← Back
Building
1 WELDING ROAD
BIN 3428520
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof7p · 5 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 1Under Construction91p · 3 filings · 20 docs
MezzanineUnder Construction101p · 4 filings · 20 docs
1 job · most recent 06/16/2025
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2025Permit IssuedSTEINER BUILDING NYC LLCAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Daikin Daiken REYQ168XAYDB 14 tons · Vrf Outdoor ×25
Daikin DPS025AHMG4DV-4 25 tons · Rooftop Unit ×20
Daikin RZQ24TBVJUA 6 tons · Split System ×20
Daikin REYQ144XAYDB 12 tons · Vrf Outdoor ×10
Daikin RPS130DLASY 120 tons · Rooftop Unit ×10
Daikin RXYQ72XAYDA 6 tons · Vrf Outdoor ×10
Daiken REYQ144XAYDB 12 tons · Vrf Outdoor ×5
Daikin DPS015AHMG4DV-6 14 tons · Rooftop Unit ×5
Daikin DPS016AHMG4DV-4 16 tons · Rooftop Unit ×5
Daikin DPSA052A4BSASD0B04560AGG5KEV0R 52 tons · Rooftop Unit ×5
Daikin REYQ168XAYDB 14 tons · Vrf Outdoor ×5
Lennox Lennox KGB060S4BQ4G 5 tons · Rooftop Unit ×10
Ventilation
Aaon AAON RN-011-3-0-GB05-2F4 10 tons · Rooftop Unit ×5
AAON RN-013-3-0-GB05-2G4 14 tons · Rooftop Unit ×5
Ducts & Piping
__Junk__ OOO ×4
1 job · most recent 06/16/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/16/2025Signed-offDEMAR MECHANICAL INCGas, Storm, Water/Sanitary
5 jobs · most recent 09/29/2025
General Wiring
FiledStatusContractorScope
09/29/2025Permit IssuedAGIR ELEC'L LTD. D/B/AGeneral Wiring
08/29/2025CompleteJAM ELECTRICAL CORP—
08/11/2025CompleteJAM ELECTRICAL CORP—
03/08/2023CompleteAGIR ELEC'L LTD. D/B/A—
11/08/2022CompleteELPO ELECTRICAL CONTG INC—
1 job · most recent 06/16/2025
Steel Concrete
FiledStatusContractorScope
06/16/2025Permit IssuedSTEINER BUILDING NYC LLCSteel, Concrete
Building Lifecycle
All (199)Filed (34)Permit Issued (62)Signed Off (14)Violation (3)Inspection (18)Objection (38)Special Inspection (30)
04/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-S5
02/05/2026
Permit issued — General Construction
B00597898-I1-GC
10/08/2025
Violation issued (FDNY_ORDER, closed)
09/30/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-S4
09/29/2025
Signed off — Alteration
Install new sprinkler/standpipe, filed in conjunction with ALT1 B00597898
B00783380-I1
09/10/2025
Signed off — Alteration
Install (2) new Boilers on the Roof. In conjunction with ALT 1 B00597898
B00793382-I1
09/04/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
09/03/2025
Signed off — Alteration
Herewith filing to install a temporary dry standpipe with a air pressurized alarm. In conjunction with ALt.1 B00597898
B00793101-I1
08/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
RICHARD GREENWALD
08/05/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
08/05/2025
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
08/05/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
08/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/30/2025
Filed — Alteration
Install new sprinkler/standpipe, filed in conjunction with ALT1 B00597898
B00783380-P3
07/23/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
07/21/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/02/2025
Filed — Alteration
Install (2) new Boilers on the Roof. In conjunction with ALT 1 B00597898
B00793382-P2
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
07/02/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
06/24/2025
Signed off — Alteration
B00611325-I1
06/20/2025
Permit issued — Boiler Equipment
B00793382-I1-BE
06/18/2025
Violation issued (ECB, closed)
Unknown
06/18/2025
Violation issued (ECB, closed)
Unknown
06/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-P6
06/16/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/10/2025
Permit issued — Construction Fence
B00825342-I1-FN
06/06/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-S1
06/06/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-S2
06/02/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-P7
05/30/2025
Signed off — Alteration
Scope of work: Existing, vacant bldg. to remain, vacant during work. Work includes the removal of existing non-structural partitions, ceilings, doors, decommissioned equipment, ductwork, conduits, & all interior & exterior windows. All egress to remain.
