Church, synagogue, chapel
Marble Collegiate Reformed Church
1 WEST 29TH STREET · BIN 1015764
💬 Discuss this project
1854Year Built
1Stories
M1Building Class
C5-2Zoning
13,984 sfGross Floor Area
1Units
0 Active Violations
Church, synagogue, chapel · 14,835 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMarble Collegiate Church8p · 4 filings · 19 docs
AtticMarble Collegiate Church4p · 1 filing · 16 docs
Floor 3Marble Collegiate Church40p · 6 filings · 16 docs
Floor 2Marble Collegiate Church37p · 6 filings · 16 docs
Floor 1Marble Collegiate Church13p · 9 filings · 16 docs
CellarMarble Collegiate Church34p · 4 filings · 17 docs
Site & exteriorMarble Collegiate Church28p · 6 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Collegiate Church13007/08/2026
Church807/08/2026
HFZ Kik 30th Street303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants1203/21/2026
AE Design Solution1603/21/2026
Hlzae103/21/2026
JP Expedite403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nova Construction ServiceScaffold907/08/2026
Quest Builders GroupGeneral Contractor603/21/2026
Pro Star Plumbing, Heating & MechanicalPlumbing607/08/2026
Nova Construction ServiceGeneral Contractor207/08/2026
Signs Cadspecialty_contractor107/08/2026
Signs CadSign hanger107/08/2026
Five Boro AssociatesFire Protection107/08/2026
Top Shelf ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Howard L Zimmerman Architects1712103/29/2024
Domani Inspection Service8431001/24/2022
Beyond Arch3600106/30/2020
Building Lifecycle
All (177)Filed (21)Permit Issued (23)Signed Off (13)Violation (60)Inspection (4)Objection (26)Special Inspection (30)
09/24/2025
Signed off — Alteration
M01090734-I1
09/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01078251-I1
09/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01225888-I1
09/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01078259-I1
09/24/2025
Signed off — Alteration
M01121838-I1
09/23/2025
Signed off — Alteration
MASONRY CLADDING INSTALLATION, PARAPET REBUILD, RAILING INSTALATION, BRICK REPLACEMENT, MASONRY RE-POINTING, AND PARTIAL ROOF REPLACEMENT . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00896723-I1
09/08/2025
Permit issued — Protection and Mechanical Methods
M01121838-I1-PMM
08/04/2025
Permit issued — General Construction
M00896723-I1-GC
08/04/2025
Permit issued — Supported Scaffold
M01078259-I1-SF
08/04/2025
Permit issued — Protection and Mechanical Methods
M01090734-I1-PMM
07/16/2025
Permit issued — Sidewalk Shed
M01078251-I1-SH
05/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01078259-P2
05/21/2025
Filed — Alteration
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01225888-I1
05/21/2025
Permit issued — Protection and Mechanical Methods
M01225888-I1-PMM
05/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01078251-P1
05/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01078259-P1
05/13/2025
Violation issued (ECB, closed)
Unknown
05/13/2025
Violation issued (ECB, closed)
Construction
05/13/2025
Violation issued (ECB, closed)
Construction
10/08/2024
Permit issued — Protection and Mechanical Methods
M01121838-I1-PMM
10/07/2024
Filed — Alteration
M01121838-I1
08/09/2024
Permit issued — Supported Scaffold
M01078259-I1-SF
08/09/2024
Permit issued — Protection and Mechanical Methods
M01090734-I1-PMM
08/07/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01078259-I1
08/07/2024
Permit issued — General Construction
M00896723-I1-GC
08/06/2024
Filed — Alteration
M01090734-I1
07/23/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01078251-I1
07/23/2024
Permit issued — Sidewalk Shed
M01078251-I1-SH
04/16/2024
Objection resolved — Addressed
04/16/2024
Objection resolved — Addressed
04/03/2024
Objection raised — Admin
04/03/2024
Objection raised — Other
03/29/2024
Filed — Alteration
MASONRY CLADDING INSTALLATION, PARAPET REBUILD, RAILING INSTALATION, BRICK REPLACEMENT, MASONRY RE-POINTING, AND PARTIAL ROOF REPLACEMENT . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00896723-I1
06/27/2023
Special inspection requirement — Post-installed Anchors
Howard Zimmerman
06/27/2023
Special inspection requirement — Final
Howard Zimmerman
06/27/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Howard Zimmerman
06/27/2023
Special inspection requirement — Masonry
Howard Zimmerman
06/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
06/01/2022
Signed off — Alteration
M00615293-I1
02/28/2022
Signed off — Alteration
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
M00434488-I1
02/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
02/08/2022
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
01/27/2022
Signed off — Alteration
Installation of new low pressure steam boiler plant, associated equipment and accessories. Installation of new VRF heating and cooling equipment for limited areas. No change in use, egress or occupancy.
