2024Year Built
2Stories
B2Building Class
R3XZoning
3,186 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
10HOLLY PLACE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT107/31/2024
JOSEPH M. MORACE, A.I.A., ARCHITECT601/29/2024
WILLIAM MONTAGUE ENGINEER109/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS1003/21/2026
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. MANGONE CONSTRUCTIONGeneral Contractor603/21/2026
SKEN SERVICES CORPGeneral Contractor203/21/2026
FINE MECHANICAL CORPPlumbing207/08/2026
MERCURY FIRE SUPP INCFire Protection107/08/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802107/31/2024
AVT ENGINEERING345201/29/2024
SRA PLANNING & EXPEDITING5677109/26/2023
Building Lifecycle
All (63)Filed (8)Permit Issued (8)Signed Off (5)Inspection (12)Special Inspection (30)
11/14/2024
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S01087433-I1
08/05/2024
Permit issued — Solar
S01087433-I1-SL
07/31/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
S01087433-I1
07/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
07/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
07/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
07/28/2024
Special inspection requirement — Final
Chun Feng
07/28/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
02/26/2024
Signed off — Alteration
PROPOSED 2" DOMESTIC WITH SP TAKE OFF
S00939527-I1
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Subgrade Inspections
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Mechanical Systems
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/06/2024
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Final
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Footing and Foundation
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Structural Wood Frame
JOSEPH PASATURO
02/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH PASATURO
02/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Fenestration areas
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Air barrier - visual inspection
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Electric vehicle service equipment requirements
JOSEPH PASATURO
02/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Fenestration air leakage
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Air barrier — testing
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Interior lighting power
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Protection of exposed foundation insulation
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Ventilation and air distribution system
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Insulation placement and R values
JOSEPH PASATURO
02/06/2024
Special inspection requirement — Permanent certificate
JOSEPH PASATURO
01/30/2024
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00867932-S2
01/30/2024
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00867932-S1
01/29/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00867932-P2
01/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/11/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR THE DEMOLITION OF THE EXISTING BUILDGINS AND FOR THE NEW CONSTRUCTION OF A DETACHED TWO FAMILY HOUSE AND DETACHED ONE CAR GARAGE.
S00863898-I1
01/10/2024
Permit issued — Curb Cut
S00867932-S2-CC
01/09/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00867932-S2
01/04/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00867932-P1
12/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2023
Permit issued — Plumbing
S00939527-I1-EW-SP
10/25/2023
Permit issued — Sprinklers
S00939527-I1-PL
10/24/2023
Permit issued — Mechanical Systems
S00867932-I1-GC-CX
09/26/2023
Filed — Alteration
PROPOSED 2" DOMESTIC WITH SP TAKE OFF
S00939527-I1
09/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/24/2023
Permit issued — Plumbing
S00867932-S1-PL
08/07/2023
Permit issued — Structural
S00867932-I1-GC-CX
08/02/2023
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00867932-S1
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC08/05/2024
DOB NOWCurb CutSigned-offJ. MANGONE CONSTRUCTION01/10/2024
DOB NOWPlumbingSigned-offMERCURY FIRE SUPP INC10/27/2023
DOB NOWSprinklersSigned-offFINE MECHANICAL CORP10/25/2023
DOB NOWMechanical SystemsPermit IssuedJ. MANGONE CONSTRUCTION10/24/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP08/24/2023
DOB NOWStructuralPermit IssuedJ. MANGONE CONSTRUCTION08/07/2023
DOB NOWConstruction FenceSigned-offTT & T CONSTRUCTION INC04/26/2023
BIS—ISSUEDSKEN SERVICES CORP05/23/2023
BISOTISSUEDVENTURE HOME SOLAR LLC05/10/2019
BISOTISSUEDVENTURE HOME SOLAR LLC11/26/2018
1 project · most recent 01/29/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/29/2024Signed-offFINE MECHANICAL CORPGas, Storm, Water/Sanitary
4 projects · most recent 07/31/2024
General Wiring
FiledStatusContractorScope
07/31/2024CompleteI.P. ELECTRIC INC—
10/24/2023CompleteLMS ELECTRICAL CORPGeneral Wiring
02/07/2019CompleteVENTURE HOME SOLAR LLC1 meters, 1 new_meters
12/20/2018CompleteVENTURE HOME SOLAR LLC—
1 project · most recent 01/29/2024
Concrete Wood
FiledStatusContractorScope
01/29/2024Signed-offJ. MANGONE CONSTRUCTIONConcrete, Wood
1 project · most recent 01/29/2024
Earthwork
FiledStatusContractorScope
01/29/2024Signed-offJ. MANGONE CONSTRUCTIONEarthwork
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
12/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
07/28/2024Fire-Resistant Penetrations and JointsChun Fengspecial
07/28/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
07/28/2024Energy Code Compliance InspectionsChun Fengprogress
07/28/2024FinalChun Fengprogress
07/28/2024Air barrier - visual inspectionChun Fengenergy_progress
02/06/2024Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
