← Back
Other miscellaneous
10 PROL PLACE
STATEN ISLAND · BIN 5110756
💬 Discuss this project
1990Year Built
1Stories
Z9Building Class
R3-1Zoning
15,000 sfGross Floor Area
1Units
Other miscellaneous · Owner of record: NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION · 81,158 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof4p · 1 filing · 5 docs
Floor 18p · 2 filings · 19 docs
Cellar80p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY DEPT. OF ENVIRONMENTA903/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BELFIORE DEVELOPMENT GROUP603/21/2026
HDR603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN P PICONE INCGeneral Contractor504/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351809/09/2025
Building Lifecycle
All (48)Filed (9)Permit Issued (3)Objection (6)Special Inspection (30)
10/15/2025
Permit issued — General Construction
S01093979-I1-GC-CX
09/09/2025
Filed — Alteration
Structural rehabilitation of existing Richmond Avenue Pumping Station Service Building.
S01093979-P1
08/28/2025
Permit issued — Mechanical Systems
S01093974-I1-MS
08/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/25/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/25/2025
Special inspection requirement — Final
Asma Hashmi
08/22/2025
Filed — Alteration
Provide intermittent ventilation of Pump Building Screen Room, Fan Room, Mechanical Room No.1; Electric heaters for Electrical Room, Generator Room, Future Generator Room, ATS Room, Fan Room, Mechanical Rooms No.1 and No.2, and Storage Rooms; Exhaust fan
S01093974-P1
08/19/2025
Filed — Alteration
Provide sump pumps and associated discharge piping and valves, hose bibbs for washdown; water heater for potable water; toilet, shower and lavatory fixtures; service sink; sanitary floor drains; building sewer; roof drains.
S01093976-P1
08/18/2025
Special inspection requirement — Masonry
Asma Hashmi
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
08/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
08/18/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/18/2025
Special inspection requirement — Structural Steel - Details
Asma Hashmi
08/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Asma Hashmi
08/18/2025
Special inspection requirement — Structural Steel - Welding
Asma Hashmi
08/18/2025
Special inspection requirement — Subgrade Inspections
Asma Hashmi
08/18/2025
Special inspection requirement — Final
Asma Hashmi
08/18/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Asma Hashmi
08/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Asma Hashmi
08/18/2025
Special inspection requirement — Footing and Foundation
Asma Hashmi
08/15/2025
Permit issued — General Construction
S01054444-I1-GC
07/24/2025
Objection raised — Scope
07/24/2025
Objection resolved — Addressed
07/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Rehabilitation of existing Richmond Avenue Pumping Station Service Building.
S01054444-P1
07/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Asma Hashmi
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
07/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
07/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Asma Hashmi
07/10/2025
Special inspection requirement — Air barrier - visual inspection
Asma Hashmi
07/10/2025
Special inspection requirement — Exterior lighting power
Asma Hashmi
07/10/2025
Special inspection requirement — Interior lighting power
Asma Hashmi
07/10/2025
Special inspection requirement — Fenestration air leakage
Asma Hashmi
07/10/2025
Special inspection requirement — Fenestration areas
Asma Hashmi
07/10/2025
Special inspection requirement — Maintenance information
Asma Hashmi
07/10/2025
Special inspection requirement — Insulation placement and R values
Asma Hashmi
03/13/2025
Objection resolved — Addressed
11/07/2024
Objection resolved — Addressed
10/29/2024
Objection raised — Scope
10/29/2024
Objection raised — Inspections
10/23/2024
Filed — Alteration
Provide intermittent ventilation of Pump Building Screen Room, Fan Room, Mechanical Room No.1; Electric heaters for Electrical Room, Generator Room, Future Generator Room, ATS Room, Fan Room, Mechanical Rooms No.1 and No.2, and Storage Rooms; Exhaust fan
S01093974-I1
10/10/2024
Filed — Alteration
Structural rehabilitation of existing Richmond Avenue Pumping Station Service Building.
