← Back
Single or multiple dwelling with stores or offices
1 WATTS STREET
MANHATTAN · BIN 1079917
💬 Discuss this project
1825Year Built
5Stories
S9Building Class
M1-5/R10Zoning
5,029 sfGross Floor Area
6Units
9 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 366 WEST BROADWAY LLC · 1,524 sf lot · 3.3 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Roof3p · 3 filings · 15 docs
Floor 51p · 1 filing · 3 docs
Floor 41p · 1 filing · 3 docs
Floor 31p · 1 filing · 3 docs
Floor 21p · 1 filing · 3 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
366 W BROADWAY1707/08/2026
366 WEST BROADWAY3007/08/2026
BIGFOOT MEDIA PROPERTIES, LLC503/22/2026
336 WEST BROADWAY103/22/2026
VERIZON WIRELESS103/21/2026
ABE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL PERDEK, PROF. ENG. PLLC101/29/2024
KZ ENGINEERING, P.C308/17/2023
PARADIGM ARCHITECTURE108/11/2023
SCHERER DESIGN GROUP106/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
AE DESIGN SOLUTION403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor807/08/2026
DMG GROUP NYC LTDGeneral Contractor303/21/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor203/21/2026
SEECHARAN, STEVEElectrical203/21/2026
DESIGN DEVELOPERS GROUP*General Contractor207/08/2026
CANAVAN, ANDREWElectrical203/21/2026
TIMOTHY COLEMANElectrical103/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481201/29/2024
PARADIGM ARCHITECTURE5931108/11/2023
SCHERER DESIGN GROUP7921106/13/2022
Building Lifecycle
All (67)Filed (8)Permit Issued (10)Signed Off (4)Violation (30)Objection (8)Special Inspection (7)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/06/2025
Signed off — Alteration
Modification of Verizon site. Replace 2 antenna, install 6 new RRH units, remove 1 equipment cabinet, install 1 new steel platform with equipment cabinets.
M00722169-I1
10/01/2024
Signed off — Alteration
EXTERIOR FACADE RESTORATION AND REPAIRS. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00900480-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2024
Signed off — Alteration
M00825323-I1
09/03/2024
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00841729-I1
08/19/2024
Permit issued — Suspended Scaffold
M01091467-I1-SC
08/09/2024
Filed — Alteration
M01091467-I1
04/15/2024
Permit issued — General Construction
M00900480-I1-GC
03/18/2024
Permit issued — Supported Scaffold
M00841729-I1-SF
02/08/2024
Permit issued — Sidewalk Shed
M00825323-I1-SH
02/01/2024
Permit issued — Structural
M00988021-I1-ST
02/01/2024
Permit issued — Suspended Scaffold
M00989759-I1-SC
01/29/2024
Filed — Alteration
M00988021-I1
01/24/2024
Filed — Alteration
Installation of suspended scaffold for facade work and inspection
M00989759-I1
09/01/2023
Permit issued — General Construction
M00900480-I1-GC
08/17/2023
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00841729-P1
08/11/2023
Filed — Alteration
EXTERIOR FACADE RESTORATION AND REPAIRS. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00900480-I1
07/20/2023
Permit issued — Antenna
M00722169-I1-AN
07/06/2023
Special inspection requirement — Masonry
Anthony Addesso
07/06/2023
Special inspection requirement — Post-installed Anchors
Anthony Addesso
07/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
07/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
Anthony Addesso
07/06/2023
Special inspection requirement — Final
Anthony Addesso
07/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Anthony Addesso
07/06/2023
Special inspection requirement — Air barrier - visual inspection
Anthony Addesso
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Permit issued — Supported Scaffold
M00841729-I1-SF
03/23/2023
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00841729-I1
03/21/2023
Violation issued (ECB, closed)
Construction
02/15/2023
Permit issued — Sidewalk Shed
M00825323-I1-SH
02/14/2023
Filed — Alteration
M00825323-I1
02/06/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/03/2023
Violation issued (ECB, closed)
Construction
11/09/2022
Violation issued (ECB, closed)
Construction
11/09/2022
Violation issued (ECB, closed)
Construction
11/09/2022
Violation issued (ECB, closed)
Construction
11/09/2022
Violation issued (ECB, closed)
Construction
11/09/2022
Violation issued (ECB, closed)
Construction
06/15/2022
Objection raised — Scope
06/15/2022
Objection resolved — Addressed
06/15/2022
Objection raised — Zoning
06/15/2022
Objection resolved — Addressed
06/15/2022
Objection raised — Scope
06/15/2022
Objection resolved — Addressed
06/15/2022
Objection raised — Structural
06/15/2022
Objection resolved — Addressed
06/13/2022
Filed — Alteration
Modification of Verizon site. Replace 2 antenna, install 6 new RRH units, remove 1 equipment cabinet, install 1 new steel platform with equipment cabinets.