02/06/2024Subgrade InspectionsJOSEPH PASATUROspecial
02/06/2024Mechanical SystemsJOSEPH PASATUROspecial
02/06/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/06/2024Concrete - Cast-In-PlaceJOSEPH PASATUROspecial
02/06/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOSEPH PASATUROspecial
02/06/2024Energy Code Compliance InspectionsJOSEPH PASATUROprogress
02/06/2024FinalJOSEPH PASATUROprogress
02/06/2024Footing and FoundationJOSEPH PASATUROprogress
02/06/2024Fire-Resistance Rated ConstructionJOSEPH PASATUROprogress
02/06/2024Structural Wood FrameJOSEPH PASATUROprogress
02/06/2024HVAC-R and service water heating system controlsJOSEPH PASATUROenergy_progress
02/06/2024HVAC-R and service water heating equipmentJOSEPH PASATUROenergy_progress
02/06/2024Fenestration areasJOSEPH PASATUROenergy_progress
02/06/2024Air barrier - visual inspectionJOSEPH PASATUROenergy_progress
02/06/2024Fenestration and door U-factor and product ratingsJOSEPH PASATUROenergy_progress
02/06/2024Electric vehicle service equipment requirementsJOSEPH PASATUROenergy_progress
02/06/2024HVAC-R and service water piping design and insulationJOSEPH PASATUROenergy_progress
02/06/2024Fenestration air leakageJOSEPH PASATUROenergy_progress
02/06/2024Air barrier — testing JOSEPH PASATUROenergy_progress
Latest 25 of 59.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026S00863898-I1Request digital key ↗
08/22/2026S00939527-I1Request digital key ↗
08/21/2026S00867932-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
09/27/2023540248631Open ↗
04/24/2023540248631Open ↗
02/27/2023520469350Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
10/03/2023540248631Open ↗
07/20/2023540248631Open ↗
07/20/2023540248631Open ↗
▸BISWORK PERMIT APPLICATION2
05/23/2023520469350Open ↗
11/16/2018540158345Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00867932-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026S00863898-I1Open ↗
08/21/2026S00867932-S1Open ↗
08/21/2026S00867932-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026S00867932-I1Open ↗
08/28/2026S00867932-I1Open ↗
08/25/2026S00867932-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026S00867932-I1Open ↗
08/28/2026S00867932-I1Open ↗
08/25/2026S00867932-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/24/2023540248631Open ↗
11/16/2018540158345Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/16/2018540158345Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/24/2023540248631Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/16/2018540158345Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸BISSEWER CUT-OFF1
05/23/2023520469350Open ↗
▸BISGAS CUT-OFF1
05/23/2023520469350Open ↗
▸BISELECTRIC CUT-OFF1
05/23/2023520469350Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/23/2023520469350Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/23/2023520469350Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
11/16/2018540158345Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00867932-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00867932-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00867932-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/23/2023520469350Open ↗
11/16/2018540158345Open ↗
▸BISRODENT CONTROL1
05/23/2023520469350Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/10/2019540158345Open ↗
11/16/2018540158345Open ↗
11/16/2018540158345Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/16/2018540158345Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/10/2019540158345Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/16/2018540158345Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
05/10/2019540158345Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/10/2019540158345Open ↗
05/10/2019540158345Open ↗
11/16/2018540158345Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/16/2018540158345Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/23/2023520469350Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00867932-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/23/2023520469350Open ↗
05/23/2023520469350Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
10/03/2023540248631Open ↗
07/20/2023540248631Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/23/2023520469350Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
05/10/2019540158345Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/10/2019540158345Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01087433-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
05/10/2019540158345Open ↗
05/06/2019540158345Open ↗
11/16/2018540158345Open ↗
▸BISWC-DB-100 (Replaces Form C-105-21)Affidavit for NY Entities And Any Out of State Entities with no employees1
05/23/2023520469350Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/23/2023520469350Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION3
10/03/2023540248631Open ↗
05/06/2019540158345Open ↗
03/26/2019540158345Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
04/24/2023540248631Open ↗
11/16/2018540158345Open ↗
▸BISEFILING COVER SHEET1
02/27/2023520469350Open ↗
▸BISBOROUGH INTAKE FORM1
04/18/2019540158345Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION5
10/03/2023540248631Open ↗
10/03/2023540248631Open ↗
10/03/2023540248631Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
05/23/2023520469350Open ↗
05/23/2023520469350Open ↗
11/16/2018540158345Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/23/2023520469350Open ↗
05/23/2023520469350Open ↗
▸DOB NOWSite Survey: Initial2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S00867932-I1Open ↗
08/13/2026S00867932-P2Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
05/23/2023520469350Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00867932-I1Open ↗