2 Open Violations 1 unresolved · 1 paperwork only▸
DOB12/15/2022FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
ECB02/25/20251RCNY 103-09(3). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE,THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESSMENTNothing owed — awaiting certificate of correction
One family attached or semi-detached · 5,568 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.