BuildNYC
Dormitory
Washington Square CoGen Campus
1 WASHINGTON SQUARE VILLAGE · Greenwich Village · BIN 1077833
💬 Discuss this project
1959Year Built
17Stories
H8Building Class
C1-7Zoning
1,485,916 sfGross Floor Area
1,921Units
LL97 CoveredRent Stabilized61 Active Violations 55 unresolved · 6 paperwork only 6 old, status unconfirmed ▸FISP: SWARMP
Dormitory · Owner of record: New York University · 265,237 sf lot · 5.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
BulkheadNew York University1p · 1 filing · 1 doc
PenthouseNew York University, Unit PHBUnder Construction29p · 2 filings · 17 docs
Floor 16New York University, Unit 16J, Unit 16R +271p · 6 filings · 17 docs
Floor 15Unit 15EG14p · 2 filings · 20 docs
Floor 14New York University, Unit 14B, Unit 14H +1Under Construction53p · 4 filings · 20 docs
Floor 13New York University, Unit 13J, Unit 13RT34p · 3 filings · 20 docs
Floor 12New York University20p · 1 filing · 15 docs
Floor 11New York UniversityUnder Construction42p · 3 filings · 17 docs
Floor 10NYU Faculty Housing, Unit 10DF10p · 2 filings · 20 docs
Floor 9New York University, Unit 9A, Unit 9NPUnder Construction67p · 5 filings · 17 docs
Floor 8New York University, Unit 8A, Unit 8BUnder Construction62p · 5 filings · 20 docs
Floor 7NYU Faculty Housing, Unit 7C, Unit 7V18p · 2 filings · 20 docs
Floor 6New York University, Unit 6SUnder Construction58p · 4 filings · 17 docs
Floor 5
Floor 4New York University, Unit 4NUnder Construction61p · 4 filings · 17 docs
Floor 3New York University, NYU Faculty Housing, Unit 3B +344p · 6 filings · 20 docs
Floor 2New York University28p · 1 filing · 17 docs
Floor 1New York University35p · 3 filings · 17 docs
BasementNew York University5p · 1 filing · 15 docs
Sub-BasementNew York University19p · 1 filing · 15 docs
Site & exteriorNew York University5p · 6 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York University18508/29/2026
NYU303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stageberg Architecture2107/08/2026
Nicolas Baratto Architect1008/26/2024
Arthur R. Breue, P.E506/22/2022
Belmont Freeman Architects601/03/2022
Leon Skvirsky PE411/01/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec3203/21/2026
Building Brothers803/21/2026
Burnham Nationwide2603/21/2026
Yao W Guo Architect2003/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hudson Plumbing & MCHPlumbing2107/08/2026
Brosna ConstructionGeneral Contractor1307/08/2026
A&A PlumbingPlumbing708/01/2026
American Sign & Electrical ConSign hanger407/08/2026
Conductor Electrical ServicesElectrical403/22/2026
SPK/Lewis ConstructionGeneral Contractor207/08/2026
Jam ElectricalElectrical203/21/2026
Mutual ElectricElectrical103/21/2026
Matrone AnthonyElectrical103/21/2026
Medco Electrical ContrngElectrical103/22/2026
New Age Electrical ContractingElectrical103/21/2026
Star-Delta ElectricElectrical103/21/2026
Tikvah Electric CoElectrical103/22/2026
Finaly General ContractingGeneral Contractor107/08/2026
Integral Construction ofGeneral Contractor107/04/2026
Power CoolingGeneral Contractor107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
M&T Plumbing and Heating CoPlumbing107/10/2026
Smart Plumbing & HeatingPlumbing107/08/2026
James F. Volpe ElectricalElectrical103/21/2026
Atlas-Acon Electric ServiceElectrical103/21/2026
Dal ElectricalElectrical103/22/2026
Jumper ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fenagh69422507/08/2026
Skyline Engineering267307/13/2022
Kline Engineering1007606/22/2022
Richmond Testing Lab263201/05/2022
Building Lifecycle
All (228)Filed (47)Permit Issued (36)Signed Off (22)Facade (FISP) (12)Violation (60)Inspection (21)Special Inspection (30)
08/10/2026
Signed off — Alteration
M01172890-S1
08/10/2026
Signed off — Alteration
M01172890-I1
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2026
Permit issued — Plumbing
M01135159-S1-PL
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
07/09/2026
Permit issued — Plumbing
M01393243-S1-PL
07/08/2026
Filed — Alteration
Filing herewith general construction to include interior renovation and minor demo to existing apartments as per plans submitted.
