Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBunnyhill Daycare & Preschool202p · 2 filings · 20 docs
ArchitectureElectricalEquipmentGeneralPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural
Project Q00563894Signed-off · 07/23/2025
PROPOSED HORIZONTAL ENLARGEMENT FOR THE EXISTING 2 STORY BUILDING TO A 2 STORY W/PENTHOUSE BUILDING FOR COMMUNITY FACILITY USE. INTERIOR AND EXTERIOR WORK AS PER PLAN, OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
On file for this project
161 documents
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
BulkheadUtokilen LLC1p · 1 filing · 12 docs
Plumbing
PROPOSE PLUMBING WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
PenthouseBunnyhill Daycare & Preschool227p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
Project Q00563894Signed-off · 07/23/2025
PROPOSED HORIZONTAL ENLARGEMENT FOR THE EXISTING 2 STORY BUILDING TO A 2 STORY W/PENTHOUSE BUILDING FOR COMMUNITY FACILITY USE. INTERIOR AND EXTERIOR WORK AS PER PLAN, OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
On file for this project
161 documents
PROPOSE PLUMBING WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
INSTALLATION OF NEW SPRINKLER SYSTEM PER PLAN. THERE IS NO CHANGE OF USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 2Utokilen LLC1p · 1 filing · 6 docs
Mechanical
Issued Permit Scope
Mechanical Systems
PROPOSE MECHANICAL WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894, and DOB application Q00646907, Q00613898. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
6 documents
Floor 1Bunnyhill Daycare & Preschool246p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Support of Excavation
Project Q00563894Signed-off · 07/23/2025
PROPOSED HORIZONTAL ENLARGEMENT FOR THE EXISTING 2 STORY BUILDING TO A 2 STORY W/PENTHOUSE BUILDING FOR COMMUNITY FACILITY USE. INTERIOR AND EXTERIOR WORK AS PER PLAN, OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
On file for this project
161 documents
PROPOSE MECHANICAL WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894, and DOB application Q00646907, Q00613898. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
6 documents
PROPOSE PLUMBING WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
12 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
MezzanineBunnyhill Daycare & Preschool190p · 2 filings · 20 docs
ArchitectureGeneralPlumbingStructural
Issued Permit Scope
General Construction · Structural
Project Q00563894Signed-off · 07/23/2025
PROPOSED HORIZONTAL ENLARGEMENT FOR THE EXISTING 2 STORY BUILDING TO A 2 STORY W/PENTHOUSE BUILDING FOR COMMUNITY FACILITY USE. INTERIOR AND EXTERIOR WORK AS PER PLAN, OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
On file for this project
161 documents
PROPOSE PLUMBING WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
CellarBunnyhill Daycare & Preschool132p · 3 filings · 20 docs
ArchitectureCivilElectricalGeneralPlumbingStructural
Issued Permit Scope
Earth Work · General Construction · Plumbing
Project Q00563894Signed-off · 07/23/2025
PROPOSED HORIZONTAL ENLARGEMENT FOR THE EXISTING 2 STORY BUILDING TO A 2 STORY W/PENTHOUSE BUILDING FOR COMMUNITY FACILITY USE. INTERIOR AND EXTERIOR WORK AS PER PLAN, OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
On file for this project
161 documents
PROPOSE PLUMBING WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
12 documents
Project Q85264156Signed-off · 10/17/2024
PROPOSE PLUMBING WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
BasementBunnyhill Daycare & Preschool4p · 1 filing · 20 docs
Architecture
Project Q00563894Signed-off · 07/23/2025
PROPOSED HORIZONTAL ENLARGEMENT FOR THE EXISTING 2 STORY BUILDING TO A 2 STORY W/PENTHOUSE BUILDING FOR COMMUNITY FACILITY USE. INTERIOR AND EXTERIOR WORK AS PER PLAN, OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
On file for this project
161 documents
Site & exteriorUtokilen LLC32p · 4 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralPlumbingStructural
Issued Permit Scope
Construction Fence · Plumbing · Sidewalk Shed · Supported Scaffold
PROPOSE PLUMBING WORKS AS PER PLAN IN CONJUNCTION WITH ARCHITECTURAL DESIGN UNDER DOB NOW ALT 1 APPLICATION #Q00563894. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
On file for this project
12 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 10 drawing sheets
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
On file for this project
2 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Filed — no permit issued3p · 1 filing · 9 docs
GeneralPlumbing
Installation of a 80,000 BTU/HR cogeneration system to provide domestic hot water to the building with utilization of the existing low pressure gas line and installation of require tanks and service water piping.
On file for this project
9 documents · 3 drawing sheets