← Back
BuildNYC
Elevator cooperative
10 PLAZA STREET EAST
BROOKLYN · Park Slope · BIN 3029306
💬 Discuss this project
1959Year Built
15Stories
D4Building Class
R8XZoning
163,000 sfGross Floor Area
144Units
LL97 CoveredRent Stabilized1 Active Violation 5 likely answered ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Plaza Prospect Apt · 14,700 sf lot · 11.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRooftop antenna installation4p · 2 filings · 16 docs
Penthouse1 filing
Floor 16Unit 16D1p · 2 filings · 10 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9F, Unit 9G, Unit 9FG5p · 2 filings · 12 docs
Floor 8Unit 8C3p · 1 filing · 3 docs
Floor 7
Floor 6
Floor 5
Floor 4Unit 4G, Unit 4H1p · 1 filing · 4 docs
Floor 3Unit 3F, Unit 3G13p · 1 filing · 9 docs
Floor 2
Floor 1Dental office partitions and finishes11p · 2 filings · 20 docs
CellarUpper and Lower Level Garage Repairs5p · 2 filings · 18 docs
Sub-CellarRooftop antenna installation1p · 1 filing · 6 docs
Site & exteriorMaxwell-kates, INC.12p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Plaza Prospect Apt4303/22/2026
Nat Associates203/21/2026
SL LL RK SJL IR Trust203/21/2026
Vitta Dental Studio103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
John Patrick Cunningham210/20/2026
Cowley Engineering403/03/2026
Eab Engineering306/06/2025
Richard Kornblau605/29/2025
KMB Design Group201/24/2025
Lara Apelian Studio210/04/2023
Darryl Scherba Consulting204/24/2023
Parkbench Architects108/31/2022
Ashraf101/29/2022
Baileys Engineering103/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rennon Construction103/21/2026
Theresa Voltaggio403/21/2026
Construction Permit Services203/21/2026
Agouti Construction Consulting203/21/2026
AE Design Solution203/21/2026
Municipal Building Consultants603/21/2026
EA Design Group203/21/2026
Bodnar Architecture P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Orbit Plumbing & HeatingPlumbing507/08/2026
Rama Construction GroupGeneral Contractor407/08/2026
MNR GroupGeneral Contractor407/08/2026
Precision WorldwideGeneral Contractor303/21/2026
Everest ScaffoldingScaffold307/08/2026
Rennon ConstructionScaffold307/08/2026
Macintosh ElectricElectrical303/22/2026
BMC PlumbingPlumbing303/21/2026
Precision Worldwidespecialty_contractor303/21/2026
Prime RenovationsGeneral Contractor203/21/2026
Empire Scaffolding SystemsGeneral Contractor103/21/2026
Etna ContractingGeneral Contractor103/21/2026
FSM ElectricalElectrical103/22/2026
Mon-RadGeneral Contractor104/09/2026
M W WaterproofingGeneral Contractor103/21/2026
Patron ConstructionGeneral Contractor103/21/2026
Rama General ConstructionGeneral Contractor103/21/2026
Rockledge ScaffoldingGeneral Contractor103/21/2026
S E Building MaintenanceGeneral Contractor103/21/2026
Solex ConstructionGeneral Contractor103/21/2026
TBRGeneral Contractor103/21/2026
Aqueduct Plumbing MechanicalPlumbing103/21/2026
Emr MechanicalPlumbing103/21/2026
Joseph Ferrigno Plumbing & HeatingPlumbing103/21/2026
Tristruxspecialty_contractor103/21/2026
Tristruxspecialty_contractor103/21/2026
Aqua Plumbing & HeatingPlumbing107/08/2026
Demar MechanicalPlumbing107/08/2026
Kepler Electrical ContElectrical103/22/2026
Top Notch ElectricElectrical103/22/2026
AbileneGeneral Contractor103/21/2026
Adelphi RestorationGeneral Contractor207/06/2018
Aladdin PLG HeatingPlumbing111/30/1999
Aladdin PlumbingPlumbing105/13/2004
Alladdin Plumbing & HeatingPlumbing110/11/2000
Alpine WoodworksGeneral Contractor107/24/1998
Bowen PlumbingPlumbing108/17/1998
BZ Construction of NYGeneral Contractor106/17/2020
Etna ContrngGeneral Contractor109/15/2006
Everest RestorationGeneral Contractor110/06/1998
Everest ScaffoldingGeneral Contractor207/17/2012
Gary J LongPlumbing109/22/1998
Jon C HawkinsGeneral Contractor112/05/1997
K.F. Perfect ConstructionGeneral Contractor108/08/2011
New Amsterdam Building SoGeneral Contractor106/13/2014
Rennovations UnlimitedGeneral Contractor105/13/2004
Renovations UnlimitedGeneral Contractor210/11/2000
Tower Building RestorationGeneral Contractor109/20/2000
Tower BuildingGeneral Contractor103/23/2005
Tower Building RestorationGeneral Contractor309/20/2000
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cowley Engineering186403/03/2026
AG Engineering8899203/03/2026
Eab Engineering2048206/06/2025
Richard B. Kornblau, AIA3208405/29/2025
KMB Design Group513201/24/2025
Ans Consultants1768110/04/2023
March Chadwick, Architect2253108/31/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/13/2026
Objection resolved — Resolved
11/05/2026
Objection raised — Q-7.1.a. (p) Construction Mate
11/05/2026
Objection raised — Q-5.0.a. Tests and Special/Pro
11/05/2026
Objection raised — C-5.1. Piping – Penetration of