M00722169-I1
01/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/2002
Violation issued (ECB, closed)
Signs
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedPPM TELECOM LLC08/19/2024
DOB NOWGeneral ConstructionSigned-offDMG GROUP NYC LTD04/15/2024
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC03/18/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC02/08/2024
DOB NOWStructuralPermit IssuedDESIGN DEVELOPERS GROUP*02/01/2024
DOB NOWSuspended ScaffoldPermit IssuedIGH RESTORATION LLC02/01/2024
DOB NOWGeneral ConstructionSigned-offDESIGN DEVELOPERS GROUP*09/01/2023
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP07/20/2023
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC03/24/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC02/15/2023
BISMHISSUEDWEATHER CHAMPIONS LTD02/09/2018
BISOTISSUEDTELCOM ENGINEERING GP INC10/24/2016
BISOTISSUEDTELCOM ENGINEERING GP INC04/05/2016
BISOTISSUEDNEW YORK INTERIOR CONTR I12/23/2011
BISOTISSUEDOUTFRONT MEDIA SIGN ERECT05/03/2002
BIS—ISSUEDOUTFRONT MEDIA SIGN ERECT05/31/2001
BISOTISSUEDOUTFRONT MEDIA SIGN ERECT02/01/2001
BISOTISSUEDOUTFRONT MEDIA SIGN ERECT11/01/2000
BIS—ISSUEDOUTFRONT MEDIA SIGN ERECT11/01/2000
BISOTISSUEDOUTFRONT MEDIA SIGN ERECT11/01/2000
BIS—ISSUEDBERGER SIGN FABRACATION INC06/19/1998
BIS—ISSUEDBERGER SIGN FABRACATION INC06/19/1998
BIS—ISSUEDBERGER SIGN FABRICATION IC06/18/1998
BIS—ISSUEDBERGER SIGN FABRICATION IC06/18/1998
BISOTISSUEDMICHAEL DEMARO03/02/1998
BISOTISSUEDMICHAEL DEMARO02/12/1998
BISPLISSUEDPLUMBING & HTG DOCTOR INC03/10/1994
BISMHISSUEDSPACE CARPENTERS03/03/1994
1 project · most recent 03/23/2023
FiledStatusContractorScope
03/23/2023CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 01/24/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
01/24/2024Permit IssuedIGH RESTORATION LLCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/06/2023MasonryAnthony Addessospecial
07/06/2023Post-installed AnchorsAnthony Addessospecial
07/06/2023Structural Stability – Alterations of existing buildingsAnthony Addessospecial
07/06/2023Tenant Protection Plan ComplianceAnthony Addessospecial
07/06/2023FinalAnthony Addessoprogress
07/06/2023Energy Code Compliance InspectionsAnthony Addessoprogress
07/06/2023Air barrier - visual inspectionAnthony Addessoenergy_progress
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026M00825323-I1Request digital key ↗
08/31/2026M00841729-P1Request digital key ↗
08/31/2026M00841729-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION4
02/08/2018140729497Open ↗
11/09/2016122213461Open ↗
04/13/2016122213461Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
02/08/2018140729497Open ↗
12/11/2014122213461Open ↗
12/28/2011120932615Open ↗
▸DOB NOWLPC Approval/Permit2
08/15/2026M00722169-I1Open ↗
08/13/2026M00900480-I1Open ↗
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/15/2018140729497Open ↗
03/15/2018140729497Open ↗
04/06/2017122213461Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00722169-I1Open ↗
08/31/2026M00825323-I1Open ↗
08/31/2026M00841729-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026M00900480-I1Open ↗
08/24/2026M00900480-I1Open ↗
08/24/2026M00900480-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026M00900480-I1Open ↗
08/24/2026M00900480-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/08/2018140729497Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/28/2011120932615Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/28/2011120932615Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/08/2018140729497Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS1
03/08/2018140729497Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/08/2018140729497Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/21/2016122213461Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026M00900480-I1Open ↗
08/28/2026M00988021-I1Open ↗
08/15/2026M00722169-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/08/2018140729497Open ↗
12/11/2014122213461Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/28/2011120932615Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/15/2018140729497Open ↗
03/15/2018140729497Open ↗
04/06/2017122213461Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/15/2018140729497Open ↗
04/06/2017122213461Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/08/2018140729497Open ↗
▸BISNYCECC ANALYSIS1
02/08/2018140729497Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/28/2011120932615Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/08/2018140729497Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLANDMARKS APPROVAL4
03/15/2018140729497Open ↗
02/08/2018140729497Open ↗
03/21/2016122213461Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/15/2018140729497Open ↗
04/06/2017122213461Open ↗
01/03/2013120932615Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/28/2011120932615Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/15/2018140729497Open ↗
02/08/2018140729497Open ↗
04/06/2017122213461Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
12/11/2014122213461Open ↗
12/28/2011120932615Open ↗
▸BISBOROUGH INTAKE FORM1
03/15/2018140729497Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/08/2018140729497Open ↗
▸Other Documents3
▸DOB NOWIRA Certification1
08/13/2026M01091467-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00989759-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00989759-I1Open ↗