M01135159-P1
07/02/2026
Permit issued — General Construction
M01393243-I1-GC
06/12/2026
Filed — Alteration
Filing herewith general construction to include interior renovation to existing apartment 4N, 8A and 14B as per plans submitted.
M01393243-I1
06/12/2026
Filed — Alteration
Filing herewith general construction to include interior renovation to existing apartment 4N, 8A and 14B as per plans submitted.
M01393243-S1
06/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Lighting in dwelling units
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
04/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Permit issued — Plumbing
M01332759-S1-PL
03/24/2026
Permit issued — General Construction
M01332759-I1-GC
03/10/2026
Filed — Alteration
Filing herewith general construction to include interior renovation to existing apartment 7V as per plans submitted.
M01332759-S1
03/06/2026
Filed — Alteration
Filing herewith general construction to include interior renovation to existing apartment 7V as per plans submitted.
M01332759-I1
01/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Lighting in dwelling units
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
12/11/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
12/03/2025
Filed — Alteration
M01172890-P1
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
11/19/2025
Signed off — Alteration
Filing herewith general construction to include interior renovation and minor demo to existing apartments as per plans submitted.
M01135159-I1
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
07/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2025
Permit issued — Plumbing
M01172890-S1-PL
06/16/2025
Permit issued — General Construction
M01172890-I1-GC
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Filed — Alteration
M01172890-S1
04/09/2025
Filed — Alteration
M01172890-I1
03/17/2025
Permit issued — Plumbing
M01135159-S1-PL
03/13/2025
Permit issued — General Construction
M01135159-I1-GC
02/18/2025
Filed — Alteration
Filing herewith general construction to include interior renovation and minor demo to existing apartments as per plans submitted.
M01135159-I1
02/18/2025
Filed — Alteration
Filing herewith general construction to include interior renovation and minor demo to existing apartments as per plans submitted.
M01135159-S1
01/28/2025
Signed off — Alteration
HEREWITH FILING RENOVATION OF EXISTING APARTMENTS 3C, 7C, 13RT, AND 15B AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01076600-S1
01/28/2025
Signed off — Alteration
HEREWITH FILING RENOVATION OF EXISTING APARTMENTS 3C, 7C, 13RT, AND 15B AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01076600-I1
01/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
01/28/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
01/28/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
01/28/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
01/28/2025
Special inspection requirement — Lighting in dwelling units
AILANTO DANIEL MINAWI
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
01/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
01/28/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
01/15/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 228 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&A Plumbing07/31/2026
DOB NOWPlumbingPermit IssuedM&T Plumbing and Heating Co07/09/2026
DOB NOWGeneral ConstructionPermit IssuedIntegral Construction of07/02/2026
DOB NOWPlumbingSigned-offHudson Plumbing & MCH04/09/2026
DOB NOWGeneral ConstructionPermit IssuedBrosna Construction03/24/2026
DOB NOWPlumbingSigned-offHudson Plumbing & MCH06/17/2025
DOB NOWGeneral ConstructionSigned-offBrosna Construction06/16/2025
DOB NOWPlumbingPermit IssuedA&A Plumbing03/17/2025
DOB NOWGeneral ConstructionSigned-offFinaly General Contracting03/13/2025
DOB NOWPlumbingSigned-offHudson Plumbing & MCH10/18/2024
DOB NOWGeneral ConstructionSigned-offBrosna Construction10/16/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration12/18/2023
DOB NOWPlumbingSigned-offHudson Plumbing & MCH11/28/2023
DOB NOWGeneral ConstructionSigned-offBrosna Construction11/28/2023
DOB NOWGeneral ConstructionSigned-offBrosna Construction11/28/2023
DOB NOWPlumbingSigned-offHudson Plumbing & MCH11/24/2023
DOB NOWPlumbingSigned-offHudson Plumbing & MCH08/08/2023
DOB NOWGeneral ConstructionSigned-offBrosna Construction08/03/2023
DOB NOWPlumbingSigned-offHudson Plumbing & MCH04/24/2023
DOB NOWGeneral ConstructionSigned-offBrosna Construction04/20/2023
DOB NOWPlumbingSigned-offDPH Plumbing & Heating07/28/2022
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction07/26/2022
DOB NOWPlumbingSigned-offHudson Plumbing & MCH03/22/2022
DOB NOWGeneral ConstructionSigned-offBrosna Construction03/15/2022
DOB NOWGeneral ConstructionSigned-offPower Cooling02/10/2022
DOB NOWPlumbingPermit IssuedSmart Plumbing & Heating02/01/2022
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction08/06/2021
