← Back
Parks / recreation facility
1 WARDS ISLAND
MANHATTAN · BIN 1088446
💬 Discuss this project
0Year Built
1Stories
Q1Building Class
PARKZoning
948 sfGross Floor Area
1Units
202 Open Violations 2 unresolved · 200 paperwork only ▸
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 12,300,030 sf lot · 0 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DXA STUDIO812/20/2024
CORNERSTONE ENGINEERS & ARCHITECTUR109/01/2023
RAAD108/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GARNER ENVIRONMENTAL SERVGeneral Contractor1207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAAD7727108/31/2023
Building Lifecycle
All (31)Filed (10)Permit Issued (6)Signed Off (2)Inspection (1)Objection (10)Special Inspection (2)
06/04/2025
Signed off — Alteration
A TEMPORARY PER-MANUFACTURED TENT MEMBRANE STRUCTURE WILL BE INSTALLED AT THE LOCATION SHOWN ON THE SITE PLAN. THE TEMPORARY STRUCTURE IS PER REQUEST OF THE NYC OFFICE OF EMERGENCY MANAGEMENT AND NYC HEALTH & HOSPITALS.
M00925610-I1
06/03/2025
Signed off — Alteration
INSTALLATION OF HVAC SYSTEMS FOR EMERGENCY SHELTER AT 50 EAST RIVER LANE
M00924667-I1
05/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/20/2024
Filed — No Work
M01158274-I1
09/23/2024
Filed — No Work
M01108488-I1
06/26/2024
Permit issued — General Construction
M00925610-I1-GC
06/26/2024
Permit issued — Mechanical Systems
M00924667-I1-MS
06/26/2024
Permit issued — Structural
M00925700-I1-ST
06/21/2024
Filed — No Work
M01069845-I1
05/29/2024
Filed — Alteration
A TEMPORARY PER-MANUFACTURED TENT MEMBRANE STRUCTURE WILL BE INSTALLED AT THE LOCATION SHOWN ON THE SITE PLAN. THE TEMPORARY STRUCTURE IS PER REQUEST OF THE NYC OFFICE OF EMERGENCY MANAGEMENT AND NYC HEALTH & HOSPITALS.
M00925610-P1
03/21/2024
Filed — No Work
M01022648-I1
12/12/2023
Filed — No Work
M00974452-I1
09/28/2023
Objection resolved — Addressed
09/27/2023
Objection raised — Other
09/27/2023
Objection resolved — Addressed
09/27/2023
Objection raised — Admin
09/26/2023
Filed — No Work
M00927361-I1
09/20/2023
Permit issued — Mechanical Systems
M00924667-I1-MS
09/20/2023
Permit issued — Structural
M00925700-I1-ST
09/19/2023
Permit issued — General Construction
M00925610-I1-GC
09/08/2023
Objection resolved — Addressed
09/07/2023
Objection resolved — Addressed
09/06/2023
Objection raised — Admin
09/06/2023
Objection raised — Other
09/06/2023
Objection resolved — Addressed
09/06/2023
Objection raised — Other
09/01/2023
Filed — Alteration
A TEMPORARY PER-MANUFACTURED TENT MEMBRANE STRUCTURE WILL BE INSTALLED AT THE LOCATION SHOWN ON THE SITE PLAN. THE TEMPORARY STRUCTURE IS PER REQUEST OF THE NYC OFFICE OF EMERGENCY MANAGEMENT AND NYC HEALTH & HOSPITALS.
M00925610-I1
09/01/2023
Filed — Alteration
M00925700-I1
08/31/2023
Filed — Alteration
INSTALLATION OF HVAC SYSTEMS FOR EMERGENCY SHELTER AT 50 EAST RIVER LANE
M00924667-I1
08/24/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
08/24/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGARNER ENVIRONMENTAL SERV06/26/2024
DOB NOWMechanical SystemsSigned-offGARNER ENVIRONMENTAL SERV06/26/2024
DOB NOWStructuralPermit IssuedGARNER ENVIRONMENTAL SERV06/26/2024
DOB NOWMechanical SystemsSigned-offGARNER ENVIRONMENTAL SERV09/20/2023
DOB NOWStructuralPermit IssuedGARNER ENVIRONMENTAL SERV09/20/2023
DOB NOWGeneral ConstructionSigned-offGARNER ENVIRONMENTAL SERV09/19/2023
1 project · most recent 08/21/2023
FiledStatusContractorScope
08/21/2023Permit IssuedALL-STAR ELEC'L SERVICES—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/24/2023Mechanical SystemsNICHOLAS AZADIANspecial
08/24/2023FinalNICHOLAS AZADIANprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hercc Relief CenterOther—
Project M00925700 Alteration · Permit Entire · 09/01/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Temporary Place of Assembly6
08/28/2026M00974452-I1Request digital key ↗
08/27/2026M01022648-I1Request digital key ↗
08/27/2026M01069845-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch4
08/29/2026M00924667-I1Request digital key ↗
08/29/2026M00925700-I1Request digital key ↗
08/27/2026M00925610-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026M00924667-I1Open ↗
08/29/2026M00925700-I1Open ↗
08/28/2026M00974452-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026M00924667-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026M00924667-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/29/2026M00925700-I1Open ↗
08/27/2026M01022648-I1Open ↗
08/27/2026M01069845-I1Open ↗
Showing 3 of 10 on file for this type