Two family frame
10 MANORVILLE COURT
STATEN ISLAND · BIN 5045055
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R2Zoning
3,300 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 12,800 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSolar panel installation on existing roofUnder Construction8p · 2 filings · 20 docs
Floor 2Under Construction33p · 2 filings · 20 docs
Floor 1Under Construction29p · 2 filings · 20 docs
CellarUnder Construction25p · 2 filings · 20 docs
Site & exteriorUnder Construction3p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM Engineering109/16/2026
HC Engineering606/02/2026
RAS PE Consulting Engineers408/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dawn Ponisi503/21/2026
CH Cornerstone Design303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alka ContractingGeneral Contractor407/08/2026
AK General ContractorGeneral Contractor307/08/2026
Mksskr Consulting ServiceGeneral Contractor107/08/2026
Alka ContractingScaffold104/09/2026
Mksskr Consulting ServiceScaffold107/08/2026
Harvest Powerspecialty_contractor109/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244109/16/2026
Avid Designs453310/16/2023
SRA Planning & Expediting5677209/11/2023
Building Lifecycle
10/01/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
S01440663-I1-SL
09/29/2026
Permit issued — Solar
S01440663-I1-SL
09/16/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
S01440663-I1
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/04/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedHarvest Power09/29/2026
DOB NOWSupport of ExcavationPermit IssuedAK General Contractor05/27/2026
DOB NOWStructuralPermit IssuedAK General Contractor05/26/2026
DOB NOWFoundationPermit IssuedAK General Contractor05/21/2026
DOB NOWConstruction FencePermit IssuedMksskr Consulting Service05/19/2026
DOB NOWGeneral ConstructionPermit IssuedMksskr Consulting Service05/18/2026
DOB NOWStructuralPermit IssuedAlka Contracting11/12/2025
DOB NOWFoundationPermit IssuedAlka Contracting09/15/2025
DOB NOWSupport of ExcavationPermit IssuedAlka Contracting08/14/2025
DOB NOWConstruction FencePermit IssuedAlka Contracting07/21/2025
DOB NOWGeneral ConstructionPermit IssuedAlka Contracting07/08/2025
1 project · most recent 06/02/2026
Gas
FiledStatusContractorScope
06/02/2026——Gas
3 projects · most recent 07/22/2026
FiledStatusContractorScope
07/22/2026Permit IssuedApex Electric—
06/15/2026Permit IssuedIsland Electric—
07/11/2025Permit IssuedA & R Electrical Contracting—
1 project · most recent 06/02/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/02/2026Permit IssuedAK General ContractorSteel, Concrete, Masonry, Wood
1 project · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026Permit IssuedHarvest Power—
1 project · most recent 07/08/2025
Fence
FiledStatusContractorScope
07/08/2025Permit IssuedMksskr Consulting ServiceFence
1 project · most recent 06/02/2026
Earthwork
FiledStatusContractorScope
06/02/2026Permit IssuedAK General ContractorEarthwork
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
08/04/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/04/2026FinalNARESH MAHANGUprogress
08/04/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/04/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/04/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/21/2026Maintenance information—energy_progress
05/21/2026HVAC-R and service water heating system controls—energy_progress
05/21/2026HVAC-R and service water piping design and insulation—energy_progress
05/21/2026HVAC-R and service water heating equipment—energy_progress
05/21/2026Fire-Resistant Penetrations and Joints—special
08/25/2025Air barrier — testing WILLIAM MONTAGUEenergy_progress
08/25/2025Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
08/25/2025Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
08/25/2025Fenestration air leakageWILLIAM MONTAGUEenergy_progress
08/25/2025Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
08/25/2025Interior lighting powerWILLIAM MONTAGUEenergy_progress
08/25/2025Permanent certificateWILLIAM MONTAGUEenergy_progress
08/25/2025Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
08/25/2025HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
08/25/2025Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
08/25/2025HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
08/25/2025Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
08/25/2025Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
08/25/2025Construction Operations Influencing Adjacent StructuresWILLIAM MONTAGUEspecial
08/25/2025Mechanical SystemsWILLIAM MONTAGUEspecial
Latest 25 of 68.