| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/01/2026 | Permit Issued | PAR PLUMBING CO., INC | Heating and Air Conditioning Systems | Heat / Cool Trane BCHE024 800 CFM · Ahu ×1 |
| 08/31/2026 | Permit Issued | A. BONADUCE, INC | Heating and Air Conditioning Systems | Heat / Cool |
| 08/04/2026 | Permit Issued | CROSS MANAGEMENT CORP | Heating Systems | Heating N/A na 1 CFM ×1 |
| 07/07/2026 | Permit Issued | CARKEN CONT & DEV LLC | Ventilation Systems | Ventilation International Enviro-Tec HLP-D 32,600 BTU ×2 |
| 06/30/2026 | — | — | Ventilation Systems | |
| 06/23/2026 | Signed-off | MYRIAD CONSTRUCTION SERVI | Air Conditioning Systems | Cooling |
| 03/05/2026 | Permit Issued | TRANE U.S. INC | Heating Systems | Heating Trane MXCA0604HXIAAXXXXWXX1FYXA1AXNZ 750,000 BTU · Wshp ×8 |
| 03/02/2026 | Signed-off | DSA BUILDERS INC | Heating and Air Conditioning Systems | Heat / Cool Iec CPY-06 343 CFM · Fan Coil Indoor ×20 MBY-10 753 CFM · Fan Coil Indoor ×8 HPY-10 1,005 CFM · Fan Coil Indoor ×4 |
| 02/27/2026 | Signed-off | STANDARD FIRE PROTECTION | Heating and Air Conditioning Systems | Heat / Cool Iec HPY 16 1,649 CFM · Fan Coil Indoor ×1 |
| 08/14/2025 | Permit Issued | LINKED MECHANICAL LLC | Air Conditioning Systems | Cooling Iec MSY-08 550 CFM · Fan Coil Indoor ×2 CHY-08 400 CFM · Fan Coil Indoor ×1 MSY-12 1,050 CFM · Fan Coil Indoor ×1 |
| 06/27/2025 | Signed-off | FOLOR INC | Heating and Air Conditioning Systems | Heat / Cool Trane BCHD024 26,770 BTU · Ahu ×1 |
| 03/31/2025 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Cooling Towers, Heating Systems, Refrigeration Systems | Cooling Nortek Ventrol 239,200 CFM · Ahu ×36 Liebert CW041DC 406,100 BTU · Crac Unit ×10 MMD23CDPR0 14,700 BTU · Ahu ×8 CW106D 406,100 BTU · Ahu ×6 Lg LMU480HV LMN249HVT 18,000 BTU · Vrf Outdoor ×8 Aaon H3CRB3024DC000 3,000 CFM · Rooftop Unit ×2 Pace PAI-78x114 20,000 CFM · Ahu ×2 Ventilation Pace PAI-39x66 5,000 CFM ×2 Refrigeration Tsi S10-1A 30A2SD300-QL
S10-1B 30A2SD280-QR 400 tons · Air Cooled Chiller ×4 S10-2A 30A2SD300-QL S10-2B 30A2SD280 -QR 400 tons · Air Cooled Chiller ×4 York YKIBKSH9-EYGS 1,000 tons · Chiller ×6 Cooling Tower Spx NC8411VAN 237,900 CFM · Cooling Tower ×8 |
| 03/24/2025 | Permit Issued | APS BUILDERS INC | Others | Other Nortek RH2+ 2,140 CFM ×3 |
| 11/15/2022 | Signed-off | STREAMLINE USA LLC | Ventilation Systems | Ventilation Greenheck SQ-99 600 CFM · Exhaust Fan ×2 Loren Cook CPS_225 CLASS_2 8,538 CFM · Exhaust Fan ×2 Parker PSG-232L-DDB 8,538 CFM ×2 |
| 10/28/2022 | — | — | Associated Ducts and Piping, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 08/31/2026 | Permit Issued | GO GREENER PLUMBING LLC | 164 heads |
| 07/07/2026 | Permit Issued | FIVE BOROUGH NYC LLC | Sprinkler System |
| 06/30/2026 | — | — | Sprinkler System |
| 09/17/2025 | Signed-off | FULL CAPACITY FIRE CORP | 2 heads |
| 08/14/2025 | Signed-off | UNIVERSAL FIRE SPR LLC | Sprinkler System |
| 03/24/2025 | Signed-off | ACCURATE MECHANICAL INC | Sprinkler System |
| 03/14/2025 | Permit Issued | UNITED PLBG MECHANICAL IN | 26 heads |
| 10/28/2022 | — | — | Sprinkler System |
| 10/27/2021 | Signed-off | ASCO SPRINKLER COMPANY, INC | 44 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 08/31/2026 | Permit Issued | GO GREENER PLUMBING LLC | Water/Sanitary |
| 07/07/2026 | Permit Issued | RELIABLE PLBG & HTG CORP | Water/Sanitary |
| 06/30/2026 | — | — | Gas, Water/Sanitary |
| 05/13/2026 | Permit Issued | PAR PLUMBING CO., INC | Gas |
| 03/02/2026 | Signed-off | FRANKIE PLBG & HTG L.L.C | Gas, Water/Sanitary |
| 08/14/2025 | Permit Issued | GANIC PLUMBING & HTG INC | Water/Sanitary |
| 03/24/2025 | Permit Issued | SERVICE TECH MECH&PLBG IN | Gas, Water/Sanitary |
| 02/05/2024 | Permit Issued | ADVANCED PLUMBING MECH | Gas, Water/Sanitary |
