← Back
Miscellaneous two family
10-12 47 ROAD
QUEENS · BIN 4000298
💬 Discuss this project
1911Year Built
2Stories
B9Building Class
M1-4/R6BZoning
1,600 sfGross Floor Area
2Units
Miscellaneous two family · 2,500 sf lot · 0.64 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
1 job · most recent 02/14/2026
Sprinkler System
FiledStatusContractorScope
02/14/2026——Sprinkler System
1 job · most recent 02/14/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/14/2026——Storm, Water/Sanitary
1 job · most recent 02/14/2026
FiledStatusContractorScope
02/14/2026——1 scope_items
Building Lifecycle
All (42)Filed (7)Objection (5)Special Inspection (30)
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
02/22/2026
Objection raised — Other
02/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing hydraulically design sprinkler system for 3-story, 2-family building.
Q01303237-S5
02/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing hydraulically design sprinkler system for 3-story, 2-family building.
Q01303237-S4
02/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing hydraulically design sprinkler system for 3-story, 2-family building.
Q01303237-S3
02/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/05/2026
Special inspection requirement — Footing and Foundation
02/05/2026
Special inspection requirement — Final
02/05/2026
Special inspection requirement — Subgrade Inspections
02/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/05/2026
Special inspection requirement — Subgrade Inspections
02/05/2026
Special inspection requirement — Underpinning
02/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/03/2026
Special inspection requirement — Underpinning
02/03/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
01/20/2026
Special inspection requirement — Final
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/20/2026
Special inspection requirement — Footing and Foundation
12/02/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing hydraulically design sprinkler system for 3-story, 2-family building.
Q01303237-S2
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/01/2025
Special inspection requirement — Sprinkler Systems
11/14/2025
Objection raised — Scope
11/14/2025
Objection raised — Zoning
10/30/2025
Special inspection requirement — Metering
10/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing hydraulically design sprinkler system for 3-story, 2-family building.
Q01303237-I1
10/22/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing hydraulically design sprinkler system for 3-story, 2-family building.
Q01303237-S1
10/16/2025
Filed — Alteration
Q01303638-I1
10/16/2025
Special inspection requirement — Permanent certificate
10/16/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
10/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/16/2025
Special inspection requirement — Maintenance information
10/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/15/2025
Special inspection requirement — Permanent certificate
10/15/2025
Special inspection requirement — Fenestration areas
10/15/2025
Special inspection requirement — Air barrier — testing
10/15/2025
Special inspection requirement — Insulation placement and R values
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THFC REALTY203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2024$1.4M—Private party → Private party$875/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C602/14/2026
SIDERIS KEFALAS ENGINEERS PC112/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1203/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
02/05/2026Excavations - Sheeting, Shoring, and Bracing—special
02/05/2026Footing and Foundation—progress
02/05/2026Final—progress
02/05/2026Subgrade Inspections—special
02/05/2026Structural Stability – Alterations of existing buildings—special
02/05/2026Subgrade Inspections—special
02/05/2026Underpinning—special
02/05/2026Structural Stability – Alterations of existing buildings—special
02/03/2026Underpinning—special
02/03/2026Underpinning and alternate methods of support of buildings and adjacent property—special
01/20/2026Final—progress
01/20/2026Structural Stability – Alterations of existing buildings—special
01/20/2026Footing and Foundation—progress
12/02/2025Fire-Resistant Penetrations and Joints—special
12/01/2025Sprinkler Systems—special
10/30/2025Metering—energy_progress
10/16/2025Permanent certificate—energy_progress
10/16/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
10/16/2025Fire-Resistant Penetrations and Joints—special
10/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
10/16/2025Energy Code Compliance Inspections—progress
10/16/2025HVAC-R and service water heating equipment—energy_progress
10/16/2025HVAC-R and service water piping design and insulation—energy_progress
10/16/2025Maintenance information—energy_progress
10/16/2025HVAC-R and service water heating system controls—energy_progress
Latest 25 of 54.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/18/2026Q01303638-I1Request digital key ↗
08/18/2026Q01303237-S3Request digital key ↗
08/18/2026Q01303237-S4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
10/24/2025440825822Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/24/2025440825822Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01303237-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01303237-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026Q01303638-I1Open ↗
08/18/2026Q01303237-S5Open ↗
08/18/2026Q01303237-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/24/2025440825822Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/24/2025440825822Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01303237-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
10/24/2025440825822Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01303237-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/18/2026Q01303237-I1Open ↗
08/18/2026Q01303237-S4Open ↗
08/18/2026Q01303237-S3Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01303237-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01303237-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01303237-S5Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/24/2025440825822Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/24/2025440825822Open ↗
▸Other Documents4
▸BISBPP - SUPPORTING DOCUMENTATION1
10/24/2025440825822Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01303237-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01303237-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01303237-I1Open ↗