DESIGN STUDIO203/21/2026
E-Z PERMIT NY403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor1607/08/2026
ROCK GROUP NY CORPGeneral Contractor407/08/2026
ACO-DEL GROUP COMPANY INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LOUPE INSPECTIONS9555103/06/2025
Building Lifecycle
All (113)Filed (11)Permit Issued (14)Signed Off (5)Facade (FISP) (17)Violation (60)Objection (4)Special Inspection (2)
08/03/2026
Violation issued (HPD, open)
C
08/03/2026
Violation issued (HPD, open)
A
08/03/2026
Violation issued (HPD, open)
A
08/03/2026
Violation issued (HPD, open)
A
07/25/2026
Violation issued (HPD, open)
B
07/25/2026
Violation issued (HPD, closed)
C
07/25/2026
Violation issued (HPD, closed)
C
07/25/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (HPD, open)
A
06/30/2026
Violation issued (HPD, open)
A
06/30/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, closed)
C
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/21/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, open)
B
06/05/2026
Violation issued (HPD, open)
C
06/04/2026
Violation issued (HPD, open)
B
06/04/2026
Violation issued (HPD, open)
B
06/04/2026
Violation issued (HPD, closed)
C
06/04/2026
Violation issued (HPD, open)
B
06/04/2026
Violation issued (HPD, closed)
B
06/04/2026
Violation issued (HPD, closed)
C
06/04/2026
Violation issued (HPD, open)
B
06/04/2026
Violation issued (HPD, closed)
B
01/26/2026
Permit issued — Suspended Scaffold
M01348243-I1-SC
01/19/2026
Filed — Alteration
M01348243-I1
12/09/2025
Violation issued (FDNY_NOV, closed)
06/02/2025
Signed off — Alteration
Application for interior renovation to combine units 15A and 15B on the fifteenth floor of a twenty one story multi family mixed use building as per TPPN #3/97. No change in use, bulk or egress.
M01185441-I1
05/30/2025
Permit issued — General Construction
M01185441-I1-GC
03/13/2025
Objection raised — Other
03/13/2025
Objection resolved — Addressed
03/06/2025
Filed — Alteration
Application for interior renovation to combine units 15A and 15B on the fifteenth floor of a twenty one story multi family mixed use building as per TPPN #3/97. No change in use, bulk or egress.
M01185441-I1
02/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH WASSERMAN
02/24/2025
Special inspection requirement — Final
JOSEPH WASSERMAN
02/21/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AND ROOF PROTECTION AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00493027-I1
02/21/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00298610-I1
12/10/2024
Signed off — Alteration
FACADE RESTORATION, INSPECTIONS
M00967593-I1
10/03/2024
Violation issued (HPD, closed)
C
10/03/2024
Violation issued (HPD, closed)
B
10/03/2024
Violation issued (HPD, closed)
C
10/03/2024
Violation issued (HPD, closed)
B
08/07/2024
Cycle 9 facade report submitted
08/07/2024
Cycle 9 facade inspection completed
08/07/2024
Cycle 9 facade report signed — SAFE
06/27/2024
Signed off — Alteration
FACADE RESTORATION, INSPECTIONS
M01048676-I1
06/05/2024
Permit issued — Suspended Scaffold
M01048676-I1-SC
05/23/2024
Objection resolved — Addressed
05/22/2024
Objection raised — Other
05/14/2024
Filed — Alteration
FACADE RESTORATION, INSPECTIONS
M01048676-I1
05/08/2024
Violation issued (ECB, closed)
Construction
05/08/2024
Violation issued (ECB, closed)
Construction
05/08/2024
Violation issued (ECB, closed)
Construction
02/26/2024
Permit issued — Supported Scaffold
M00493027-I1-SF
02/26/2024
Permit issued — Sidewalk Shed
M00298610-I1-SH
02/07/2024
Violation issued (HPD, closed)
A
02/07/2024
Violation issued (HPD, closed)
B
02/04/2024
Violation issued (HPD, closed)
A
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT01/26/2026
DOB NOWGeneral ConstructionSigned-offACO-DEL GROUP COMPANY INC05/30/2025
DOB NOWSuspended ScaffoldSigned-offBULADO GENERAL CONTR CORP06/05/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC02/26/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/26/2024
DOB NOWSuspended ScaffoldSigned-offBULADO GENERAL CONTR CORP12/19/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/03/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC03/03/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC03/11/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/11/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/29/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC03/26/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/29/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP01/24/2020
BISOTISSUEDBULADO GENERAL CONTRACTOR05/29/2024
BISOTISSUEDBULADO GENERAL CONTRACTOR05/25/2023
BISOTISSUEDBULADO GENERAL CONTRACTOR06/16/2022
BISOTISSUEDBULADO GENERAL CONTRACTOR07/08/2021
BISFPISSUEDNY FIRETECH INC04/09/2019
BISPLISSUEDPOWER PLUMBING & HEATING01/03/2019
BISOTISSUEDBEAUTIFUL CONSULTING01/02/2019
BISEQISSUEDELISE CORP03/15/2018
BISOTISSUEDELISE CORP03/15/2018
BISEQISSUEDBULADO GENERAL CONTRACTOR10/31/2016
BISOTISSUEDBULADO GENERAL CONTRACTOR10/11/2016
BISEQISSUEDROCK GROUP NY CORP05/27/2016
BISPLISSUEDBELL FUEL OIL, LLC11/12/2015
BISOTISSUEDUNITECH DESIGN INC10/21/2015
BISPLISSUEDBELL FUEL OIL, LLC11/07/2014
BISFBISSUEDABILENE, INC11/07/2014
BISPLISSUEDSTIVAN PLBG & HTG INC05/20/2014
BISOTISSUEDFULL SERVICE CONTRACTING04/18/2014
BISEQISSUEDFULL SERVICE CONTRACTING04/18/2014
BISFPISSUEDNY FIRE LLC08/07/2013
BISOTISSUEDSIGN MASTER USA INC07/18/2013
