ECB08/25/2026At exp 3 (rear) observed a horizontal/ vertical extension in progress of being framed. One extension approx 16'd x 24'w. Second extension approx 20'w x 16'd. Work is partially framed walls and sheathing. Work i$2K due
ECB08/25/2026Observed at exp 4 minsiplit ac installed with unpermitted electrical disconnect., obtain permit$1K due
DOB08/25/2026Undocumented/ unpermitted rear yard horizontal and vertical extension on new concrete base. Second floor extension.
DOB08/25/2026Unpermitted/undocumented horizontal and vertical extension at rear yard. Structural stability is unknown.
ECB08/25/2026Observed at exp 2 large pile of combustible construction debris accessible by the public. Approx 20 yrds of wood, foam insulation, vinyl siding etc., repair and/replace$2K due
ECB05/20/2011New building (NB 500642281) occupied w/o a valid c of o. Noted last inspection occurred 12/9/04 resulting in 27 outstanding required items. (0) objections & (0) checklist items. Remedy: discontinue illegal useNothing owed — awaiting certificate of correction
ECB03/05/2011New bldg (NB 500 642 281) occupied w/o a valid cert of occupancy last c/p ispection occurred 12/09/04 resulting in 27 outstanding required items 0 objections,0 outstanding checklist items. Rem:obtain valid certNothing owed — awaiting certificate of correction
ECB01/13/2011New building (NB 500642281) occupied w/o a valid c of o. Noted: last c/o insp occurred 12/9/04 resulting in (27) outstanding required items,(0) construction inspection & (0) outstanding checklist items. BuildinNothing owed — awaiting certificate of correction
ECB05/04/2010New bldg occupied w/o a valid cert of occupancy.noted last inspection of note 12/09/2004 for n/b #500642281 has not been signed off,no c of o has been obtained for location.remedy:obtain a valid c of o.Nothing owed — awaiting certificate of correction