B08016801-I1
05/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/30/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/30/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
05/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
05/14/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
RICHARD GREENWALD
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
05/14/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
05/14/2025
Special inspection requirement — Final
RICHARD GREENWALD
05/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
05/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
05/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
05/14/2025
Special inspection requirement — Shutoff dampers
RICHARD GREENWALD
04/30/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00843598-I1
04/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-P3
04/29/2025
Filed — Alteration
Install new sprinkler/standpipe, filed in conjunction with ALT1 B00597898
B00783380-P2
04/29/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of mechanical units on floors 1-Roof in conjunction with B00597898
B00597898-P5
04/28/2025
Filed — Alteration
Install (2) new Boilers on the Roof. In conjunction with ALT 1 B00597898
B00793382-P1
04/17/2025
Permit issued — Sprinklers
B00783380-I1-EW-SD
04/16/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
04/16/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
04/16/2025
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
04/16/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
Latest 60 of 199 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING1207/08/2026
BNY CAMPUS ASSOCIATES407/08/2026
STEINER103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING2203/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEINER BUILDING NYC LLCGeneral Contractor4207/08/2026
LEMX CORPGeneral Contractor1607/08/2026
PRESERV BLD RESTOR MGT INGeneral Contractor907/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor807/08/2026
G.N.T. MECHANICAL LLCFire Protection707/08/2026
DEMAR MECHANICAL INCPlumbing407/08/2026
PHOENIX SUTTON STR INCGeneral Contractor207/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor207/08/2026
WJ PROFESSIONAL EXPEDITINGeneral Contractor107/08/2026
AGIR ELEC'L LTD. D/B/AElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6872007/30/2025
GEODESIGN, INC., P.C.627108/18/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTEINER BUILDING NYC LLC02/05/2026
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC06/20/2025
DOB NOWConstruction FencePermit IssuedMC SUPERSTRUCTURE INC06/10/2025
DOB NOWSprinklersSigned-offG.N.T. MECHANICAL LLC04/17/2025
DOB NOWGeneral ConstructionSigned-offSTEINER BUILDING NYC LLC02/06/2025
DOB NOWFoundationSigned-offSTEINER BUILDING NYC LLC02/06/2025
DOB NOWStructuralSigned-offSTEINER BUILDING NYC LLC02/06/2025
DOB NOWMechanical SystemsSigned-offSTEINER BUILDING NYC LLC02/06/2025
DOB NOWGeneral ConstructionPermit IssuedSTEINER BUILDING NYC LLC02/06/2025
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN01/14/2025
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC01/14/2025
DOB NOWGeneral ConstructionSigned-offSTEINER BUILDING NYC LLC12/18/2024
DOB NOWGeneral ConstructionPermit IssuedSTEINER BUILDING NYC LLC12/17/2024
DOB NOWStructuralSigned-offSTEINER BUILDING NYC LLC12/17/2024
DOB NOWMechanical SystemsSigned-offSTEINER BUILDING NYC LLC12/17/2024
DOB NOWFoundationSigned-offSTEINER BUILDING NYC LLC12/17/2024
DOB NOWStandpipeSigned-offG.N.T. MECHANICAL LLC12/11/2024
DOB NOWStandpipeSigned-offG.N.T. MECHANICAL LLC12/11/2024
DOB NOWSupported ScaffoldSigned-offLEMX CORP12/02/2024
DOB NOWSidewalk ShedSigned-offLEMX CORP12/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRESERV BLD RESTOR MGT IN11/26/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC06/24/2024
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC06/12/2024
DOB NOWConstruction FencePermit IssuedMC SUPERSTRUCTURE INC06/12/2024
DOB NOWSupport of ExcavationSigned-offSTEINER BUILDING NYC LLC02/01/2024
DOB NOWMechanical SystemsSigned-offSTEINER BUILDING NYC LLC02/01/2024
DOB NOWGeneral ConstructionPermit IssuedSTEINER BUILDING NYC LLC01/31/2024
DOB NOWStructuralSigned-offSTEINER BUILDING NYC LLC01/30/2024
DOB NOWGeneral ConstructionSigned-offSTEINER BUILDING NYC LLC01/30/2024
DOB NOWFoundationSigned-offSTEINER BUILDING NYC LLC01/30/2024
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN01/27/2024
