| Owner | Filings | Most Recent |
|---|---|---|
| RCPI LANDMARK PROPERTIES, LLC | 927 | 09/13/2026 |
| TISHMAN SPEYER PROPERTIES | 132 | 07/08/2026 |
| NBCUNIVERSAL | 17 | 07/08/2026 |
| RCPI HOLDCO LCC ATTN: KELLEY MARBURY | 1 | 03/22/2026 |
| RCPI HOLDCO LLC | 3 | 03/22/2026 |
| RCDI HOLDCO LCC AHN TRACE | 1 | 03/22/2026 |
| RCPI HOLDCO LCC TISHMAN S | 1 | 03/22/2026 |
| OWNERS OF 24 WEST 49TH ST | 1 | 03/22/2026 |
| RCPI TRUST | 63 | 03/22/2026 |
| ROCKEFELLER PROPERTIE | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| NOMAD R&D LLC | 1 | 09/10/2026 |
| SLCE ARCHITECTS | 11 | 07/01/2026 |
| MG ENGINEERING D.P.C. | 39 | 06/22/2026 |
| ROBERT DERECTOR ASSOCIATES | 14 | 06/09/2026 |
| GENSLER | 3 | 06/01/2026 |
| THORNTON TOMASETTI | 7 | 05/26/2026 |
| INCORPORATED ARCHITECTURE AND DESIG | 4 | 05/22/2026 |
| PLAN B ENGINEERING | 1 | 05/04/2026 |
| DIAZ ARCHITECTS INC.,PA | 1 | 04/20/2026 |
| ACTIVE DESIGN GROUP ENGINEERING | 18 | 03/02/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 14 | 09/18/2025 |
| BRAND ACCESS SOLUTIONS | 2 | 08/19/2025 |
| NYC FACADE ARCHITECTURE, PLLC | 4 | 06/10/2025 |
| WALTER T. GORMAN, P.E., P.C. | 3 | 05/06/2025 |
| MONTROY ARCHITECTURE PLLC | 1 | 02/20/2025 |
| TPG ARCHITECTURE, LLP | 1 | 07/18/2024 |
| HIGHLAND ASSOCIATES | 12 | 06/25/2024 |
| CUTRONA ARCHITECTURE PLLC | 1 | 02/15/2024 |
| MUESER RUTLEDGE CONSULTING ENGINEER | 1 | 10/12/2023 |
| AMA CONSULTING ENGINEERS, PC | 4 | 08/18/2023 |
| CUSTODIO CONSULTING, LLC | 10 | 08/01/2022 |
| AKF ENGINEERS, LLP | 3 | 07/29/2022 |
| SELLDORF ARCHITECTS | 2 | 07/22/2022 |
| ADVANTAGE ARCHITECTURE PLLC | 1 | 07/15/2022 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 2 | 04/25/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| GILLMAN CONSULTING | 90 | 03/21/2026 |
| GILMAN CONSULTANT | 74 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 34 | 03/21/2026 |
| WALTER T. GORMAN, PE, PC | 26 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 6 | 03/21/2026 |
| RIGGING CONSULTANTS | 4 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 25 | 03/21/2026 |
| DOMANI CONSULTING | 22 | 03/21/2026 |
| PATRICIA L. GASS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 87 | 09/13/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 17 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 16 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 14 | 07/08/2026 |
| ROBERT HINDMAN, INC | General Contractor | 11 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 10 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 9 | 09/18/2026 |
| COYLE CONTRACTING CORP | General Contractor | 7 | 07/08/2026 |
| THE MCKISSACH GROUP INC | General Contractor | 7 | 07/08/2026 |
| TOWER FIRE PROTECTION INC | Fire Protection | 4 | 07/08/2026 |
| OSMAN LTD | General Contractor | 4 | 03/21/2026 |
| KNS BUILDING REST. INC | General Contractor | 4 | 03/21/2026 |
| ASHLAND PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| CITILINE RESTORATION LLC | General Contractor | 3 | 08/26/2026 |
| ANTHONY LUCIANO | Electrical | 3 | 03/21/2026 |
| A&A PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 2 | 07/08/2026 |
| A + SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 2 | 03/21/2026 |
| PREFERRED SPKLR AND MECH | Fire Protection | 2 | 07/08/2026 |
| REEM PLBG & HTG CORP | Fire Protection | 2 | 07/08/2026 |
| BP MECHANICAL CORP | General Contractor | 2 | 03/21/2026 |
| JADS PRODUCTIONS, INC | General Contractor | 2 | 03/21/2026 |
| JKT CONSTRUCTION INC | General Contractor | 2 | 03/21/2026 |
| MASTER FIRE SYSTEMS INC | General Contractor | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SHAHRISH SHUVO ENGINEERIN | 8524 | 9 | 07/01/2026 |
| SOCOTEC ENGINEERING | 4983 | 25 | 06/09/2026 |
| SAG ENGINEERING & CONSULT | 608 | 1 | 04/20/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 24 | 03/02/2026 |
| WALTER T. GORMAN, P.E., P | 268 | 15 | 01/21/2026 |
| PSI AGENCY INC. | 254 | 25 | 12/05/2025 |
| MILROSE CONSULTANTS LLC | 2003 | 5 | 09/18/2025 |
| PCS ENGINEERING | 3745 | 2 | 06/09/2024 |
| HAWA ENGINEERING PC | 7982 | 3 | 08/18/2023 |
| NYC FACADE ARCHITECTURE | 9035 | 1 | 07/03/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SAFWAY ATLANTIC, LLC | 09/11/2026 |
