BuildNYC
Hospital, sanitarium, mental institution
MSHS. Beth Israel Hospital
10 NATHAN D PERLMAN PLACE · Gramercy · BIN 1081661
💬 Discuss this project
1910Year Built
12Stories
I1Building Class
R8AZoning
331,459 sfGross Floor Area
1Units
LL97 Covered19 Active Violations 13 unresolved · 6 paperwork only 42 likely answered 5 old, status unconfirmed ▸FISP: UNSAFE
Hospital, sanitarium, mental institution · Owner of record: Beth Israel Hospital · 63,664 sf lot · 5.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMount Sinai Health System42p · 13 filings · 16 docs
BulkheadMount Sinai Health System1p · 1 filing · 8 docs
Floor 11Mount Sinai Health System35p · 8 filings · 17 docs
Floor 10
Floor 9Mount Sinai Health System15p · 2 filings · 16 docs
Floor 8Mount Sinai Health System15p · 2 filings · 16 docs
Floor 7Mount Sinai Health System16p · 2 filings · 16 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Mount Sinai Health System7p · 2 filings · 14 docs
Floor 1
CellarMount Sinai Health System6p · 1 filing · 8 docs
Sub-CellarMount Sinai Health System6p · 1 filing · 8 docs
BasementMount Sinai Health System1p · 1 filing · 10 docs
Sub-BasementMount Sinai Health System9p · 1 filing · 10 docs
Site & exteriorMount Sinai Health SystemUnder Construction11p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Continuum Health Partners10303/21/2026
Mount Sinai Health Systems1003/21/2026
Phoenix403/21/2026
St Lukes Hospital303/21/2026
Beth Israel Hospital203/22/2026
Bimc203/21/2026
Mount Sinai Queens203/21/2026
Blackstone Developers103/21/2026
Mount Sinai Hospital - Beth Isr103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants6303/21/2026
AE Design Solution603/21/2026
Eurocelt Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gilbane Building CompanyGeneral Contractor2507/08/2026
Spring ScaffoldingScaffold2310/15/2026
B & A Restoration Contractingspecialty_contractor603/21/2026
B & A Restoration ContractingScaffold403/21/2026
Albin Gustafson CompanyElectrical303/21/2026
Taggart AssociatesFire Protection303/21/2026
Par Plumbing CoPlumbing307/08/2026
Lawrence J. LevineFire Protection203/21/2026
Abco-Peerless SprinklerFire Protection203/21/2026
Cardoza PlumbingPlumbing207/08/2026
Current Fire ProtectionFire Protection207/08/2026
Schlesinger Elect'l ContractingElectrical103/22/2026
R & L SystemsElectrical103/21/2026
Consolidated ScaffoldingScaffold107/08/2026
Elpo Electrical ContgElectrical103/21/2026
Fresh Meadow Electrical ContractingElectrical103/21/2026
Integral Electrical PWR & CNTRElectrical103/21/2026
VTL Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423510/02/2023
Outsource Special Inspection28271007/13/2023
Milrose Consultants2003903/01/2022
Special Inspection Services1200702/25/2022
Stratford Engineering997104/27/2021
Building Lifecycle
All (260)Filed (37)Permit Issued (42)Signed Off (23)Facade (FISP) (54)Violation (60)Inspection (10)Objection (4)Special Inspection (30)
10/14/2026
Permit issued — Sidewalk Shed
M00415129-I1-SH
09/04/2026
Violation issued (ECB, open)
Construction
06/17/2026
Permit issued — Sidewalk Shed
M00415129-I1-SH
04/20/2026
Violation issued (ECB, open)
Local Law
04/20/2026
Violation issued (ECB, open)
Local Law
04/20/2026
Violation issued (ECB, open)
Local Law
03/18/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2026
Permit issued — Sidewalk Shed
M00415129-I1-SH
01/15/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2025
Permit issued — Sidewalk Shed
M00415129-I1-SH
06/17/2024
Cycle 9 facade report submitted
06/17/2024
Cycle 9 facade report signed — UNSAFE
06/17/2024
Cycle 9 facade report submitted
06/17/2024
Cycle 9 facade report signed — UNSAFE
06/17/2024