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC01/18/2024
DOB NOWStandpipeSigned-offG.N.T. MECHANICAL LLC01/10/2024
DOB NOWStandpipeSigned-offG.N.T. MECHANICAL LLC01/10/2024
DOB NOWMechanical SystemsSigned-offSTEINER BUILDING NYC LLC12/20/2023
DOB NOWStructuralSigned-offSTEINER BUILDING NYC LLC12/20/2023
DOB NOWGeneral ConstructionPermit IssuedSTEINER BUILDING NYC LLC12/20/2023
DOB NOWSupport of ExcavationSigned-offSTEINER BUILDING NYC LLC12/20/2023
DOB NOWGeneral ConstructionSigned-offSTEINER BUILDING NYC LLC12/20/2023
DOB NOWFoundationSigned-offSTEINER BUILDING NYC LLC12/20/2023
+ 10 more permits on file
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
09/04/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/21/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/30/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/21/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Pass-Final PL - UndergroundPassView ↗
02/01/2024Pass-Final PL - UndergroundPassView ↗
01/29/2024Pass-Final PL - UndergroundPassView ↗
03/13/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/13/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/01/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/05/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)RICHARD GREENWALDspecial
08/05/2025Post-installed AnchorsRICHARD GREENWALDspecial
08/05/2025Standpipe SystemsRICHARD GREENWALDspecial
08/05/2025Sprinkler SystemsRICHARD GREENWALDspecial
07/23/2025Heating SystemsRICHARD GREENWALDspecial
07/23/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
07/02/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
07/02/2025Heating SystemsRICHARD GREENWALDspecial
06/16/2025Post-installed AnchorsRICHARD GREENWALDspecial
06/16/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
05/30/2025Post-installed AnchorsRICHARD GREENWALDspecial
05/30/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
05/14/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)RICHARD GREENWALDspecial
05/14/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
05/14/2025Mechanical SystemsRICHARD GREENWALDspecial
05/14/2025FinalRICHARD GREENWALDprogress
05/14/2025HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
05/14/2025HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
05/14/2025HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
05/14/2025Shutoff dampersRICHARD GREENWALDenergy_progress
04/16/2025Post-installed AnchorsRICHARD GREENWALDspecial
04/16/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
04/16/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
04/16/2025Heating SystemsRICHARD GREENWALDspecial
04/16/2025Standpipe SystemsRICHARD GREENWALDspecial
Latest 25 of 50.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch33
08/31/2026B00611325-I1Request digital key ↗
08/28/2026B00597898-P6Request digital key ↗
08/28/2026B00597898-P7Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00363604-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00597898-I1Open ↗
08/13/2026B00597898-P1Open ↗
08/13/2026B00597898-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00597898-I1Open ↗
▸Seals & Professional Certifications84
▸DOB NOWSpecial Inspector Seal & Signature40
09/23/2026B00793382-I1Open ↗
09/23/2026B00793382-I1Open ↗
09/02/2026B00597898-S1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/31/2026B00611325-I1Open ↗
08/28/2026B00597898-P6Open ↗
08/28/2026B00597898-P7Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00597898-S1Open ↗
09/02/2026B00597898-S1Open ↗
09/02/2026B00597898-S2Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form11
08/31/2026B00611325-I1Open ↗
08/28/2026B00597898-S4Open ↗
08/28/2026B00597898-S5Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs16
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/27/2026B00793382-P1Open ↗
08/15/2026B00793382-I1Open ↗
08/13/2026B00597898-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/13/2026B08031530-P5Open ↗
08/13/2026B08031530-P3Open ↗
08/13/2026B08031530-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/31/2026B00611325-I1Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial4
08/13/2026B00597898-P6Open ↗
08/13/2026B00597898-I1Open ↗
08/13/2026B00597898-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/27/2026B00793382-P1Open ↗
08/15/2026B00793382-I1Open ↗
08/13/2026B00793382-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/28/2026B00597898-P2Open ↗
08/28/2026B00597898-P6Open ↗
08/15/2026B00597898-I1Open ↗
Showing 3 of 4 on file for this type