M00434481-I1
01/24/2022
Filed — Alteration
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
M00434488-P4
01/21/2022
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
01/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/17/2021
Filed — Alteration
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
M00434488-P3
12/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
10/29/2021
Signed off — Alteration
REMOVAL OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 121204632.
M00507660-I1
10/28/2021
Signed off — Alteration
DEMOLITION OF EXISTING INTERIOR MASONRY WALL. SLAB ON METAL DECK INFILL WITH STRUCTURAL STEEL. WELD SPLICING OF EXISTING STEEL BEAMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00439355-I1
10/26/2021
Permit issued — Boiler Equipment
M00615293-I1-BE
10/26/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/22/2021
Filed — Alteration
M00615293-I1
10/04/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/15/2021
Filed — Alteration
Installation of new & relocated sprinkler heads and piping. New floor drains and roof drains connected to existing sewer, new water closets and lavatories. New gas service from Con Ed, with new gas meter assembly and room, new gas distribution piping.
M00434488-P2
09/10/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/03/2021
Special inspection requirement — Final
JOHN MCMONAGLE
09/03/2021
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service09/08/2025
DOB NOWGeneral ConstructionSigned-offNova Construction Service08/04/2025
DOB NOWSupported ScaffoldSigned-offNova Construction Service08/04/2025
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service08/04/2025
DOB NOWSidewalk ShedSigned-offNova Construction Service07/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service05/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service10/08/2024
DOB NOWSupported ScaffoldSigned-offNova Construction Service08/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service08/09/2024
DOB NOWGeneral ConstructionSigned-offNova Construction Service08/07/2024
DOB NOWSidewalk ShedSigned-offNova Construction Service07/23/2024
DOB NOWBoiler EquipmentSigned-offPro Star Plumbing, Heating & Mechanical10/26/2021
DOB NOWBoiler EquipmentPermit IssuedPro Star Plumbing, Heating & Mechanical07/19/2021
DOB NOWPlumbingSigned-offPro Star Plumbing, Heating & Mechanical07/15/2021
DOB NOWBoiler EquipmentPermit IssuedPro Star Plumbing, Heating & Mechanical07/15/2021
DOB NOWMechanical SystemsSigned-offQuest Builders Group06/10/2021
DOB NOWSprinklersSigned-offFive Boro Associates05/28/2021
DOB NOWStructuralSigned-offQuest Builders Group05/17/2021
DOB NOWBoiler EquipmentPermit IssuedPro Star Plumbing, Heating & Mechanical05/12/2021
DOB NOWPlumbingSigned-offPro Star Plumbing, Heating & Mechanical05/03/2021
DOB NOWGeneral ConstructionSigned-offQuest Builders Group05/01/2021
DOB NOWStructuralSigned-offSigns Cad07/01/2020
DOB NOWSignSigned-offSigns Cad04/08/2020
BIS—ISSUEDQuest Builders Group02/22/2022
BISMHISSUEDMobile Steam Boiler Renta06/30/2020
BISOTISSUEDPavarini McGovern01/24/2020
BISOTISSUEDPavarini McGovern12/05/2019
BISMHISSUEDMobile Steam Boiler Renta08/16/2019
BISSPISSUEDAshlar Mechanical10/03/2017
BISSPISSUEDReem Plumbing & Heating05/18/2017
BISPLISSUEDReem Plumbing & Heating05/18/2017
BISSPISSUEDTristate Plumbing Services05/12/2017
BISMHISSUEDAcc Construction06/28/2016
BISOTISSUEDAcc Construction06/28/2016
BISOTISSUEDAcc Construction06/28/2016
BISSPISSUEDAshlar Mechanical03/18/2016
BISOTISSUEDJames E Fitzgerald10/26/2015
BISOTISSUEDJames E Fitzgerald10/26/2015
BISOTISSUEDJames E Fitzgerald08/26/2015
BISOTISSUEDJames E Fitzgerald08/26/2015
+ 33 more permits on file
3 projects · most recent 07/29/2024
General Wiring
FiledStatusContractorScope
07/29/2024CompleteTop Shelf Electric—
08/06/2021CompleteMho's Electric—
05/12/2021CompleteMikoma ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/26/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/04/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/10/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/27/2023Post-installed AnchorsHoward Zimmermanspecial
06/27/2023FinalHoward Zimmermanprogress
06/27/2023Wall Panels, Curtain Walls, and VeneersHoward Zimmermanspecial
06/27/2023MasonryHoward Zimmermanspecial
06/27/2023Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
02/08/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/08/2022Sprinkler SystemsJOHN MCMONAGLEspecial
01/21/2022Sprinkler SystemsJOHN MCMONAGLEspecial
01/21/2022Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/16/2021Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/16/2021Sprinkler SystemsJOHN MCMONAGLEspecial
09/03/2021Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/03/2021FinalJOHN MCMONAGLEprogress
09/03/2021Mechanical SystemsJOHN MCMONAGLEspecial
09/03/2021Heating SystemsJOHN MCMONAGLEspecial
08/05/2021FinalJOHN MCMONAGLEprogress
08/05/2021Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/05/2021Heating SystemsJOHN MCMONAGLEspecial
08/05/2021Mechanical SystemsJOHN MCMONAGLEspecial
08/05/2021Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/05/2021Sprinkler SystemsJOHN MCMONAGLEspecial
04/22/2021Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
04/21/2021FinalMichael Doyleprogress
12/10/2020Structural Steel - DetailsJOHN MCMONAGLEspecial
12/10/2020Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Marble Collegiate ChurchReligiousEntire building
Project M01225888 Alteration · LOC Issued · 05/21/2025
Project M01121838 Alteration · LOC Issued · 10/07/2024
Project M01078259 Alteration · LOC Issued · 08/07/2024
Project M01090734 Alteration · LOC Issued · 08/06/2024
Project M01078251 Alteration · LOC Issued · 07/23/2024
Project M00896723 Alteration · LOC Issued · 03/29/2024
Project M00615293 Alteration · LOC Issued · 10/22/2021
Project M00507660 Alteration · LOC Issued · 04/22/2021
Project M00434481 Alteration · LOC Issued · 02/10/2021
Project M00434488 Alteration · LOC Issued · 02/10/2021
Project M00439355 Alteration · LOC Issued · 02/09/2021
Project M00362808 Alteration · LOC Issued · 06/30/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 754 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch11
09/03/2026M00507660-I1Request digital key ↗
09/03/2026M00615293-I1Request digital key ↗
08/27/2026M00896723-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00434488-P4Request digital key ↗
09/04/2026M00434488-P3Request digital key ↗
09/04/2026M00434488-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/04/2026M00434488-P3Request digital key ↗
09/04/2026M00434488-P4Request digital key ↗
09/04/2026M00434488-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026M00434481-P1Request digital key ↗
08/15/2026M00434481-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/04/2026M00362808-I1Request digital key ↗
08/15/2026M00439355-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00334026-I1Request digital key ↗
▸Applications & Permits180
▸BISPLAN / WORK APPROVAL APPLICATION88
03/04/2023100123527Open ↗
02/15/2023121204632Open ↗
12/30/2022121124728Open ↗
Showing 3 of 88 on file for this type
▸BISWORK PERMIT APPLICATION74
06/07/2021121204632Open ↗
07/01/2020140840516Open ↗
07/01/2020140840516Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWLPC Approval/Permit12
09/05/2026M00334026-I1Open ↗
09/04/2026M00434488-P3Open ↗
09/04/2026M00434488-P2Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
01/12/2022121204632Open ↗
06/01/2021121204632Open ↗
06/01/2021121204632Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZRD1-Zoning Resolution Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
05/24/2021121204632Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/24/2021121204632Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
05/24/2021121204632Open ↗
▸BISVERIFY TAX LOT1
09/30/2022121204632Open ↗
▸Seals & Professional Certifications159
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION86
01/23/2020123721071Open ↗
05/20/2019123721071Open ↗
