| Firm | Filings | Most Recent |
|---|---|---|
| SANNA & LOCCISANO ARCHITECTS, P.C. | 5 | 04/03/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| SANNA LOCCISANO ARCHITECTS P C | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JB BUZCO PLUMBING, LLC | General Contractor | 4 | 03/21/2026 |
| MAXIMUM CONTRACTING INC | General Contractor | 3 | 07/08/2026 |
| RELIABLE PLBG & HTG CORP | Plumbing | 3 | 07/08/2026 |
| NOCE CONSTRUCTION CORP | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| A TECH ENGINEERING NYC, P | 6738 | 3 | 04/03/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | MAXIMUM CONTRACTING INC | 05/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MAXIMUM CONTRACTING INC | 04/03/2026 |
| DOB NOW | Plumbing | Permit Issued | RELIABLE PLBG & HTG CORP | 03/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MAXIMUM CONTRACTING INC | 05/27/2025 |
| DOB NOW | Plumbing | Permit Issued | RELIABLE PLBG & HTG CORP | 04/22/2025 |
| DOB NOW | Plumbing | Permit Issued | RELIABLE PLBG & HTG CORP | 04/24/2024 |
| DOB NOW | General Construction | Permit Issued | JB BUZCO PLUMBING, LLC | 04/22/2024 |
| DOB NOW | Earth Work | Permit Issued | JB BUZCO PLUMBING, LLC | 04/18/2024 |
| DOB NOW | Construction Fence | Permit Issued | TOTAL BLD & CONO MAIN INC | 08/10/2021 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/03/2024 | Permit Issued | MAXIMUM CONTRACTING INC | Air Conditioning Systems, Generators, Ventilation Systems | Cooling Daikin FXTQ18PAVJU- (1)AIR HANDLER FOR BASEMENT, (2) FOR FIRST FLOOR 18,000 BTU · Vrf Indoor ×3 FXTQ48TAVJUA- (1) AIR HANDLER FOR BASEMENT, (1) FOR FIRST FLOOR 4 tons · Vrf Indoor ×2 RXTQ60TAVJUA- CONDENSING UNITS FOR BASEMENT AND SECOND FLOOR 5 tons · Vrf Outdoor ×2 FXTQ24TAVJUA- AIR HANDLER FOR SECOND FLOOR 2 tons · Vrf Indoor ×1 FXTQ36TAVJUA- AIR HANDLER FOR SECOND FLOOR 3 tons · Vrf Indoor ×1 FXTQ36TAVJUA- CONDENSING UNIT FOR FIRST FLOOR 3 tons · Vrf Indoor ×1 RXTQ48TAVJUA- CONDENSING UNIT FOR FIRST FLOOR 4 tons · Vrf Outdoor ×1 Ventilation Broan ERV 200 ECM- ERV FOR BASEMENT AND FIRST FLOOR 200 CFM · Erv ×2 B150E75- ERV FOR SECOND FLOOR 200 CFM · Erv ×1 Generators Generac RG030 30 kW · Generator ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/03/2024 | Permit Issued | RELIABLE PLBG & HTG CORP | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/21/2025 | Permit Issued | FLIP CITY ELECT & FIRE LL | General Wiring |
| 03/26/2024 | Permit Issued | FLIP CITY ELECT & FIRE LL | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2021 | Permit Issued | NOCE CONSTRUCTION CORP | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/21/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/31/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/12/2026 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 03/12/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 05/06/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/06/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/26/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/07/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/19/2024 | Concrete - Cast-In-Place | anthony santoro | special |
| 03/19/2024 | Emergency and Standby Power Systems (Generator) | anthony santoro | special |
| 03/19/2024 | Fire-Resistant Penetrations and Joints | anthony santoro | special |
| 03/19/2024 | Heating Systems | anthony santoro | special |
| 03/19/2024 | Mechanical Systems | anthony santoro | special |
| 03/19/2024 | Structural Steel - Details | anthony santoro | special |
| 03/19/2024 | Structural Steel - High Strength Bolting | anthony santoro | special |
| 03/19/2024 | Structural Steel - Welding | anthony santoro | special |
| 03/19/2024 | Subgrade Inspections | anthony santoro | special |
| 03/19/2024 | Subsurface Investigations (Borings/Test Pits) | anthony santoro | special |
| 03/19/2024 | Wood – Prefabricated I-Joists | anthony santoro | special |
| 03/19/2024 | Wood – Seismic Resistance | anthony santoro | special |
| 03/19/2024 | Energy Code Compliance Inspections | anthony santoro | progress |
| 03/19/2024 | Final | anthony santoro | progress |
| 03/19/2024 | Fire-Resistance Rated Construction | anthony santoro | progress |
| 03/19/2024 | Footing and Foundation | anthony santoro | progress |
| 03/19/2024 | Structural Wood Frame | anthony santoro | progress |
| 03/19/2024 | Electric vehicle service equipment requirements | anthony santoro | energy_progress |
| 03/19/2024 | Maintenance information | anthony santoro | energy_progress |
| 03/19/2024 | Fenestration and door U-factor and product ratings | anthony santoro | energy_progress |
| 03/19/2024 | HVAC-R and service water heating system controls | anthony santoro | energy_progress |
| 03/19/2024 | Metering | anthony santoro | energy_progress |
| 03/19/2024 | Air barrier — testing | anthony santoro | energy_progress |
| 03/19/2024 | Permanent certificate | anthony santoro | energy_progress |
| 03/19/2024 | HVAC-R and service water piping design and insulation | anthony santoro | energy_progress |