DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
ECB07/17/200750A,B,C.CLEAVER BROOKS FISH.700HP,NB 9782,OIL,1999.50A-CONSISTENT BUILD UP OF 08H DEPOSITS IN FURNACE & FIRST PASS TUBE BANK OF THE OPERATING BOILER LABORATORY ANALYSIS OF FUEL OIL & PRODUCTS OF COMBUSTION REQUNothing owed — awaiting certificate of correction
ECB07/17/200750A,50B,50C.CLEAVER BROOKS FISON 700 HP,NB 9742,OIL,1999.50A-HEAVY ASH DEPOSITS ON FURNACE CYLINDER FIRST PASS FIRE TUBE BANK & ASSOCIATED TUBE SHEETS LABORATORY ANALYSIS OF # 6 RESIDUE FUEL OIL & ASH DEPOSITSNothing owed — awaiting certificate of correction
ECB03/30/200149 CLEAVER BROOKS HIGH PRESSURE BOILER NO LADDER AND PLATFORM FOR BOILER.HEIGHT FROM FLOOR TO TOP OF BOILER OVER 8 FEET OPERATOR CANNOT ACCESS TOP OF BOILER TO SECURE BOILER FROM SYSTEM.Nothing owed — awaiting certificate of correction
ECB03/30/200149 CLEAVER BROOKS HIGH PRESSURE BOILER NO LADDER AND PLATFORM FOR BOILER HEIGHT FROM FLOOR TO TOP OF BOILER OVER 8 FEET OPERATOR CANNOT ACCESS TOP OF BOILER,TOP OF BOILER TO SECURE BOILER FROM SYSTEM.Nothing owed — awaiting certificate of correction