← Back
BuildNYC
Other college and university
Long Island Univ-Brooklyn Campus
1 UNIVERSITY PLAZA · Fort Greene · BIN 3338885
💬 Discuss this project
1929Year Built
15Stories
W6Building Class
R6Zoning
579,404 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized34 Active Violations 18 unresolved · 16 paperwork only 3 likely answered 3 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Other college and university · 209,139 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLong Island University6p · 2 filings · 7 docs
Floor 1Long Island University1 filing · 3 docs
Site & exteriorLong Island University, Live Nation17p · 5 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIU203/21/2026
NYC Department of Housing Preservation and Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC Engineering112/27/2023
Ospino Engineering112/18/2023
Vitruvian GC212/08/2023
Wellworth Consulting108/28/2023
Marcy111/21/2022
Grant101/24/2022
Desimone Consulting Engineering108/09/2021
Patuxent Engineering110/29/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services103/21/2026
Patuxent Engineering203/21/2026
JP Expedite203/21/2026
All in Permit Consultants203/21/2026
United Safety Consultants103/21/2026
Hierarch-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Watch Hill Wireless SoluGeneral Contractor303/21/2026
National MaintenanceSign hanger207/08/2026
Meo ElectricElectrical103/21/2026
Proff ElectricalElectrical103/22/2026
R.C.M. ElectricElectrical103/21/2026
Call Electric CoElectrical103/21/2026
CKC Contracting Corp DbaElectrical103/21/2026
Signs Cadspecialty_contractor103/21/2026
Manhattan D EnterprisesScaffold107/08/2026
Spring ScaffoldingScaffold107/08/2026
Donnelly Mechanicalspecialty_contractor107/08/2026
Accu-Glo Electric of N.y.incElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Beyond Arch3600112/27/2023
Projective6820312/08/2023
J Stone Acquisitions8153111/21/2022
Grant Engineering Consulting3512101/24/2022
Building Lifecycle
All (104)Filed (9)Permit Issued (8)Signed Off (5)Facade (FISP) (9)Violation (60)Special Inspection (13)
03/25/2026
Violation issued (FDNY_ORDER, closed)
03/25/2026
Violation issued (FDNY_ORDER, closed)
03/25/2026
Violation issued (FDNY_ORDER, closed)
03/17/2026
Violation issued (FDNY_ORDER, closed)
04/08/2025
Violation issued (FDNY_ORDER, closed)
04/07/2025
Violation issued (FDNY_NOV, closed)
04/07/2025
Violation issued (FDNY_NOV, closed)
03/26/2025
Violation issued (FDNY_ORDER, closed)
03/19/2025
Violation issued (FDNY_ORDER, closed)
03/19/2025
Violation issued (FDNY_ORDER, closed)
03/19/2025
Violation issued (FDNY_ORDER, closed)
03/19/2025
Violation issued (FDNY_ORDER, closed)
04/12/2024
Signed off — Alteration
B00894013-I1
02/26/2024
Violation issued (FDNY_ORDER, closed)
02/26/2024
Violation issued (FDNY_ORDER, closed)
02/26/2024
Violation issued (FDNY_ORDER, closed)
02/26/2024
Violation issued (FDNY_ORDER, closed)
02/26/2024
Violation issued (FDNY_ORDER, closed)
02/26/2024
Violation issued (FDNY_ORDER, closed)
02/26/2024
Violation issued (FDNY_ORDER, closed)
01/16/2024
Permit issued — Sign
B00949341-I1-SG
12/29/2023
Permit issued — Structural
B00894013-I1-ST
12/27/2023
Filed — Alteration
B00894013-I1
12/27/2023
Special inspection requirement — Designated Seismic System
Hackjong Choi
12/20/2023
Permit issued — Suspended Scaffold
B00973026-I1-SC
12/18/2023
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
B00973026-I1
12/13/2023
Permit issued — Sign
B00953586-I1-SG
12/08/2023
Filed — Alteration
ERECT STATIC WALL SIGNS ON EXISTING MARQUEE. SIGNAGE ACCESSORY TO LIU/PARAMOUNT/LIVE NATION.
B00953586-I1
11/20/2023
Filed — Alteration
Erect LED Readerboards with changeable copy on existing marquee. Signs are accessory to LIU/Paramount Theatre.
