← Back
One family attached or semi-detached
10 DOREEN DRIVE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5093701
💬 Discuss this project
1988Year Built
2Stories
A5Building Class
R3-2Zoning
953 sfGross Floor Area
1Units
One family attached or semi-detached · 1,305 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC203/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272303/03/2026
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/06/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01303969-I1
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/05/2026
Special inspection requirement — Final
Walid Abdulla
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/05/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/03/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01303969-P1
10/23/2025
Permit issued — Solar
S01303969-I1-SL
10/17/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01303969-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/23/2025
1 project · most recent 10/17/2025
FiledStatusContractorScope
10/17/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/05/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/05/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/05/2026FinalWalid Abdullaprogress
03/05/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/05/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026S01303969-P1Request digital key ↗
08/17/2026S01303969-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026S01303969-I1Open ↗
08/29/2026S01303969-I1Open ↗
08/29/2026S01303969-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01303969-I1Open ↗
08/13/2026S01303969-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S01303969-I1Open ↗
08/29/2026S01303969-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01303969-I1Open ↗