Cycle 9 facade report submitted
06/17/2024
Cycle 9 facade report signed — UNSAFE
06/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/14/2024
Cycle 9 facade inspection completed
05/14/2024
Cycle 9 facade inspection completed
05/10/2024
Cycle 9 facade inspection completed
03/20/2024
Permit issued — Sidewalk Shed
M00415129-I1-SH
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/12/2024
Violation issued (ECB, open)
Local Law
02/12/2024
Violation issued (ECB, open)
Local Law
01/16/2024
Violation issued (ECB, open)
Local Law
12/22/2023
Cycle 9 facade report submitted
12/22/2023
Cycle 9 facade report signed — SAFE
11/28/2023
Cycle 9 facade inspection completed
11/01/2023
Signed off — Alteration
CUT AND CAP 4 inch CHWS&R AT FOUNDATION WALL AND WHERE SHOWN IN MER ON CELLAR LEVEL. WALLRESTORATION BY OTHERS.CUT AND CAP 8 inch STEAM AT FOUNDATION WALL AND WHERE SHOWNIN MER ON CELLAR LEVEL. WALLRESTORATION BY OTHERS.
M00854446-I1
10/27/2023
Signed off — Alteration
Herewith filing for facade infill project at dazian pavilion on the second floor facade. No change in use, egress, or occupancy.
M00854444-I1
10/02/2023
Filed — Alteration
Herewith filing for facade infill project at dazian pavilion on the second floor facade. No change in use, egress, or occupancy.
M00854444-P2
09/29/2023
Special inspection requirement — Final
Young Suh
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/22/2023
Permit issued — Mechanical Systems
M00854446-I1-MS
09/01/2023
Signed off — Alteration
herewith filing to plug existing RW and condensate drain piping at existing vertical leader at levels 1-2
M00854447-I1
08/18/2023
Filed — Alteration
CUT AND CAP 4 inch CHWS&R AT FOUNDATION WALL AND WHERE SHOWN IN MER ON CELLAR LEVEL. WALLRESTORATION BY OTHERS.CUT AND CAP 8 inch STEAM AT FOUNDATION WALL AND WHERE SHOWNIN MER ON CELLAR LEVEL. WALLRESTORATION BY OTHERS.
M00854446-P1
08/17/2023
Permit issued — General Construction
M00854444-I1-GC
08/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/15/2023
Filed — Alteration
Herewith filing for facade infill project at dazian pavilion on the second floor facade. No change in use, egress, or occupancy.
M00854444-P1
08/08/2023
Special inspection requirement — Final
Young Suh
08/08/2023
Special inspection requirement — Mechanical Systems
Young Suh
08/08/2023
Special inspection requirement — Final
Young Suh
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/28/2023
Cycle 8 facade report signed — SAFE
07/25/2023
Signed off — Alteration
M00843750-I1
07/24/2023
Signed off — Alteration
The addition of new ductwork platform/frames on the roof of silver building at 340 East 17th Street as detailed on drawings not limited to the installation of supplemental steel frames for the support of new ductwork for the isolation room exhaust.
M00843782-I1
07/24/2023
Signed off — Alteration
Herewith filing for an exhaust upgrade to create three new infectious patient isolation room in MSBI Silver Pavilion. Work on floors include 7-9 + Karpus Building Roof. No change in use, egress, or occupancy.
M00843762-I1
07/17/2023
Signed off — Alteration
M00674502-I1
07/17/2023
Special inspection requirement — Final
JONAR MADRIAGA
07/17/2023
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
07/14/2023
Signed off — Alteration
Mount Sinai Silver Building FACADE MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00472580-I1
07/13/2023
Filed — Alteration
M00843750-P1
07/13/2023
Filed — Alteration
Herewith filing for an exhaust upgrade to create three new infectious patient isolation room in MSBI Silver Pavilion. Work on floors include 7-9 + Karpus Building Roof. No change in use, egress, or occupancy.