B00949341-I1
10/31/2023
Special inspection requirement — Structural Steel - Details
JUSTIN REDMOND
10/31/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JUSTIN REDMOND
10/31/2023
Special inspection requirement — Structural Steel - Welding
JUSTIN REDMOND
10/31/2023
Special inspection requirement — Final
Ksenia Tretiakova
10/25/2023
Special inspection requirement — Structural Steel - Details
JUSTIN REDMOND
10/25/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JUSTIN REDMOND
10/25/2023
Special inspection requirement — Structural Steel - Welding
JUSTIN REDMOND
10/25/2023
Special inspection requirement — Final
Ksenia Tretiakova
09/20/2023
Signed off — Alteration
B00925664-I1
08/28/2023
Filed — Alteration
B00925664-I1
08/28/2023
Permit issued — Supported Scaffold
B00925664-I1-SF
06/21/2023
Special inspection requirement — Post-installed Anchors
Hackjong Choi
06/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Hackjong Choi
06/21/2023
Special inspection requirement — Final
ADITYA DESAI
02/01/2023
Violation issued (ECB, open)
Local Law
12/20/2022
Signed off — Alteration
Single chiller replacement on roof.
B08025313-I1
11/26/2022
Permit issued — Mechanical Systems
B08025313-I1-MS
11/21/2022
Filed — Alteration
Single chiller replacement on roof.
B08025313-I1
09/26/2022
Signed off — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Initial installation approved under application #301836627
B00609758-I1
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/28/2022
Permit issued — Antenna
B00609758-I1-AN
01/24/2022
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Initial installation approved under application #301836627
B00609758-I1
01/03/2022
Signed off — Alteration
INSTALLATION OF SCAFFOLD FOR WORKER ACCESS DURING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00419475-I1
08/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/09/2021
Filed — Alteration
B00557133-I1
10/30/2020
Permit issued — Supported Scaffold
B00419475-I1-SF
10/29/2020
Filed — Alteration
INSTALLATION OF SCAFFOLD FOR WORKER ACCESS DURING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00419475-I1
10/26/2020
Special inspection requirement — Final
JOHN O'CONNOR, P.E.
07/31/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/31/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/31/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedNational Maintenance01/16/2024
DOB NOWStructuralPermit IssuedSigns Cad12/29/2023
DOB NOWSuspended ScaffoldPermit IssuedC.C.C. Renovation12/20/2023
DOB NOWSignPermit IssuedNational Maintenance12/13/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding08/28/2023
DOB NOWMechanical SystemsPermit IssuedDonnelly Mechanical11/26/2022
DOB NOWAntennaSigned-offWatch Hill Wireless Solu01/28/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises10/30/2020
BISOTISSUEDTerra Nova Restoration Co09/11/2018
BISOTISSUEDTerra Nova Restoration Co05/18/2018
BISOTISSUEDShaker Contractors09/11/2017
BISEQISSUEDTriera Contracting08/10/2017
BISEQISSUEDRock Scaffolding04/06/2012
BISOTISSUEDCentral Construction Management09/23/2011
BISEQISSUEDRock Scaffolding08/02/2011
BISMHISSUEDP.I. Mechanical03/31/2011
BISOTISSUEDAce Rental03/25/2011
BISEQISSUEDOutdoor Installations02/11/2011
BISOTISSUEDAce Rental04/07/2010
BISPLISSUEDReliable Plumbing & Heating07/28/2009
BISOTISSUEDMercury National Construction07/20/2009
BISEQISSUEDOutdoor Installations07/09/2009
BISOTISSUEDAce Rental05/01/2009
BISFPISSUEDActive Fire Exiting Co04/24/2008
BISEQISSUEDOutdoor Installations03/26/2008
BISFPISSUEDReliable Fire Protection12/03/2007
BISOTISSUEDAce Rental04/27/2007
BISOTISSUEDH.M. Hughes Co04/20/2007
BISMHISSUEDH.M. Hughes Co04/20/2007
BISOTISSUEDH.M. Hughes Co04/20/2007
BISOTISSUEDBci Communications10/13/2005
BISOTISSUEDVertical Solutions10/26/2004
BISEQISSUEDPheonix Bridging08/02/2004
BISOTISSUEDKordun Construction07/20/2004
BISEQISSUEDPhoenix Bridging03/19/2004
BISPLISSUEDCK Plumbing & Mechanical09/04/2003
BISPLISSUEDNYC Water Main Works06/25/2003
BISSPISSUEDCode Fire Protection04/24/2003
BIS—ISSUEDH.M. Hughes Co03/20/2003
BISPLISSUEDCardoza02/12/2003
+ 18 more permits on file
9 projects · most recent 03/06/2024
General Wiring
FiledStatusContractorScope
03/06/2024Permit IssuedProff ElectricalGeneral Wiring
03/06/2024Permit IssuedProff Electrical—
03/06/2024Permit IssuedProff Electrical—
03/06/2024Permit IssuedProff Electrical—
03/06/2024Permit IssuedProff Electrical—
03/06/2024Permit IssuedProff Electrical—
03/06/2024Permit IssuedProff Electrical—
03/06/2024Permit IssuedProff Electrical—
03/06/2024Permit IssuedProff Electrical—
1 project · most recent 12/18/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/18/2023Permit IssuedC.C.C. RenovationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
12/27/2023Designated Seismic SystemHackjong Choispecial
10/31/2023Structural Steel - DetailsJUSTIN REDMONDspecial
10/31/2023Structural Steel - High Strength BoltingJUSTIN REDMONDspecial