| 10/28/2022 | — | — | Water/Sanitary |
| 08/04/2021 | Signed-off | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | SRM ELECTRICAL SVC INC | General Wiring |
| 09/21/2026 | Permit Issued | PRECISION ELECL CONT CORP | General Wiring |
| 09/03/2026 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 07/20/2026 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring, Lighting |
| 07/20/2026 | Permit Issued | BIGMAN BROS., INC. | General Wiring |
| 06/18/2026 | Permit Issued | ACM ELECTRIC CORPORATION | General Wiring |
| 06/17/2026 | Permit Issued | POC ELECTRICAL CONTNG INC | General Wiring |
| 04/27/2026 | Permit Issued | UNITY ELECTRIC CO., Inc | 6 meters |
| 03/16/2026 | Complete | GILSTON BROTHERS ELECT'L | General Wiring |
| 01/21/2026 | Complete | MULTI-PHASE ELEC'L SVCS | General Wiring |
| 12/30/2025 | Permit Issued | ICON ELECTRIC INC | General Wiring |
| 11/09/2025 | Permit Issued | CRESCO ELECTRICAL CORP | General Wiring |
| 09/30/2025 | Complete | UNITY ELECTRIC CO. INC | — |
| 08/14/2025 | Complete | RIVERDALE ELECTRIC CORP | General Wiring |
| 08/13/2025 | Complete | FOREST BROOK ELEC'L CONTR | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/31/2026 | Permit Issued | A. BONADUCE, INC | Steel |
| 06/30/2026 | — | — | Steel, Concrete |
| 10/28/2022 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Permit Issued | CROSS MANAGEMENT CORP | Tenant Protection Plan 72 Hour |
| 06/23/2026 | Signed-off | MYRIAD CONSTRUCTION SERVI | Tenant Protection Plan 72 Hour |
| 08/14/2025 | Permit Issued | LINKED MECHANICAL LLC | Tenant Protection Plan 72 Hour |
| 06/27/2025 | Signed-off | FOLOR INC | Tenant Protection Plan 72 Hour |
| Owner | Filings | Most Recent |
|---|---|---|
| THE SHOPS AT COLUMBUS CIRCLE | 288 | 09/25/2026 |
| ICD COLUMBUS CENTRE HOTEL LLC | 13 | 09/15/2026 |
| RELATED MANAGEMENT | 89 | 09/13/2026 |
| WHOLE FOODS MARKET | 12 | 07/08/2026 |
| COLUMBUS CIRCLE CONDOMINIUM ASSOCIA | 5 | 07/08/2026 |
| RELATED COMPANIES | 84 | 07/08/2026 |
| RELATED RETAIL | 5 | 07/08/2026 |
| NORTHROP GRUMMAN SYSTEMS CORP. | 4 | 07/08/2026 |
| NIRTOSAL | 10 | 04/09/2026 |
| SPRING SCAFFOLDING LLC | 9 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| NEW YORK ENGINEERS LLC | 2 | 09/01/2026 |
| CARUSO TURLEY SCOTT, INC | 1 | 08/31/2026 |
| BACON LANE ARCHITECT, LLC | 1 | 08/19/2026 |
| MORAN HOOK ARCHITECTURE, PLLC | 1 | 08/11/2026 |
| AMA CONSULTING ENGINEERS, PC | 4 | 08/04/2026 |
| ORSAR ENGINEERING | 2 | 07/07/2026 |
| NAPACH DESIGN GROUP | 1 | 07/07/2026 |
| BUROHAPPOLD | 4 | 06/30/2026 |
| HORACIO REPETTO | 4 | 06/24/2026 |
| THORNTON TOMASETTI | 5 | 06/23/2026 |
| HANINGTON ENGINEERING CONSULTANTS | 3 | 06/23/2026 |
| STONEHILL & TAYLOR ARCHITECTS PC | 2 | 06/22/2026 |
| ADG ARCHITECTURE AND DESIGN PC | 1 | 06/01/2026 |
| AKF ENGINEERS, LLP | 121 | 05/13/2026 |
| BHH ARCHITECTS | 3 | 03/24/2026 |
| LINEA LLP | 4 | 03/19/2026 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 2 | 03/02/2026 |
| THORSON BAKER + ASSOCIATES | 2 | 10/13/2025 |
| SY ENGINEERING PLLC | 9 | 10/07/2025 |
| ANDREW MAASS | 2 | 10/07/2025 |
| GILLEN - KONUK ARCHITECTURE, DPC | 2 | 10/02/2025 |
| TPG ARCHITECTURE, LLP | 4 | 10/01/2025 |
| HOWARD SHAPIRO & ASSOCIATES, P.C. | 1 | 10/01/2025 |
| GENSLER ARCHITECTURE, DESIGN & PLAN | 12 | 09/23/2025 |
| GENSLER | 11 | 09/23/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| HIGH QUALITY 338 | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 175 | 03/21/2026 |
| GILLMAN CONSULTING | 86 | 03/21/2026 |
| BODNAR ARCHITECTURE P C | 10 | 03/21/2026 |
| RPO | 8 | 03/21/2026 |
| Integrated Companies | 2 | 03/21/2026 |
| CODE | 14 | 03/21/2026 |
| CTHREE ARCHITECTURE + DESIGN | 8 | 03/21/2026 |
| RICHARD WAINER ARCHITECT, PLLC | 8 | 03/21/2026 |
| SOL BUILDING CONSULTING SERVICES | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 51 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 26 | 07/08/2026 |