M00843762-P1
07/05/2023
Filed — Alteration
The addition of new ductwork platform/frames on the roof of silver building at 340 East 17th Street as detailed on drawings not limited to the installation of supplemental steel frames for the support of new ductwork for the isolation room exhaust.
M00843782-P1
Latest 60 of 260 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding10/14/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding06/17/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/16/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding02/27/2025
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/20/2024
DOB NOWMechanical SystemsSigned-offGilbane Building Company09/22/2023
DOB NOWGeneral ConstructionSigned-offGilbane Building Company08/17/2023
DOB NOWPlumbingSigned-offPar Plumbing Co07/05/2023
DOB NOWMechanical SystemsSigned-offGilbane Building Company06/12/2023
DOB NOWMechanical SystemsSigned-offGilbane Building Company04/20/2023
DOB NOWStructuralSigned-offGilbane Building Company04/20/2023
DOB NOWGeneral ConstructionSigned-offGilbane Building Company04/19/2023
DOB NOWGeneral ConstructionSigned-offB & A Restoration Contracting04/07/2023
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding02/27/2023
DOB NOWGeneral ConstructionSigned-offB & A Restoration Contracting05/25/2022
DOB NOWPlumbingSigned-offPar Plumbing Co05/17/2022
DOB NOWStructuralSigned-offGilbane Building Company04/06/2022
DOB NOWMechanical SystemsSigned-offGilbane Building Company04/04/2022
DOB NOWSprinklersSigned-offCurrent Fire Protection I03/29/2022
DOB NOWGeneral ConstructionSigned-offGilbane Building Company03/10/2022
DOB NOWMechanical SystemsSigned-offGilbane Building Company03/10/2022
DOB NOWStructuralSigned-offGilbane Building Company03/10/2022
DOB NOWStructuralSigned-offGilbane Building Company03/10/2022
DOB NOWGeneral ConstructionSigned-offGilbane Building Company03/02/2022
DOB NOWMechanical SystemsSigned-offGilbane Building Company03/02/2022
DOB NOWPlumbingSigned-offCardoza Plumbing03/02/2022
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/02/2022
DOB NOWPlumbingSigned-offCardoza Plumbing01/28/2022
DOB NOWSprinklersSigned-offCurrent Fire Protection I01/28/2022
DOB NOWGeneral ConstructionSigned-offGilbane Building Company12/22/2021
DOB NOWMechanical SystemsSigned-offGilbane Building Company12/21/2021
DOB NOWMechanical SystemsSigned-offGilbane Building Company12/21/2021
DOB NOWGeneral ConstructionSigned-offB & A Restoration Contracting09/16/2021
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/04/2021
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding10/20/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/28/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/20/2019
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding07/19/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/27/2018
DOB NOWSupported ScaffoldPermit IssuedB & A Restoration Contracting11/09/2018
+ 52 more permits on file
8 projects · most recent 01/27/2023
General Wiring
FiledStatusContractorScope
01/27/2023CompleteHugh O'Kane Electric CoGeneral Wiring
02/18/2022CompleteDooley Electric CoGeneral Wiring
04/14/2021CompleteNead ElectricGeneral Wiring
03/04/2020Permit IssuedAlbin Gustafson Company—
02/20/2019Permit IssuedTop Shelf Electric—
02/20/2019CompleteTop Shelf Electric—
07/03/2018Permit IssuedTop Shelf Electric—
04/17/2018CompleteSchlesinger Elect'l ContractingGeneral Wiring
2 projects · most recent 04/27/2021
Steel Masonry
FiledStatusContractorScope
04/27/2021——Steel, Masonry
04/27/2021——Steel, Masonry
1 project · most recent 07/19/2019
Scaffold
FiledStatusContractorScope
07/19/2019Permit IssuedConsolidated ScaffoldingScaffold
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2022Certified Medical Gas - MG - PL - FinishCertifiedView ↗
06/06/2022Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
06/06/2022Certified Medical Gas - MG - PL - TestCertifiedView ↗
