← Back
Condo, residential unit in 1-3 story building
Bergen Cove Condominium
10 COVE LANE · BIN 3343155
💬 Discuss this project
1997Year Built
3Stories
R3Building Class
R5Zoning
51,259 sfGross Floor Area
65Units
LL97 CoveredRent Stabilized240 Open Violations ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · Owner of record: BERGEN COVE DEVELOPMENT CORP · 39,515 sf lot · 1.3 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER REPRESENTATIVE403/22/2026
BERGEN COVE CONDO III203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC109/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREEN PORTAL INCGeneral Contractor403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267109/20/2022
Building Lifecycle
All (41)Filed (1)Permit Issued (2)Signed Off (1)Violation (24)Objection (6)Special Inspection (7)
05/08/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/13/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/16/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
09/12/2023
Signed off — Alteration
APPLICATION FOR INTERIOR REHAB OF TWO EXISTING DWELLING IN MULTI-FAMILY BUILDING. PARTIAL REPLACEMENT OF WINDOWS AND BALCONY DOORS. NO CHANGE IN USE PROSOSED.
B08002870-I1
03/30/2023
Violation issued (HPD, open)
A
02/17/2023
Permit issued — General Construction
B08002870-I1-GC
01/06/2023
Permit issued — General Construction
B08002870-I1-GC
11/14/2022
Violation issued (HPD, open)
I
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/20/2022
Filed — Alteration
APPLICATION FOR INTERIOR REHAB OF TWO EXISTING DWELLING IN MULTI-FAMILY BUILDING. PARTIAL REPLACEMENT OF WINDOWS AND BALCONY DOORS. NO CHANGE IN USE PROSOSED.
B08002870-I1
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dmitry Levin
09/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Dmitry Levin
09/14/2022
Special inspection requirement — Final
Dmitry Levin
09/14/2022
Special inspection requirement — Air barrier - visual inspection
Dmitry Levin
09/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Dmitry Levin
09/14/2022
Special inspection requirement — Fenestration air leakage
Dmitry Levin
09/14/2022
Special inspection requirement — Interior lighting power
Dmitry Levin
03/08/2022
Violation issued (HPD, open)
I
03/08/2022
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, open)
I
11/04/2019
Violation issued (HPD, open)
I
10/25/2018
Violation issued (HPD, open)
I
12/07/2017
Violation issued (HPD, open)
I
11/25/2016
Violation issued (HPD, open)
I
10/19/2015
Violation issued (HPD, open)
I
03/03/2015
Violation issued (HPD, open)
I
10/17/2006
Violation issued (HPD, open)
B
10/17/2006
Violation issued (HPD, open)
B
10/17/2006
Violation issued (HPD, open)
B
10/17/2006
Violation issued (HPD, open)
B
10/17/2006
Violation issued (HPD, open)
A
10/17/2006
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGREEN PORTAL INC02/17/2023
DOB NOWGeneral ConstructionSigned-offGREEN PORTAL INC01/06/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/19/2022Fire-Resistant Penetrations and JointsDmitry Levinspecial
09/19/2022Energy Code Compliance InspectionsDmitry Levinprogress
09/14/2022FinalDmitry Levinprogress
09/14/2022Air barrier - visual inspectionDmitry Levinenergy_progress
09/14/2022Fenestration and door U-factor and product ratingsDmitry Levinenergy_progress
09/14/2022Fenestration air leakageDmitry Levinenergy_progress
09/14/2022Interior lighting powerDmitry Levinenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026B08002870-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B08002870-I1Open ↗
08/23/2026B08002870-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/28/2026B08002870-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B08002870-I1Open ↗