| APS BUILDERS INC | General Contractor | 22 | 07/08/2026 |
| CROSS MANAGEMENT CORP | General Contractor | 21 | 08/18/2026 |
| PAR PLUMBING CO., INC | Plumbing | 15 | 09/25/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 11 | 07/08/2026 |
| ASCO SPRINKLER CO.,INC | Fire Protection | 11 | 07/08/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 10 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 9 | 07/08/2026 |
| RELATED CONSTRUCTION LLC | General Contractor | 9 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 9 | 07/08/2026 |
| BERNHARDT RENOVATION INC | General Contractor | 8 | 07/08/2026 |
| STREAMLINE USA LLC | General Contractor | 8 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 7 | 07/08/2026 |
| HORIZON RETAIL CONSTRUCTI | General Contractor | 7 | 07/08/2026 |
| DSA BUILDERS INC | General Contractor | 7 | 07/08/2026 |
| MYRIAD CONSTRUCTION SERVI | General Contractor | 6 | 04/09/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 5 | 07/08/2026 |
| STEWART SENTER INC | General Contractor | 4 | 07/08/2026 |
| KELCO CONSTRUCTION INC | General Contractor | 4 | 03/21/2026 |
| VERSATILE SERVICES LLC | General Contractor | 4 | 07/08/2026 |
| JAMES AGRESTA CARPENTRY I | General Contractor | 4 | 03/21/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 4 | 07/08/2026 |
| ADVANCED PLUMBING MECH | Plumbing | 4 | 07/08/2026 |
| SERVICE TECH MECH&PLBG IN | Plumbing | 4 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 14 | 09/01/2026 |
| CATALPA SPECIAL INSPECTIO | 2004 | 13 | 08/31/2026 |
| METRIC CONSULTING AND INS | 1803 | 1 | 08/31/2026 |
| BACON LANE ARCHITECT, LLC | 5402 | 1 | 08/19/2026 |
| CODEGREEN | 510 | 4 | 08/04/2026 |
| PHILIBERT ENGINEERING, PC | 223 | 1 | 08/04/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 3 | 07/07/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 36 | 06/24/2026 |
| LINEA LLP | 3155 | 10 | 06/23/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 3 | 10/17/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 09/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 09/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PAR PLUMBING CO., INC | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | E. C. PROVINI CO., INC | 09/21/2026 |
| DOB NOW | Structural | Permit Issued | A. BONADUCE, INC | 09/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | GO GREENER PLUMBING LLC | 09/08/2026 |
| DOB NOW | Plumbing | Permit Issued | GO GREENER PLUMBING LLC | 09/08/2026 |
| DOB NOW | General Construction | Permit Issued | A. BONADUCE, INC | 09/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 08/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CROSS MANAGEMENT CORP | 08/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CARKEN CONT & DEV LLC | 07/23/2026 |
| DOB NOW | Plumbing | Permit Issued | FIVE BOROUGH NYC LLC | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | CARKEN CONT & DEV LLC | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | RELIABLE PLBG & HTG CORP | 07/22/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 07/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AMERICON CONSTRUCTION INC. | 07/07/2026 |
| DOB NOW | General Construction | Permit Issued | AMERICON CONSTRUCTION INC. | 07/07/2026 |
| DOB NOW | General Construction | Signed-off | C & D RESTORATION INC | 06/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LINKED MECHANICAL LLC | 06/09/2026 |
| DOB NOW | Plumbing | Signed-off | FRANKIE PLBG & HTG L.L.C | 06/05/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 06/01/2026 |
| DOB NOW | General Construction | Permit Issued | E. C. PROVINI CO., INC | 05/28/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURECRAFT CONTRACTIN | 05/15/2026 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 03/27/2026 |