DOB NOWPlumbingSigned-offHudson Plumbing & MCH07/09/2021
DOB NOWGeneral ConstructionSigned-offBrosna Construction07/01/2021
DOB NOWGeneral ConstructionSigned-offBrosna Construction05/21/2021
DOB NOWPlumbingSigned-offHudson Plumbing & MCH03/12/2021
DOB NOWPlumbingSigned-offHudson Plumbing & MCH08/19/2020
DOB NOWSignPermit IssuedAmerican Sign & Electrical Con12/07/2018
DOB NOWSignPermit IssuedAmerican Sign & Electrical Con12/07/2018
DOB NOWSignPermit IssuedAmerican Sign & Electrical Con12/07/2018
DOB NOWSignPermit IssuedAmerican Sign & Electrical Con11/20/2018
BISOTISSUEDSPK/Lewis Construction03/16/2021
BISOTISSUEDSPK/Lewis Construction09/04/2020
BISOTISSUEDBrosna Construction01/14/2020
BISPLISSUEDHydrokinetic Plumbing & Heating I05/29/2019
+ 46 more permits on file
4 projects · most recent 07/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/08/2026Permit IssuedA&A PlumbingGas, Water/Sanitary
06/12/2026Permit IssuedM&T Plumbing and Heating CoGas, Water/Sanitary
03/10/2026Signed-offHudson Plumbing & MCHGas, Water/Sanitary
06/22/2022Permit IssuedSmart Plumbing & HeatingWater/Sanitary
25 projects · most recent 09/14/2026
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
09/14/2026CompleteConductor Electrical ServicesGeneral Wiring
07/09/2026Permit IssuedD&D Electl Construction CoGeneral Wiring
12/03/2025CompleteJumper ElectricGeneral Wiring
02/25/2025CompleteMatros Automated ElectricalGeneral Wiring
02/29/2024CompleteConductor Electrical ServicesGeneral Wiring
12/14/2023CompleteTikvah Electric CoGeneral Wiring
10/18/2023CompleteDal ElectricalGeneral Wiring
09/25/2023CompleteConductor Electrical ServicesGeneral Wiring
03/14/2023CompleteMatros Automated ElectricalGeneral Wiring
01/22/2023CompleteJumper Electric—
06/01/2022Permit IssuedJam Electrical—
05/05/2022CompleteBigman BrothersGeneral Wiring
03/17/2022CompleteTikvah Electric CoGeneral Wiring
09/14/2021CompleteRigid ElectricGeneral Wiring
08/20/2021CompleteJumper ElectricGeneral Wiring
1 project · most recent 03/10/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/10/2026Signed-offHudson Plumbing & MCHTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/05/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
07/10/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/11/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/27/2026Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
04/27/2026Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
04/27/2026Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
04/27/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/27/2026FinalAILANTO DANIEL MINAWIprogress
04/27/2026Lighting controlsAILANTO DANIEL MINAWIenergy_progress
04/27/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
04/27/2026Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
04/24/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
01/22/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
12/11/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
12/11/2025Lighting in dwelling unitsAILANTO DANIEL MINAWIenergy_progress
12/11/2025Lighting controlsAILANTO DANIEL MINAWIenergy_progress
12/11/2025Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
12/11/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
12/11/2025FinalAILANTO DANIEL MINAWIprogress
12/11/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
12/11/2025Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
12/03/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
10/22/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
01/28/2025FinalAILANTO DANIEL MINAWIprogress
01/28/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
01/28/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
Latest 25 of 102.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYU Faculty HousingResidentialFloors 3, 7, 10
Project M01332759 Alteration · Permit Entire · 03/06/2026
Project M00511647 Alteration · LOC Issued · 05/28/2021
Project M00511645 Alteration · LOC Issued · 05/27/2021
Project M00262512 Alteration · LOC Issued · 02/18/2020
New York UniversityEducationSub-basement, Floors 1–4, 6, 8, 9, 11–14, 16, Penthouse
Project M01172890 Alteration · LOC Issued · 04/09/2025
Project M01135159 Alteration · Permit Entire · 02/18/2025
Project M00965914 Alteration · Permit Entire · 11/27/2023
Project M00873090 Alteration · LOC Issued · 05/31/2023
Project M00839184 Alteration · LOC Issued · 04/05/2023
Project M00839203 Alteration · LOC Issued · 04/05/2023
Project M00723229 Alteration · LOC Issued · 07/13/2022
Project M00731337 Alteration · LOC Issued · 07/13/2022
Project M00607240 Alteration · Permit Entire · 11/30/2021
Project M00553801 Alteration · LOC Issued · 07/22/2021
Project M00508362 Alteration · LOC Issued · 05/04/2021
Project M00075474 Alteration · Permit Entire · 11/01/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 983 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch45
09/06/2026M00075499-I1Request digital key ↗