10/31/2023Structural Steel - WeldingJUSTIN REDMONDspecial
10/31/2023FinalKsenia Tretiakovaprogress
10/25/2023Structural Steel - DetailsJUSTIN REDMONDspecial
10/25/2023Structural Steel - High Strength BoltingJUSTIN REDMONDspecial
10/25/2023Structural Steel - WeldingJUSTIN REDMONDspecial
10/25/2023FinalKsenia Tretiakovaprogress
06/21/2023Post-installed AnchorsHackjong Choispecial
06/21/2023Structural Steel - High Strength BoltingHackjong Choispecial
06/21/2023FinalADITYA DESAIprogress
10/26/2020FinalJOHN O'CONNOR, P.E.progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Live NationArts / Culture / Entertainment—
Project B00894013 Alteration · LOC Issued · 12/27/2023
Long Island UniversityEducationFloor 1, Roof
Project B00973026 Alteration · Permit Entire · 12/18/2023
Project B00953586 Alteration · Permit Entire · 12/08/2023
Project B00949341 Alteration · Permit Entire · 11/20/2023
Project B00925664 Alteration · LOC Issued · 08/28/2023
Project B08025313 Alteration · LOC Issued · 11/21/2022
Project B00609758 Alteration · LOC Issued · 01/24/2022
Project B00557133 Alteration · QA Failed · 08/09/2021
Project B00419475 Alteration · LOC Issued · 10/29/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/01/2026B00557133-I1Request digital key ↗
08/31/2026B00609758-I1Request digital key ↗
08/28/2026B08025313-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00419475-I1Request digital key ↗
▸Applications & Permits37
▸BISWORK PERMIT APPLICATION20
09/12/2018321618157Open ↗
05/21/2018321618157Open ↗
09/18/2017321618157Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
08/09/2017340531650Open ↗
07/10/2017321618157Open ↗
08/04/2011320343525Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications64
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
12/26/2018321618157Open ↗
12/26/2018321618157Open ↗
12/26/2018321618157Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00419475-I1Open ↗
09/01/2026B00557133-I1Open ↗
08/26/2026B00925664-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00953586-I1Open ↗
09/01/2026B00953586-I1Open ↗
09/01/2026B00953586-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
08/04/2011320343525Open ↗
04/01/2011320290564Open ↗
02/14/2011320272272Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
08/04/2011320343525Open ↗
04/01/2011320290564Open ↗
02/14/2011320272272Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00953586-I1Open ↗
08/27/2026B00419475-I1Open ↗
08/26/2026B00949341-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/09/2017340531650Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/09/2017340531650Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/09/2017340531650Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/16/2011320290564Open ↗
07/20/2009320048970Open ↗
▸BISSCHEDULE B - PLUMBING2
07/20/2009320048970Open ↗
11/20/2007310053198Open ↗
▸BISEQUIPMENT USE PERMITS1
06/16/2011320290564Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/25/2009320048970Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
07/21/2017321618157Open ↗
08/09/2017340531650Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
02/14/2011320272272Open ↗
04/06/2010320146864Open ↗
07/09/2009320048480Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
04/01/2011320290564Open ↗
06/22/2010320175644Open ↗
07/20/2009320048970Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00557133-I1Open ↗
08/13/2026B08025313-I1Open ↗
08/13/2026B00609758-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/16/2017321618157Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/26/2018321618157Open ↗
08/16/2017321618157Open ↗
12/11/2012320341769Open ↗
▸BISTECHNICAL REPORT: ENERGY3
08/03/2011320341769Open ↗
06/16/2011320290564Open ↗
04/01/2011320290564Open ↗
▸BISEN2 - As Built Energy Analysis2
12/11/2012320341769Open ↗
12/26/2018321618157Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08025313-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00609758-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/09/2017340531650Open ↗
▸Approvals, Objections & Sign-offs24
▸BISADMINISTRATIVE OBJECTIONS13
08/04/2011320343525Open ↗
08/03/2011320341769Open ↗
04/01/2011320290564Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/26/2018321618157Open ↗
01/28/2013320341769Open ↗
09/30/2011320272272Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/01/2026B00557133-I1Open ↗
08/13/2026B00949341-I1Open ↗
08/13/2026B00973026-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/16/2011320290564Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
12/26/2018321618157Open ↗
08/16/2017321618157Open ↗
12/11/2012320341769Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET12
07/10/2017321618157Open ↗
08/04/2011320343525Open ↗
08/03/2011320341769Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/09/2017340531650Open ↗
▸BISBOROUGH INTAKE FORM1
12/26/2018321618157Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B00973026-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B00973026-I1Open ↗