← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
Bsl One
10 BAY STREET LANDING · BIN 5110065
💬 Discuss this project
1984Year Built
9Stories
D0Building Class
C4-2Zoning
171,935 sfGross Floor Area
128Units
Rent Stabilized11 Active Violations 10 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: BSL One Owners · 40,000 sf lot · 4.3 FAR built
Locations of Work
ArchitectureStructuralEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLimited exterior repairs and sealant replacement1p · 1 filing · 3 docs
Floor 7Limited exterior repairs and sealant replacement6p · 1 filing · 3 docs
Floor 6Limited exterior repairs and sealant replacement6p · 1 filing · 3 docs
Floor 5Limited exterior repairs and sealant replacement6p · 1 filing · 3 docs
Floor 4Limited exterior repairs and sealant replacement6p · 1 filing · 3 docs
Floor 3Limited exterior repairs and sealant replacement6p · 1 filing · 3 docs
Floor 2Limited exterior repairs and sealant replacement6p · 1 filing · 3 docs
Floor 1Limited exterior repairs and sealant replacement6p · 1 filing · 3 docs
Site & exteriorLimited exterior repairs and sealant replacement11p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSL One Owners1103/21/2026
Terrace Gardens Plaza503/22/2026
10 Bay St Landing103/21/2026
Phoenix103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services102/21/2024
SW Engineering Company101/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Boyd Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sambar ElectricElectrical103/21/2026
Elpo Electrical ContgElectrical103/21/2026
True ElectricElectrical103/21/2026
Sortino JosephElectrical103/21/2026
Jepol ConstructionGeneral Contractor107/08/2026
Phoenix Sutton STRScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL Engineering Inspectio6912101/12/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/02/2026
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 8I UPPER LEVEL, 8th STORY,…
HPD violation · open
09/02/2026
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED…
HPD violation · open
08/30/2026
§ 26-1103 admin. Code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys…
HPD violation · open
08/30/2026
§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that…
HPD violation · open
154 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedJepol Construction08/29/2024
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP06/21/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR02/22/2024
BISMHISSUEDScaran Oil Service09/25/2018
BISPLISSUEDBell Fuel Oil07/18/2017
BISEQISSUEDPhoenix Sutton STR10/27/2016
BISPLISSUEDRichmond Plumbing & Heating Co09/15/2016
BISPLISSUEDRJ Bruno01/24/2012
BISOTISSUEDSignature Kitchens of N.Y01/10/2012
BISPLISSUEDFleet Plumbing and Heating10/13/2011
BISEQISSUEDSteel Insustries12/03/2009
BISPLISSUEDGreat City Plumbing & Heating04/06/2009
BISOTISSUEDGreat Will Construction02/10/2009
BISEQISSUEDSteel Industries07/30/2008
BISEQISSUEDSteel Industries07/30/2008
BISMHISSUEDScaran Plumbing05/08/2008
BISPLISSUEDDC Building Services07/30/2007
BISOTISSUEDGMB Contruction06/27/2007
BISPLISSUEDCapital Contracting P&H12/07/2006
BISOTISSUEDMark D Lipton Associates11/16/2006
BISOTISSUEDHalo Restoration07/25/2000
BISOTISSUEDApollon Waterproof & Restoration08/16/1994
BISOTISSUEDApollon Waterproof & Restoration07/14/1993
BISOTISSUEDApollon Waterproof & Restoration01/13/1993
BISOTISSUEDApollon Waterproof & Restoration02/25/1992
4 projects · most recent 10/24/2024
General Wiring
FiledStatusContractorScope
10/24/2024Permit IssuedFusiontech Commercial DbaGeneral Wiring
02/19/2024CompleteElpo Electrical Contg—
11/24/2021CompleteResponse ElectricGeneral Wiring
01/29/2020CompleteEverest Electrical Contracting—
Nothing on file for this building.
144 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account