279 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedMNR Group04/27/2026
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating07/25/2025
DOB NOWGeneral ConstructionSigned-offMon-Rad07/17/2025
DOB NOWGeneral ConstructionSigned-offMNR Group05/06/2025
DOB NOWGeneral ConstructionSigned-offPrecision Worldwide08/20/2024
DOB NOWAntennaSigned-offTristrux03/11/2024
DOB NOWPlumbingSigned-offDemar Mechanical12/01/2023
DOB NOWGeneral ConstructionSigned-offPrime Renovations11/09/2023
DOB NOWPlumbingSigned-offAqua Plumbing & Heating07/21/2023
DOB NOWMechanical SystemsSigned-offPrecision Worldwide07/14/2023
DOB NOWGeneral ConstructionSigned-offRama Construction Group06/04/2023
DOB NOWSidewalk ShedSigned-offRennon Construction02/03/2023
DOB NOWGeneral ConstructionSigned-offMNR Group01/06/2023
DOB NOWGeneral ConstructionSigned-offRama Construction Group10/22/2022
DOB NOWSidewalk ShedSigned-offRennon Construction01/31/2022
DOB NOWGeneral ConstructionSigned-offMNR Group12/09/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating06/23/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/25/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/12/2018
BISOTISSUEDRama General Construction09/04/2020
BISOTISSUEDBZ Construction of NY06/17/2020
BISOTISSUEDAdelphi Restoration07/06/2018
BISOTISSUEDAdelphi Restoration06/07/2018
BISPLISSUEDVSP Mechanical02/21/2017
BISOTISSUEDSolex Construction02/14/2017
BISOTISSUEDRama General Construction04/22/2015
BISPLISSUEDAqueduct Plumbing & Mechanical02/06/2015
BISOTISSUEDNew Amsterdam Building So06/13/2014
BISPLISSUEDBell Fuel Oil04/17/2013
BISBLISSUEDBell Fuel Oil04/17/2013
BISEQISSUEDPatron Construction01/15/2013
BISEQISSUEDEverest Scaffolding07/17/2012
BISOTISSUEDEtna Contracting07/12/2012
BISOTISSUEDAbilene04/27/2012
BISPLISSUEDBell Fuel Oil04/27/2012
BISPLISSUEDOrbit Plumbing & Heating08/30/2011
BISOTISSUEDK.F. Perfect Construction08/08/2011
BISEQISSUEDEverest Scaffolding05/12/2008
BISOTISSUEDEtna Contracting02/04/2008
BISOTISSUEDEtna Contracting07/18/2007
+ 26 more permits on file
1 project · most recent 10/20/2026
Water/Sanitary
FiledStatusContractorScope
10/20/2026——Water/Sanitary
25 projects · most recent 10/13/2026
General Wiring
FiledStatusContractorScope
10/13/2026Permit IssuedMacintosh ElectricGeneral Wiring
06/09/2026Permit IssuedMacintosh ElectricGeneral Wiring
12/08/2025CompleteFSM ElectricalGeneral Wiring
09/30/2025CompleteTitanium Electrical—
04/10/2025CompleteMacintosh ElectricGeneral Wiring
01/13/2025CompleteMacintosh ElectricGeneral Wiring
12/05/2024CompleteDaven ElectricGeneral Wiring
10/28/2024CompleteRedgrave Electl Maintnce—
09/25/2024CompleteMacintosh ElectricGeneral Wiring
08/11/2024CompleteKepler Electrical Cont—
07/25/2024CompleteRobert ChimentiGeneral Wiring
01/25/2024CompleteMacintosh ElectricGeneral Wiring
12/08/2023CompleteTop Notch ElectricGeneral Wiring
06/19/2023CompleteJoseph Weinstein ElectricGeneral Wiring
04/06/2023CompleteMacintosh ElectricGeneral Wiring
1 project · most recent 04/16/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/16/2026Permit IssuedBuildrite ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
10/15/2026Energy Code Compliance Inspections—progress
10/15/2026Fire-Resistant Penetrations and Joints—special
10/15/2026Final—progress
10/15/2026Energy Code Compliance Inspections—progress
10/15/2026Lighting in dwelling units—energy_progress
10/15/2026Fire-Resistant Penetrations and Joints—special
03/05/2026Post-installed AnchorsEric Cowleyspecial
03/05/2026FinalEric Cowleyprogress
03/05/2026Structural Stability – Alterations of existing buildingsEric Cowleyspecial
03/05/2026Concrete - Cast-In-PlaceEric Cowleyspecial
03/05/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
02/27/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
01/09/2026Concrete - Cast-In-PlaceEric Cowleyspecial
01/09/2026FinalEric Cowleyprogress
01/09/2026Post-installed AnchorsEric Cowleyspecial
01/09/2026Structural Stability – Alterations of existing buildingsEric Cowleyspecial
06/09/2025HVAC-R and service water heating equipmentRichard Kornblauenergy_progress
06/09/2025Energy Code Compliance InspectionsRichard Kornblauprogress
06/09/2025FinalRichard Kornblauprogress
06/09/2025Fire-Resistant Penetrations and JointsRichard Kornblauspecial
06/09/2025HVAC-R and service water heating system controlsRichard Kornblauenergy_progress
06/09/2025Interior lighting powerRichard Kornblauenergy_progress
06/09/2025HVAC-R and service water piping design and insulationRichard Kornblauenergy_progress
06/09/2025Lighting controlsRichard Kornblauenergy_progress
06/09/2025Mechanical SystemsRichard Kornblauspecial
Latest 25 of 57.
355 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account