06/06/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
09/29/2023FinalYoung Suhprogress
09/29/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
08/08/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
08/08/2023FinalYoung Suhprogress
08/08/2023Mechanical SystemsYoung Suhspecial
08/08/2023FinalYoung Suhprogress
07/17/2023FinalJONAR MADRIAGAprogress
07/17/2023Mechanical SystemsJONAR MADRIAGAspecial
06/29/2023FinalJONAR MADRIAGAprogress
06/29/2023Mechanical SystemsJONAR MADRIAGAspecial
06/08/2023Post-installed AnchorsJONAR MADRIAGAspecial
06/08/2023FinalJONAR MADRIAGAprogress
06/08/2023Designated Seismic System—special
01/11/2023Post-installed AnchorsJONAR MADRIAGAspecial
01/11/2023Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
02/24/2022HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
02/24/2022Electrical motors and elevatorsJONAR MADRIAGAenergy_progress
02/16/2022Maintenance informationJONAR MADRIAGAenergy_progress
02/14/2022FinalJONAR MADRIAGAprogress
02/14/2022Post-installed AnchorsChristopher Drutjonsspecial
02/14/2022Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
02/14/2022Structural Steel - DetailsChristopher Drutjonsspecial
02/14/2022FinalChristopher Drutjonsprogress
02/14/2022Post-installed AnchorsJONAR MADRIAGAspecial
02/14/2022Structural Steel - DetailsJONAR MADRIAGAspecial
Latest 25 of 66.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mount Sinai Health SystemReligiousSub-cellar, Cellar, Sub-basement, Floors 2, 7–9, 11, 13–15, Roof
Project M00854446 Alteration · LOC Issued · 05/31/2023
Project M00854447 Alteration · LOC Issued · 05/31/2023
Project M00854444 Alteration · LOC Issued · 04/27/2023
Project M00843762 Alteration · LOC Issued · 04/04/2023
Project M00843750 Alteration · LOC Issued · 03/31/2023
Project M00843782 Alteration · LOC Issued · 03/31/2023
Project M00680332 Alteration · LOC Issued · 03/01/2022
Project M00674502 Alteration · LOC Issued · 02/25/2022
Project M00674511 Alteration · LOC Issued · 02/25/2022
Project M00680300 Alteration · LOC Issued · 02/25/2022
Project M00679954 Alteration · LOC Issued · 02/24/2022
Project M00680379 Alteration · LOC Issued · 02/24/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,405 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch34
09/06/2026M00049938-I1Request digital key ↗
09/06/2026M00058130-I1Request digital key ↗
09/03/2026M00503926-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00415129-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00196655-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00472580-I1Request digital key ↗
▸Applications & Permits287
▸BISPLAN / WORK APPROVAL APPLICATION144
10/26/2020140970705Open ↗
04/10/2020140895869Open ↗
10/24/2019123030148Open ↗
Showing 3 of 144 on file for this type
▸BISWORK PERMIT APPLICATION143
10/27/2020140970705Open ↗
06/17/2019140855064Open ↗
03/22/2019140838440Open ↗
Showing 3 of 143 on file for this type
▸Seals & Professional Certifications387
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION185
01/04/2019123481918Open ↗
01/04/2019123481918Open ↗
01/04/2019123481918Open ↗
Showing 3 of 185 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST42
04/09/2018123436193Open ↗
04/09/2018123436200Open ↗
01/10/2017122988758Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/05/2026M00196655-I1Open ↗
09/04/2026M00415129-I1Open ↗
09/03/2026M00472580-I1Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
10/07/2026M00472580-I1Open ↗
10/07/2026M00472580-I1Open ↗
09/01/2026M00854444-P2Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
10/07/2026M00472580-I1Open ↗
10/07/2026M00472580-I1Open ↗
10/07/2026M00472580-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
10/26/2020140970705Open ↗
06/17/2019140855064Open ↗
03/21/2019140838440Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
10/26/2020140970705Open ↗
06/17/2019140855064Open ↗
03/21/2019140838440Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
10/26/2020140970705Open ↗