BISPLISSUEDPLUMBING & HTG DOCTOR INC07/01/2013
BISPLISSUEDTOP DOG PLBG & HTG CORP06/27/2013
BISOTISSUEDPLUS K CONSTRUCTION INC06/25/2013
BISEQISSUEDPLUS K CONSTRUCTION INC06/25/2013
BISEQISSUEDTAN DEVELOPMENT, LLC06/14/2013
+ 24 more permits on file
3 projects · most recent 04/05/2022
General Wiring
FiledStatusContractorScope
04/05/2022Permit IssuedROBERT CHIMENTI7 meters, 1 new_meters
01/16/2020Permit IssuedILLUMINOUS ELECTRIC CORP.—
02/03/2019Permit IssuedIRWIN ELECTR'L CONTR'S, IGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/24/2025Tenant Protection Plan ComplianceJOSEPH WASSERMANspecial
02/24/2025FinalJOSEPH WASSERMANprogress
▾Documents — 354 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/28/2026M00493027-P4Request digital key ↗
08/28/2026M00493027-P3Request digital key ↗
08/28/2026M00493027-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00298610-I1Request digital key ↗
▸Applications & Permits73
▸BISWORK PERMIT APPLICATION39
05/21/2021123921186Open ↗
04/10/2019123716915Open ↗
01/03/2019123398545Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION34
09/06/2024123921186Open ↗
12/12/2022123921186Open ↗
08/02/2022123921186Open ↗
Showing 3 of 34 on file for this type
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
07/30/2019123398545Open ↗
07/30/2019123398545Open ↗
12/31/2018123398545Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
04/01/2019123716915Open ↗
12/31/2018123398545Open ↗
11/04/2016122904875Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
06/04/2021141002741Open ↗
04/29/2021141000743Open ↗
04/01/2019123716915Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026M00493027-P4Open ↗
08/28/2026M00493027-P3Open ↗
08/28/2026M00493027-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
06/04/2021141002741Open ↗
04/29/2021141000743Open ↗
08/28/2016140533723Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/04/2021141002741Open ↗
04/29/2021141000743Open ↗
08/28/2016140533723Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026M01185441-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026M01185441-I1Open ↗
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING10
11/06/2014140277607Open ↗
Showing 1 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
12/21/2015140277607Open ↗
07/17/2015140277607Open ↗
07/17/2014121499574Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
07/17/2019123398545Open ↗
07/16/2019123398545Open ↗
06/17/2019123398545Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
06/03/2019123716915Open ↗
04/29/2019123716915Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/16/2015140277607Open ↗
11/06/2014140277607Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes6
06/10/2020123921186Open ↗
04/01/2019123716915Open ↗
12/28/2018123398545Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00298610-I1Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
06/10/2020123921186Open ↗
04/01/2019123716915Open ↗
12/31/2018123398545Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/06/2014140277607Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026M01185441-I1Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
07/30/2019123398545Open ↗
07/30/2019123398545Open ↗
03/29/2018121689921Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/30/2019123398545Open ↗
03/29/2018121689921Open ↗
05/11/2017122824603Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/10/2020123921186Open ↗
11/06/2014140277607Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/12/2024123921186Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/12/2024123921186Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/06/2014140277607Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
09/12/2024123921186Open ↗
02/13/2023123921186Open ↗
08/01/2022123921186Open ↗
Showing 3 of 7 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
09/12/2024123921186Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
09/12/2024123921186Open ↗
07/30/2019123398545Open ↗
06/03/2019123716915Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/15/2018121689921Open ↗
05/15/2018121689921Open ↗
09/20/2017122904875Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER3
04/09/2018121689921Open ↗
04/09/2018121689921Open ↗
04/09/2018121689921Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT31
09/09/2024123921186Open ↗
01/13/2023123921186Open ↗
11/30/2022123921186Open ↗
Showing 3 of 31 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/12/2024123921186Open ↗
▸Filing & Intake Forms38
▸BISEFILING COVER SHEET14
05/29/2020123921186Open ↗
04/01/2019123716915Open ↗
12/31/2018123398545Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION10
09/11/2024123921186Open ↗
01/18/2023123921186Open ↗
01/18/2023123921186Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
06/04/2021141002741Open ↗
04/29/2021141000743Open ↗
08/28/2016140533723Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
07/30/2019123398545Open ↗
07/16/2019123398545Open ↗
06/12/2019123398545Open ↗
Showing 3 of 6 on file for this type
▸Other Documents7
▸DOB NOWCalculations2
08/13/2026M00967593-I1Open ↗
08/13/2026M01048676-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M00967593-I1Open ↗
08/13/2026M01048676-I1Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
05/26/2016140496602Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/15/2018121689921Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01348243-I1Open ↗