| DOB NOW | Mechanical Systems | Signed-off | MYRIAD CONSTRUCTION SERVI | 03/20/2026 |
| DOB NOW | General Construction | Signed-off | MYRIAD CONSTRUCTION SERVI | 03/18/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STANDARD FIRE PROTECTION | 03/18/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURECRAFT CONTRACTIN | 02/23/2026 |
| DOB NOW | Plumbing | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 01/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | TRISTATE PLBG SVCS CORP | 01/14/2026 |
| DOB NOW | General Construction | Permit Issued | NY SIGNATURE BUILDERS LLC | 01/13/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 01/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 01/12/2026 |
| DOB NOW | Sprinklers | Signed-off | UNIVERSAL FIRE SPR LLC | 12/08/2025 |
| DOB NOW | Plumbing | Permit Issued | GANIC PLUMBING & HTG INC | 11/20/2025 |
| DOB NOW | Plumbing | Signed-off | AMERICAN STANDARD P&H CORORP. | 11/13/2025 |
| DOB NOW | General Construction | Permit Issued | NY SIGNATURE BUILDERS LLC | 11/07/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TRANE U.S. INC | 10/21/2025 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 10/09/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | CORE ERECTORS | 10/06/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/16/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/20/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 08/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/03/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/02/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/10/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/20/2026 | Pass-Final Sign Permit Inspection | Pass | View ↗ |
| 01/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/17/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/13/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/28/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 08/25/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 08/11/2026 | Tenant Protection Plan Compliance | Martha Lane | special |
| 08/10/2026 | HVAC-R and service water heating equipment | Lisa Vangelas | energy_progress |
| 08/10/2026 | HVAC-R and service water piping design and insulation | Lisa Vangelas | energy_progress |
| 08/10/2026 | HVAC-R and service water heating system controls | Lisa Vangelas | energy_progress |
| 08/10/2026 | Maintenance information | Lisa Vangelas | energy_progress |
| 08/10/2026 | Final | Lisa Vangelas | progress |
| 08/10/2026 | Mechanical Systems | Lisa Vangelas | special |
| 08/10/2026 | Energy Code Compliance Inspections | Lisa Vangelas | progress |
| 08/10/2026 | Duct leakage testing, insulation and design | Lisa Vangelas | energy_progress |
| 08/03/2026 | Tenant Protection Plan Compliance | Jacky Philibert | special |
| 07/21/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| 07/17/2026 | Mechanical Systems | James Sullivan Jr | special |
| 07/17/2026 | HVAC-R and service water heating equipment | James Sullivan Jr | energy_progress |
| 07/17/2026 | Maintenance information | James Sullivan Jr | energy_progress |
| 07/17/2026 | HVAC-R and service water heating system controls | James Sullivan Jr | energy_progress |
| 07/17/2026 | Final | James Sullivan Jr | progress |
| 06/15/2026 | Post-installed Anchors | Benjamin Plotnick | special |
| 06/15/2026 | Fire-Resistant Penetrations and Joints | Benjamin Plotnick | special |
| 06/02/2026 | Tenant Protection Plan Compliance | — | special |
| 06/02/2026 | Tenant Protection Plan Compliance | — | special |
| 05/29/2026 | Maintenance information | Lisa Vangelas | energy_progress |
| 05/29/2026 | Energy Code Compliance Inspections | Lisa Vangelas | progress |
| 05/29/2026 | Final | Lisa Vangelas | progress |