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 09/11/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 08/26/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 08/24/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 08/24/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 08/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | CITILINE RESTORATION LLC | 07/09/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 07/02/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 06/29/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 06/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 06/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 06/16/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 06/10/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 06/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 06/01/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 06/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 05/28/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 05/20/2026 |
| DOB NOW | General Construction | Permit Issued | JACOBS DEVELOPMENT CORPOR | 05/18/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 05/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 05/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 04/29/2026 |
| DOB NOW | Standpipe | Signed-off | ABCO-PEERLESS SPRKLR CORP | 04/02/2026 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 04/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 03/24/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 03/16/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 01/29/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 12/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 12/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 12/12/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 12/12/2025 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 12/12/2025 |
| DOB NOW | Sprinklers | Signed-off | ASHLAR MECHANICAL CORP | 11/05/2025 |
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 09/04/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/02/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/01/2026 | Permit Issued | STRUCTURE TONE, LLC | Heating Systems | Heating Aaon RN-016 307,170 BTU · Rooftop Unit ×1 |
| 06/09/2026 | Permit Issued | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | — |
| 12/11/2025 | Permit Issued | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | — |
| 12/05/2025 | Permit Issued | STRUCTURE TONE, LLC | Heating Systems, Ventilation Systems | Heating Aaon V3-ERB-8-0-28FA-7MS 28,700 BTU · Ahu ×2 RN-016 307,421 BTU · Makeup Air ×4 V3-DRB-8-0-28FA-7HS 143,300 BTU · Ahu ×2 Indeeco QUA 85,300 BTU · Electric Heater ×8 Iec CPY03 5,118 BTU · Fan Coil Indoor ×2 Nortek CSU-18K EH/CHW 247,300 BTU · Ahu ×2 Qmark MUH0581 17,070 BTU · Electric Heater ×2 __Junk__ CWH35083 16,375 BTU · Electric Heater ×2 Ventilation Aaon V3-ERB-8-0-28FA-7MS 8,000 CFM · Ahu ×2 |
| 09/18/2025 | Permit Issued | STRUCTURE TONE, LLC | Cooling Towers, Refrigeration Systems | — |
| 06/13/2025 | Signed-off | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | — |
| 09/11/2024 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems | Heat / Cool Lg ARNU483B8A4 4 tons · Vrf Indoor ×12 ARNU363M2A4 3 tons · Vrf Indoor ×8 ARUM144BTE5 144 CFM · Vrf Outdoor ×4 ARUN060GSS4 60 CFM · Vrf Outdoor ×4 Cooling Heating |
| 05/25/2023 | — | — | Heating and Air Conditioning Systems | Heat / Cool Lg ARNU483B8A4 4 tons · Vrf Indoor ×3 ARNU303NJA4 3 tons · Vrf Indoor ×2 ARUM144BTE5 144,000 BTU · Vrf Outdoor ×1 ARUN060GSS4 60,000 BTU · Vrf Outdoor ×1 |
| 04/21/2022 | Permit Issued | ROBERT HINDMAN, INC | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 06/09/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 06/01/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 271 heads |
| 12/11/2025 | Permit Issued | SIRINA FIRE PROT CORP | Sprinkler System |
| 09/18/2025 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 03/28/2024 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 1 outlets |
| 08/18/2023 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 45 heads |
| 01/12/2023 | Permit Issued | PAR FIRE PROTECTION LLC | — |
| 07/18/2022 | — | — | — |
| 09/08/2021 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 8 heads |
| 09/16/2020 | Permit Issued | REEM PLBG & HTG CORP | 75 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 06/09/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 06/01/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 12/11/2025 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 12/05/2025 | Permit Issued | TRISTATE PLBG SVCS CORP | Storm, Water/Sanitary |