S01093979-I1
09/24/2024
Filed — Alteration
Provide sump pumps and associated discharge piping and valves, hose bibbs for washdown; water heater for potable water; toilet, shower and lavatory fixtures; service sink; sanitary floor drains; building sewer; roof drains.
S01093976-I1
06/24/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Rehabilitation of existing Richmond Avenue Pumping Station Service Building.
S01054444-I1
02/24/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
S08033797-I1
11/09/2022
Special inspection requirement — Concrete - Cast-In-Place
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJOHN P PICONE INC10/15/2025
DOB NOWMechanical SystemsPermit IssuedJOHN P PICONE INC08/28/2025
DOB NOWGeneral ConstructionPermit IssuedJOHN P PICONE INC08/15/2025
1 project · most recent 08/19/2025
Water/Sanitary
FiledStatusContractorScope
08/19/2025——Water/Sanitary
1 project · most recent 09/09/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/09/2025Permit IssuedJOHN P PICONE INCSteel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/25/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/25/2025Mechanical SystemsAsma Hashmispecial
08/25/2025FinalAsma Hashmiprogress
08/18/2025MasonryAsma Hashmispecial
08/18/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/18/2025Energy Code Compliance InspectionsAsma Hashmiprogress
08/18/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
08/18/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/18/2025Post-installed AnchorsAsma Hashmispecial
08/18/2025Structural Steel - DetailsAsma Hashmispecial
08/18/2025Structural Steel - High Strength BoltingAsma Hashmispecial
08/18/2025Structural Steel - WeldingAsma Hashmispecial
08/18/2025Subgrade InspectionsAsma Hashmispecial
08/18/2025FinalAsma Hashmiprogress
08/18/2025Subsurface Conditions – Fill Placement & In-Place DensityAsma Hashmispecial
08/18/2025Concrete - Cast-In-PlaceAsma Hashmispecial
08/18/2025Footing and FoundationAsma Hashmiprogress
07/10/2025Fenestration and door U-factor and product ratingsAsma Hashmienergy_progress
07/10/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
07/10/2025Energy Code Compliance InspectionsAsma Hashmiprogress
07/10/2025Fire-Resistance Rated ConstructionAsma Hashmiprogress
07/10/2025Air barrier - visual inspectionAsma Hashmienergy_progress
07/10/2025Exterior lighting powerAsma Hashmienergy_progress
07/10/2025Interior lighting powerAsma Hashmienergy_progress
07/10/2025Fenestration air leakageAsma Hashmienergy_progress
Latest 25 of 47.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026S08033797-I1Request digital key ↗
08/21/2026S01054444-I1Request digital key ↗
08/21/2026S01054444-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026S01093979-I1Open ↗
08/13/2026S01093979-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01054444-P1Open ↗
08/13/2026S01054444-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature16
08/30/2026S01093974-I1Open ↗
08/28/2026S01093976-P1Open ↗
08/28/2026S01093976-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/30/2026S01093974-I1Open ↗
08/30/2026S01093974-I1Open ↗
08/28/2026S01093976-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026S08033797-I1Open ↗
08/18/2026S01093979-I1Open ↗
08/13/2026S01093974-P1Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/18/2026S01093979-I1Open ↗
08/13/2026S01093979-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01054444-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/18/2026S01093979-I1Open ↗
08/13/2026S01054444-I1Open ↗
08/13/2026S01054444-P1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/18/2026S01093979-I1Open ↗
08/13/2026S08033797-I1Open ↗
08/13/2026S01093979-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
08/18/2026S01093979-I1Open ↗
08/13/2026S08033797-I1Open ↗
08/13/2026S01093979-P1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents9
▸DOB NOWSite Survey: Initial5
08/18/2026S01093979-I1Open ↗
08/13/2026S01093979-P1Open ↗
08/13/2026S01054444-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram2
08/18/2026S01093979-I1Open ↗
08/13/2026S01093979-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/18/2026S01093979-I1Open ↗
08/13/2026S01093979-P1Open ↗