09/06/2026M00075496-I1Request digital key ↗
09/06/2026M00075488-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00262512-I1Request digital key ↗
08/15/2026M00262512-P1Request digital key ↗
▸Applications & Permits134
▸BISPLAN / WORK APPROVAL APPLICATION68
08/05/2020140913126Open ↗
12/26/2019123844992Open ↗
04/02/2019123862285Open ↗
Showing 3 of 68 on file for this type
▸BISWORK PERMIT APPLICATION64
09/04/2020140913126Open ↗
01/14/2020123844992Open ↗
05/29/2019123862285Open ↗
Showing 3 of 64 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
03/29/2019121130347Open ↗
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications302
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION87
12/26/2019123844992Open ↗
12/05/2019123844992Open ↗
10/21/2019123862285Open ↗
Showing 3 of 87 on file for this type
▸DOB NOWProgress Inspector Seal & Signature63
09/18/2026M00511645-I1Open ↗
09/18/2026M00075488-I1Open ↗
09/18/2026M00511645-I1Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/06/2026M00075496-I1Open ↗
09/06/2026M00075474-I1Open ↗
09/03/2026M00553801-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/28/2026M01172890-P1Open ↗
09/23/2026M01135159-P1Open ↗
09/18/2026M00511645-I1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
12/26/2019123844992Open ↗
04/02/2019123862285Open ↗
01/18/2019123156529Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
08/05/2020140913126Open ↗
12/05/2019123844992Open ↗
04/02/2019123862285Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/05/2020140913126Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/05/2020140913126Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment51
▸BISSELF-CERT PLUMBING NOTICE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
04/02/2019123862285Open ↗
01/18/2019123156529Open ↗
05/18/2018123367383Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes13
12/05/2019123844992Open ↗
04/02/2019123862285Open ↗
01/18/2019123156529Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00262512-P1Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos149
▸DOB NOWOER: Notice to Proceed33
09/06/2026M00075496-I1Open ↗
09/06/2026M00075474-I1Open ↗
09/03/2026M00629726-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWOER: Notice of Satisfaction30
09/03/2026M00629726-S1Open ↗
09/03/2026M00629726-I1Open ↗
08/24/2026M01135159-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form21
09/03/2026M00629726-S1Open ↗
08/31/2026M00839184-I1Open ↗
08/29/2026M00839203-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED12
08/05/2020140913126Open ↗
12/23/2019123844992Open ↗
05/30/2018123367383Open ↗
Showing 3 of 12 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM11
04/27/2021140913126Open ↗
12/05/2019123844992Open ↗
01/18/2019123156529Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00553801-I1Open ↗
08/29/2026M00932221-S1Open ↗
08/13/2026M00932221-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
10/29/2020121130347Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/22/2019123862285Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
09/04/2020140913126Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance92
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS55
12/26/2019123844992Open ↗
12/05/2019123844992Open ↗
10/21/2019123862285Open ↗
Showing 3 of 55 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS20
04/27/2021140913126Open ↗
12/08/2020123844992Open ↗
10/29/2020121130347Open ↗
Showing 3 of 20 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis5
09/03/2026M00629726-I1Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/27/2021140913126Open ↗
12/08/2020123844992Open ↗
10/29/2020121130347Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/05/2020140913126Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/27/2021140913126Open ↗
12/08/2020123844992Open ↗
10/29/2020121130347Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
03/14/2019123380475Open ↗
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
04/27/2021140913126Open ↗
12/08/2020123844992Open ↗
10/29/2020121130347Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
10/21/2019123862285Open ↗
09/11/2019123156529Open ↗
09/11/2019123156529Open ↗
Showing 3 of 11 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership60
▸BISCOST AFFIDAVIT59
04/27/2021140913126Open ↗
12/08/2020123844992Open ↗
10/29/2020121130347Open ↗
Showing 3 of 59 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms61
▸BISEFILING COVER SHEET33
12/05/2019123844992Open ↗
04/02/2019123862285Open ↗
01/18/2019123156529Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM15
10/21/2019123862285Open ↗
09/11/2019123156529Open ↗
03/14/2019123380475Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION9
08/05/2020140913126Open ↗
04/30/2018123150712Open ↗
Showing 2 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/05/2020140913126Open ↗
Showing 1 of 4 on file for this type
▸Other Documents6
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M00965914-I1Open ↗