| 09/18/2025 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 03/28/2024 | Signed-off | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 05/23/2023 | Signed-off | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 09/08/2021 | Signed-off | EH PLUMBING & HEATING COR | Water/Sanitary |
| 09/16/2020 | — | — | — |
| 09/25/2019 | — | — | Water/Sanitary |
| — | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/10/2026 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| 08/07/2026 | Permit Issued | STRIANO ELECTRIC CO., INC | General Wiring |
| 06/08/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 06/08/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 06/08/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 05/28/2026 | Permit Issued | UNITY ELECTRIC CO., Inc | — |
| 05/28/2026 | Complete | UNITY ELECTRIC CO., Inc | — |
| 05/18/2026 | Complete | UNITY ELECTRIC CO., Inc | — |
| 04/02/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 03/24/2026 | Permit Issued | UNITY ELECTRIC CO. INC | — |
| 03/10/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 02/27/2026 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 02/15/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 02/15/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 10/21/2025 | Complete | KLEINKNECHT ELEC. CO.,INC | 1 meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2026 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| 06/09/2026 | Permit Issued | STRUCTURE TONE, LLC | Steel, Concrete |
| 12/11/2025 | Permit Issued | TRISTATE PLBG SVCS CORP | Steel, Concrete |
| 12/05/2025 | Permit Issued | STRUCTURE TONE, LLC | Steel, Concrete |
| 09/18/2025 | Permit Issued | STRUCTURE TONE, LLC | Steel, Concrete |
| 06/13/2025 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| 05/12/2023 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| 03/17/2023 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| — | — | — | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/10/2026 | Permit Issued | SAFWAY ATLANTIC, LLC | Fence, Scaffold, Sidewalk Shed |
| 08/19/2025 | Permit Issued | SAFWAY ATLANTIC, LLC | Fence |
| 09/21/2023 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/09/2024 | Permit Issued | PULLMAN SST INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/24/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 08/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/22/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/08/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/06/2026 | Certified Storm Drainage-ST-Piping-Water Test | Certified | View ↗ |
| 05/28/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/26/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 05/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/08/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/29/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/28/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 04/21/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 03/26/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/26/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/24/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 02/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/20/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/14/2026 | Sprayed fire-resistant materials | Shahrish Shuvo | special |
| 07/14/2026 | Luminous Exit Path Markings | Shahrish Shuvo | special |
| 07/14/2026 | Fire-Resistant Penetrations and Joints | Shahrish Shuvo | special |
| 07/14/2026 | Fire-Resistance Rated Construction | Shahrish Shuvo | progress |
| 07/14/2026 | Exterior Insulation and Finish Systems (EIFS) | Shahrish Shuvo | special |
| 06/24/2026 | Fire-Resistant Penetrations and Joints | Shahrish Shuvo | special |
| 06/24/2026 | Post-installed Anchors | Shahrish Shuvo | special |
| 06/10/2026 | Post-installed Anchors | Shahrish Shuvo | special |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | Shahrish Shuvo | special |
| 06/02/2026 | Final | Stephanie Lan | progress |
| 06/02/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 04/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 04/17/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 04/17/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |