DOB04/05/2019VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2017 INSPECTIO N/TEST
DOB07/10/2011MATTERS NOT PROVIDED
DOB01/13/1997V-DOB VIOLATION - ACTIVE
DOB08/16/1993VP-VIOLATION UNSERVED ECB-ACTIVE
ECB12/02/2022FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY28-302.4 FOR CONTROL#907675.SUBMIT ACCEPTABLE REQUIRED TECHNICAL REPONothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001985 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATIONNothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001993 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATIONNothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001999 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATION.Nothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001996 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATIONNothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000320 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATIONNothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000322 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATIONNothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000323 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATIONNothing owed — awaiting certificate of correction
ECB06/20/2017FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001991 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATIONNothing owed — awaiting certificate of correction
ECB09/21/2015FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE WITH CODEPROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DEPARTMNT OF BUILDINGS RULES AND RENothing owed — awaiting certificate of correction
ECB12/02/2014FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULATNothing owed — awaiting certificate of correction
ECB01/28/1999FAILURE TO MAINTAIN. DEFECT IS BROKEN WATER LINE TO BOYS BATHROOM, NONOPERABLE. REPAIR BROKEN WATER LINE.Nothing owed — awaiting certificate of correction
ECB01/28/1999FAILURE TO MAINTAIN. DEFECT IS WINDOWS THROUGHOUT NON OPERABLE, NO VENTILATION THRU OUT SCHOOL AND ADMIN OFFICES. REPAIR OR REPLACE WINDOWS.Nothing owed — awaiting certificate of correction