06/17/2019140855064Open ↗
03/21/2019140838440Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/10/2020140895869Open ↗
▸Trade Schedules & Equipment144
▸BISSELF-CERT PLUMBING NOTICE63
09/09/2015121813751Open ↗
09/02/2015121813751Open ↗
Showing 2 of 63 on file for this type
▸BISSCHEDULE B - PLUMBING52
03/21/2019140838440Open ↗
Showing 1 of 52 on file for this type
▸BISSPRINKLER INSP REPORT : FP-859
09/09/2015121813751Open ↗
Showing 1 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
04/09/2018123436200Open ↗
04/09/2018123436193Open ↗
01/10/2017122988758Open ↗
Showing 3 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
05/13/2021123030148Open ↗
02/15/2018121820155Open ↗
12/28/2017121820155Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/21/2019140838440Open ↗
Showing 1 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
01/10/2017122988758Open ↗
01/10/2017122988758Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos98
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
06/17/2019140855064Open ↗
03/21/2019140838440Open ↗
10/16/2018123481918Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/03/2026M00615841-I1Open ↗
09/03/2026M00625928-I1Open ↗
09/02/2026M00681269-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00622889-I1Open ↗
09/03/2026M00622855-I1Open ↗
09/03/2026M00622872-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance51
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
01/04/2019123481918Open ↗
10/16/2018123481918Open ↗
08/31/2018123436200Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/12/2020140855064Open ↗
08/31/2018123436200Open ↗
11/19/2015121662815Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/12/2020140855064Open ↗
06/17/2019140855064Open ↗
03/21/2019140838440Open ↗
▸DOB NOWEN2: As Built Energy Analysis3
08/14/2026M00680277-I1Open ↗
08/13/2026M00674502-I1Open ↗
08/15/2026M00472580-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/17/2019140855064Open ↗
03/21/2019140838440Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00674502-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
11/12/2020140855064Open ↗
10/27/2020140970705Open ↗
10/26/2020140970705Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs156
▸BISADMINISTRATIVE OBJECTIONS52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter36
09/05/2026M00196655-I1Open ↗
09/03/2026M00615841-I1Open ↗
09/03/2026M00622889-I1Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
03/24/2025140970705Open ↗
08/20/2021123030148Open ↗
11/12/2020140855064Open ↗
Showing 3 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION31
04/09/2018123436193Open ↗
11/19/2015121662815Open ↗
11/12/2015121892032Open ↗
Showing 3 of 31 on file for this type
▸BISMEDICAL GAS INST CERT : LETTER-MED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/15/2026M00472580-I1Open ↗
▸Cost, Insurance & Ownership102
▸BISCOST AFFIDAVIT102
08/20/2021123030148Open ↗
11/12/2020140855064Open ↗
04/10/2020140895869Open ↗
Showing 3 of 102 on file for this type
▸Filing & Intake Forms105
▸BISEFILING COVER SHEET69
10/16/2018123481918Open ↗
04/13/2018123442952Open ↗
04/09/2018123436200Open ↗
Showing 3 of 69 on file for this type
▸BISADDITIONAL INFORMATION19
11/12/2020140855064Open ↗
10/04/2019140855064Open ↗
04/04/2016122416723Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
10/26/2020140970705Open ↗
04/10/2020140895869Open ↗
06/17/2019140855064Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
10/24/2019123030148Open ↗
10/11/2018123436193Open ↗
08/31/2018123436200Open ↗
Showing 3 of 5 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION16
03/24/2025140970705Open ↗
03/21/2025140970705Open ↗
10/16/2018123481918Open ↗
Showing 3 of 16 on file for this type
▸BISSupporting Document: Fee Exempt2
04/10/2020140895869Open ↗
Showing 1 of 2 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
10/26/2020140970705Open ↗
Showing 1 of 2 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Deferment1
01/10/2017122989604Open ↗