05/20/2019123721071Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/02/2026M00507660-I1Open ↗
09/02/2026M00362808-I1Open ↗
09/02/2026M00362808-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00334026-I1Open ↗
09/04/2026M00439355-I1Open ↗
09/04/2026M00434481-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/16/2019123721071Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M00507660-I1Open ↗
09/02/2026M00362808-I1Open ↗
09/02/2026M00362808-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/16/2019123721071Open ↗
04/04/2019140840516Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/04/2019140840516Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/04/2019140840516Open ↗
▸Trade Schedules & Equipment48
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
09/09/2015122017263Open ↗
09/02/2015122017263Open ↗
Showing 2 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
01/22/2019122051643Open ↗
Showing 1 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
05/24/2021121204632Open ↗
02/06/2019121204632Open ↗
▸BISSTREET TREE SIGNOFF1
09/30/2022121204632Open ↗
▸Environmental & Asbestos25
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
05/24/2021121204632Open ↗
12/04/2019123721071Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00615293-I1Open ↗
08/15/2026M00439355-I1Open ↗
08/15/2026M00434481-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026M00896723-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/10/2022140840516Open ↗
11/05/2021121204632Open ↗
04/04/2019140840516Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/16/2019123721071Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00615293-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY10
03/23/2022123721071Open ↗
02/10/2022140840516Open ↗
11/05/2021121204632Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISConcrete Design Mix - 2008 CODE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs110
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/04/2026M00434488-P2Open ↗
09/04/2026M00434488-P3Open ↗
09/04/2026M00434488-P1Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
12/28/2022121615243Open ↗
12/20/2022102179054Open ↗
12/20/2022121615243Open ↗
Showing 3 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
01/03/2023121535320Open ↗
12/22/2022102179054Open ↗
12/22/2022102179063Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLANDMARKS APPROVAL17
05/24/2021121204632Open ↗
12/04/2019121105455Open ↗
12/04/2019121105455Open ↗
Showing 3 of 17 on file for this type
▸BISLANDMARKS SIGNOFF9
02/14/2023121204632Open ↗
01/03/2023121535320Open ↗
12/21/2022102179063Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
11/22/2021121204632Open ↗
11/18/2021121204632Open ↗
05/11/2021121204632Open ↗
Showing 3 of 5 on file for this type
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
10/11/2018121713814Open ↗
09/30/2015121713814Open ↗
▸BISFINAL2
11/08/2022121615243Open ↗
09/01/2022121535320Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT35
02/10/2022140840516Open ↗
08/26/2020121713814Open ↗
01/23/2020123721071Open ↗
Showing 3 of 35 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
03/14/2023121204632Open ↗
03/23/2022123721071Open ↗
11/08/2021121535320Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
05/24/2021121204632Open ↗
▸Filing & Intake Forms84
▸BISADDITIONAL INFORMATION45
12/21/2021121204632Open ↗
10/08/2021121204632Open ↗
06/01/2021121204632Open ↗
Showing 3 of 45 on file for this type
▸BISEFILING COVER SHEET32
05/16/2019123721071Open ↗
Showing 1 of 32 on file for this type
▸BISBOROUGH INTAKE FORM7
07/01/2020140840516Open ↗
07/01/2020140840516Open ↗
01/21/2020123721071Open ↗
Showing 3 of 7 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
05/17/2019123721071Open ↗
Showing 1 of 12 on file for this type
▸BISTax Abatement Miscellaneous5
12/20/2022102179054Open ↗
12/20/2022121615243Open ↗
12/20/2022102179045Open ↗
Showing 3 of 5 on file for this type
▸BISSupporting Document: Fee Exempt1
05/24/2021121204632Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026M00896723-I1Open ↗